Loading...
HomeMy WebLinkAboutTED4003450.6SCALE: 1' = 20' 20' 10, 0 20' 40' CONTOUR INTERVAL = 2' NOTE: ALL BUILDINGS, FENCES AND STRUCTURES TO BE REMOVED WITHIN PROJECT BOUNDARY. INTERCEPTOR SWALE WITH CHECK DAMS SEE DETAILS ON SHEET ER-03 EXISTING GRAVELED DRIVE. CONTRACTOR TO GAIN OWNER PERMISSION AND ADJUST GRADE USING SIMILAR MATERIAL AS REQUIRED. MAINTAIN ACCESS DURING CONSTRUCTION. SILT FENCE TO BE PLACED AT CLEARING LIMITS. SEE STD PLAN 214.00 ON SHEET ER-03 O I LLJ L Ljj tAJ W M z H Q �+ mmmumilI u - - --�- - --L I - - --0- - -O- A PORTION OF THE NW 1/4 OF SECTION 15 TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WASHINGTON cRmcAl AREA CLASS 3 WETLAND SIGNIFICANT 1 �Q� j� 392 TREES TO REMAIN I I I I I CLEARING LIMITS I SENSITIVE AREA � FP=402.75 BUFFER I FP=403.75 I FP=402.75 ` � � � -� FP=401.75 d- CHECKED FOR COMPLIANCE Tn rITY RTAN1)ARn_R „4, Cd 2 Working Days Before You Dig 1-800-424-5555 Unties Underground Location Center 0D,MT,ND,0R,WA) RENTON JOB NO. 0 0 I I I FP=400.75 ` \ \ II I f I I 1 / � I I I II ): / FP=391.25 FP=400.25 l 203+004I f / ,- I - NE 2ND - - - - - - r COURT- � , .-- i t FP=403.75 I t INTERCEPTOR SWALE WITH I CHECK DAMS SEE DETAILS ON SHEET ER-03 I i I / FP=401.25 I i In TOP 401.25 •I I FP=402.75 N I ^� ' 1 0 I o o TOP 402.75 i I (0 3966.75 ROCKERY DESIGN ' I BY OTHERS �T I FP=400.75 flB � I TOP 398.75 F I t I l l FP=398.75 \ I CATCH BASIN FILTER (TYP) PER STD PLAN OP 401.25 OT 396.75 FP=399.75 i FP=390.75 TESC POND I SURFACE AREA REQ'D=3,542 SF I SURFACE AREA PROVIDED=3,675 POND DEPTH=3.5 T I i l i l FP=399.25 I FP=390.25 j I 10 l i i Ii II FP=397.75 f STORMWATER VAULT FINISHED GRADE=395.00 216.30 ON SHEET ER-03 I ..----a --- _�..._�... �) I WET SEASON PROVISIONS INSTALL DOUBLE ROW OF SILT FENCE ALONG WETLAND AND STREAM BUFFER. i C NGPE FENCE TO BE PLACED [� AT CLEARING LIMITS. 1 I � 35 BUFFER I, I I TESC POND PER STD PLAN 216.00 ON II SHEET ER-03 SEE TABLE THIS SHEET FOR MORE INFORMATION I 6' EMERGENCY OVERFLOW SPILLWAY. ELEV =389.5 jI IQ ,I CRITICAL. AREA TYPE 4 STREAM IO.H.W.M. I I TESC POND OUTLET I I.E.=384.50, 12" 0 12" RISER I.E.=385.00, 12"0 PER DETAIL 216.10 ON SHEET ER-03 35' \ 104+00 - - - - - - - - - 1105+00 106+00 �\O NE 2ND PLACE CLEARING +- on 00 I / LIMITS I ' r -� L - ► --�► -�► . �.... . CONSTRUCTION ENTRANCE SEE DETAIL B068 ON SHEET ER-03 ' IQ 0 FIRST SUBMITTAL ESM 10/15/200 SURVEYED: SCALE HORIZONTAL: NAVD ,ses CITY OF 1 SECOND SUBMITTAL ESM 1/31/2 �•-20 HORIZONTAL: NAD ,sa3/,se, a� DESIGNED: 2 THIRD SUBMITTAL ESM 10/22/201 acx RENTON DRAWN � 3 FOURTH SUBMITTAL ESM 12/06/201 G1. ONE INCH DATUM 4 MYLARS ESM 112/22/2014 CHECKED: F NFULL aT ONE INCH Planning/Building,/Public Works Dept. I N 0. REVISION BY DATE I A P P R APPROVED: SCALE ACCORDINGLY NOTE: THE FOLLOWING MEASURES ARE REQUIRED FOR CONSTRUCTION DURING THE WET SEASON (OCTOBER 1 - APRIL 30) IN ADDITION TO THE STANDARD TESC MEASURES. 1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN (SECTION D.3.2). 