HomeMy WebLinkAboutTED4003450.39ROCK LINING PAD SHALL BE QUARRY SPALLS WITH GRADATION AS
FOLLOWS:
PASSING 8—INCH SQUARE SIEVE: 100%
PASSING 3—INCH SQUARE SIEVE: 40 TO 60% MAX.
PASSING 3/4—INCH SQUARE SIEVE: 1 TO 10% MAX.
rol Q00 ni zTel=J1:1d
FILTER FABRIC
UNDER ROCK
1' ROCK
SECTION A —A
ROCK LINING PAD
NOT TO SCALE
Cal 2 Working Days Before You Dig
1-800-424-5555
lliiifies UU.-Awground Location Center
(ID,IyfT,ND,OR,WA)
* CHANNEL
PLAN
z
n
ch
w
0
z
w
.J
PLAN
END CAP OR PLUG (TYP)
-CLEAN OUT WYE
FROM PIPE (TYP)
- 6" PERF. PIPE
LAID FLAT/LEVEL
-TYPE I C.B.
W/SOLID LOCKING COVER
-3
INFLUENT PIPE
-(MAX. DESIGN FLOW
=0.5 CFS PER TRENCH)
-NOTCHED GRADE BOARD
2"X2" NOTCHES 18" O.C.
PIPE O.D.
NOTES:
1. THIS TRENCH SHALL BE CONSTRUCTED SO AS
TO PREVENT POINT DISCHARGE AND/OR EROSION.
3. TRENCH AND GRADE BOARD MUST BE LEVEL.
ALIGN TO FOLLOW CONTOURS OF SITE.
4. GRADE BOARD SUPPORT POST SPACING AS
REQ'D. BY SOIL CONDITIONS.
2"x12" PRESSURE TREATED
GRADE BOARD (LEVEL)
GALV. BOLTS
z
X
o v
o°OOOaO °
°
m
Q
m
°
oOo 0000°
4° ° °
CV
(D
DOo00$o0
°o°o oo00
O oo Ooo
°° 6° °°
° °oa o 0
Z
4"x4" SUPPORT POST
12" 12"
MIN.1 I MIN.
ELEVATION
FLOW DISPERSAL TRENCH DETAIL
NOT TO SCALE
CLEAN (<5% FINES)
3/4"-1 1/2" WASHED ROCK
6" PERF. PIPE
LAID FLAT WITH HOLES UP
- PIPE O.D.
_— FILTER FABRIC
FLOW LINE
THICKENED EDGE
EXTRUDED CURB
STORM DRAINS
NE 2ND PLACE
NOT TO SCALE
SURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS
1.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE —CONSTRUCTION MEETING MUST BE
HELD WITH THE CITY OF RENTON PLAN REVIEWER.
2.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 1996 STANDARD SPECIFICATIONS FOR ROAD,
BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS
ASSOCIATION (APWA), AS AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT.
3.
THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS,
WHICH ARE ON FILE IN THE PUBLIC WORKS DEPARTMENT. ANY DEVIATION FROM THE APPROVED PLANS
WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT, SURFACE
WATER UTILITY SECTION.
4.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN
PROGRESS.
z 5.
DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON PUBLIC WORKS
m
DEPARTMENT. REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.
O 6.
ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
ao
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND
~
THE POTENTIAL FOR ON —SITE EROSION HAS PASSED.
7.
ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR; TO OR IN
CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS
DEPARTMENT, SURFACE WATER UTILITY SECTION.
8,
GRASS SEED MAY BE APPLIED BY HYDROSEEDING, THE GRASS SEED MIXTURE, OTHER THAN CITY OF
RENTON APPROVED STANDARD MIXES, SHALL BE SUBMITTED BY A LANDSCAPE ARCHITECT AND APPROVED
BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
9.
ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE
WITH SECTION 7-02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD
AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE
TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING
MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A
UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA CLASS "C", WITH THE
EXCEPTION OF PVC PIPE. ALL TRENCH BACKFILL SHALL BE COMPACTED TO MINIMUM 95% FOR PAVEMENT
AND STRUCTURAL FILL AND 90% OTHERWISE PER ASTM D-1557-70. PEA GRAVEL BEDDING SHALL BE 6
INCHES OVER AND UNDER PVC PIPE.
10.
GALVANIZED STEEL PIPE AND ALUMINIZED STEEL PIPE FOR ALL DRAINAGE FACILITIES SHALL HAVE ASPHALT
TREATMENT #1 OR BETTER INSIDE AND OUTSIDE.
11.
STRUCTURES SHALL NOT BE PERMITTED WITHIN 10 FEET OF THE SPRING LINE OF ANY STORM DRAINAGE
PIPE, OR 15 FEET FROM THE TOP OF ANY CHANNEL BANK.
12.
ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
1 SECOND SUBMITTAL ESM 1/31/200 SURVEYED: SCALE: VERTICAL: NAVD 1988
2 THIRD SUBMITTAL ESM 10/22/201 C 1 DESIGNED: LV Ms"0 HORIZONTAL: NAD 1983/1991
3 FOURTH SUBMITTAL ESM 12/06/201 C m
4 MYLARS ESM 12/22/201 DRAWN
ONE INCH DATUM
5 CONSTRUCTION SET ESM 02/24/2011 CHECKED:
AT FULL SCALE
IF NOT ONE INCH
N J. REVISION BY DATE A P P R APPROVED_ SCALE ACCORDINGLY
SLOPE
PLAN VIEW OF ROOF
NTS
D ROAD
RAINAGE SYSTEM
2'X 10'
LEVEL TRENCH
W/PERF PIPE
RANDOM FILL
FILTER FMRIC
6•
,. •d• � 6'0 PERF PIPE
WASHED ROCK
—11— 1 1/2
24' MIN
TRENCH X—SECTION
NTS
TYPICAL RESIDENTIAL ROOFTOP
PERFORATED PIPE CONNECTION
NOT TO SCALE
L
0.5
I
FILTER FAE
CLEAN (S 5% FIN
1 1 /2" — 3/4" WASHED R(
6" PERFORATED F
OFFSITE I PROJECT SITE
1.5' MIN.
3. 0' MAX.
COLLECTION TRENCH
SURFACE WATER DRAINAGE NOTES AND SPECIFICATIONS (CONT.
13. OPEN CUT ROAD CROSSINGS THROUGH EXISTING PUBLIC RIGHT OF WAY WILL NOT BE ALLOWED UNLESS
SPECIFICALLY APPROVED BY CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS ADMINISTRATOR.
14. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY
ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING SPECIFICATIONS:
4 — 8 INCH ROCK / 40 — 70% PASSING;
2 — 4 INCH ROCK / 30 — 40% PASSING; AND
LESS THAN 2 INCH ROCK / 10 — 20% PASSING.
15. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM,
UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN ACCURATELY
DIMENSIONED, CERTIFIED AS —BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY
UPON COMPLETION.
16. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE THE
OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM SURFACE WATER
DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER
FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE, HEALTH AND
SAFETY OF THE PUBLIC AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK
COVERED BY THE CONTRACT. ANY WORK WITHIN THE TRAVELED RIGHT OF WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE PUBLIC WORKS
DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS
1-07-23 TRAFFIC CONTROL SHALL APPLY.
18. SPECIAL DRAINAGE MEASURES WILL BE REQUIRED IF THE PROJECT LOCATION IS WITHIN THE AQUIFER
PROTECTION AREA (APA).
R=345039
RECORD DRAWING
CITY OF GLADCO DEVELOPMENT, L.L.C.
ROSEWOOD HIGHLANDS P�LD0OOK
RENTON
DRAWING N0:
Planning/Building/Public works Dept. STORM DETAILS AND NOTES DT-01