2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS (SECTION D.3.2). 3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE (SECTION D.3.2). 4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON (SECTION D.3.2.5). 5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS (SECTION D.3.2.1). 6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SITE (SECTION D.3.3.1). 7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE -GRAINED SOIL (SECTION D.3.4.2). 8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.5). 9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.6). 10. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION ACTIVITY NEAR THE SURFACE WATERS (SECTION D.5.3). 11. ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND FILTER SYSTEMS, OR HOLDING TANKS. 12. THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY (SECTION D.5.4). TEMPORARY SEDIMENT POND SUB BASIN AREA OP 401.25 OT 396.75 FP=399.75 i FP=390.75 TESC POND I SURFACE AREA REQ'D=3,542 SF I SURFACE AREA PROVIDED=3,675 POND DEPTH=3.5 T I i l i l FP=399.25 I FP=390.25 j I 10 l i i Ii II FP=397.75 f STORMWATER VAULT FINISHED GRADE=395.00 216.30 ON SHEET ER-03 I ..----a --- _�..._�... �) I WET SEASON PROVISIONS INSTALL DOUBLE ROW OF SILT FENCE ALONG WETLAND AND STREAM BUFFER. i C NGPE FENCE TO BE PLACED [� AT CLEARING LIMITS. 1 I � 35 BUFFER I, I I TESC POND PER STD PLAN 216.00 ON II SHEET ER-03 SEE TABLE THIS SHEET FOR MORE INFORMATION I 6' EMERGENCY OVERFLOW SPILLWAY. ELEV =389.5 jI IQ ,I CRITICAL. AREA TYPE 4 STREAM IO.H.W.M. I I TESC POND OUTLET I I.E.=384.50, 12" 0 12" RISER I.E.=385.00, 12"0 PER DETAIL 216.10 ON SHEET ER-03 35' \ 104+00 - - - - - - - - - 1105+00 106+00 �\O NE 2ND PLACE CLEARING +- on 00 I / LIMITS I ' r -� L - ► --�► -�► . �.... . CONSTRUCTION ENTRANCE SEE DETAIL B068 ON SHEET ER-03 ' IQ 0 FIRST SUBMITTAL ESM 10/15/200 SURVEYED: SCALE HORIZONTAL: NAVD ,ses CITY OF 1 SECOND SUBMITTAL ESM 1/31/2 �•-20 HORIZONTAL: NAD ,sa3/,se, a� DESIGNED: 2 THIRD SUBMITTAL ESM 10/22/201 acx RENTON DRAWN � 3 FOURTH SUBMITTAL ESM 12/06/201 G1. ONE INCH DATUM 4 MYLARS ESM 112/22/2014 CHECKED: F NFULL aT ONE INCH Planning/Building,/Public Works Dept. I N 0. REVISION BY DATE I A P P R APPROVED: SCALE ACCORDINGLY NOTE: THE FOLLOWING MEASURES ARE REQUIRED FOR CONSTRUCTION DURING THE WET SEASON (OCTOBER 1 - APRIL 30) IN ADDITION TO THE STANDARD TESC MEASURES. 1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN (SECTION D.3.2). 2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS (SECTION D.3.2). 3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE (SECTION D.3.2). 4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON (SECTION D.3.2.5). 5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS (SECTION D.3.2.1). 6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SITE (SECTION D.3.3.1). 7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE -GRAINED SOIL (SECTION D.3.4.2). 8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.5). 9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW (SECTION D.3.6). 10. PHASING AND MORE CONSERVATIVE BMPS MUST BE EVALUATED FOR CONSTRUCTION ACTIVITY NEAR THE SURFACE WATERS (SECTION D.5.3). 11. ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND FILTER SYSTEMS, OR HOLDING TANKS. 12. THE FREQUENCY OF MAINTENANCE REVIEW INCREASES FROM MONTHLY TO WEEKLY (SECTION D.5.4). TEMPORARY SEDIMENT POND SUB BASIN AREA = 4.15 AC. INFLOW 10YR/15MIN = 1.77 CFS SURFACE AREA (REQ'D) = 3,542 S.F. SURFACE AREA PROVIDED = 3,675 S.F. POND DEPTH = 3.5' TOP BERM ELEV. = 390.5 EMERGENCY SPILLWAY ELEV. = 389.5 WATER SURFACE ELEV. = 388.5 EMERGENCY SPILLWAY WIDTH = 6.0' POND BOTTOM ELEV. = 385.0 POND TOP LENGTH = 105' POND TOP WIDTH = 35' DEWATERING ORIFICE DIA. = 2 7/16" DEWATERING TUBE DIA. = 6" RISER PIPE DIA. = 12" CONDITIONS FOR WET SEASON CONSTRUCTION 1. ANY CONSTRUCTION THAT WILL RESULT IN DISTURBED AREAS ON OR WITHIN A CRITICAL AREA OR ASSOCIATED BUFFER, SHALL BE SUBJECT TO THE "CRITICAL AREA RESTRICTIONS" CONTAINED IN THE ESC STANDARDS. THESE PROVISIONS INCLUDE PHASING THE PROJECT WHENEVER POSSIBLE SO THAT CONSTRUCTION IN THESE AREAS IS LIMITED TO THE DRY SEASON. 2. DURING CONSTRUCTION, ESC PLANS SHALL BE REVISED AS NECESSARY BY THE ESC SUPERVISOR OR AS DIRECTED BY THE CITY TO ADDRESS CHANGING SITE CONDITIONS, UNEXPECTED STORM EVENTS, OR NON-COMPLIANCE WITH THE ESC PERFORMANCE CRITERIA IN SECTION D.4.1 (P. D-69). IF NON-COMPLIANCE WITH THE ESC PERFORMANCE CRITERIA OCCURS, THE PLAN MUST BE UPDATED WITHIN 48 HOURS (FAILURE TO DO SO COULD RESULT IN A "STOP WORK" ORDER AS DETERMINED BY THE CITY INSPECTOR) OF INSPECTIONS OR INVESTIGATIONS. IMPLEMENTATION OF THE ONSITE CHANGES MUST OCCUR WITHIN 5 DAYS. 3. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR BASIS AS PRESCRIBED IN THE MAINTENANCE REQUIREMENTS FOR EACH BMP AND IN THIS SECTION. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY DURING THE WET SEASON, AND WITHIN 24 HOURS OF SIGNIFICANT STORMS. IN GENERAL, A SIGNIFICANT STORM IS ONE WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR LESS. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE KEPT ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS. GLADCO DEVELOPMENT, L.L.C. ROSEWOOD HIGHLANDS FIELDBOOK: PAGE: DRAWING NO: T.E.S.C. AND GRADING PLAN ER-02 SHEET: OF: 31 REMSIONS NO. DESCRIPTION DATE BY 0 FIRST SUBMITTAL 10/15/2007 ESM 1 SECOND SUBMITTAL 01/31/2008 ESM 2 THIRD SUBMITTAL 10/22/2010 ESM 3 FOURTH SUBMITTAL 12/06/2010 ESM 4 MYLARS 12/22/2010 ESM z ri z 3 0 U J Z < z J g Z = a w � �Z 0 93 J W Q Q W O • Q U O O w U Lij Q rJ v O0z z rz O U J j♦_ opq a cl+ J C/�(1%I CO ho L Cl) c cc it _0 D_ a U w z ® CC �w ss z W 0 C �o m o OD ID E z - (n N Q g N �0 o v J o C� cz O tn� z o�R _ Co, my m .> sa O"5 U U �m� E 3 ` L 3 OY 3 Oo so M3: C WV >-0 tea' L 42334 C/Sr� s�allilL,\ JOB NO.: 1352-001-006 DWG. NAME: ER-02 DESIGNED BY: KAO DRAWN BY: CLC CHECKED BY: DATE: 12/22/2010 DATE OF PRINT: ER-02 6 OF 3 1 SHEETS V