Loading...
HomeMy WebLinkAboutWWP2703450.1.p r N C T -0 .-CAI F _ F D?.� ,,1(11 4 C 1 A. )JUG I''AF N i I" h4 •J.; I;U3ULI { :i�3I- L _0 N I!� N nP�: '•Ir:E .. -� AS-1.4 ' 4 5T-`5 - P0L)'F'F?0P',.LE\E S--F 4 .A..__ BE INCLUD-D CNICP=TE P . CEP PIPE NC., )F A FII.PA1) FC,IlliI. '.i A , P I I , _,:%,D,I-R--'0L`•T'ROP)L 1E 0? CAST IN SIZE-F. . ,. R. .0 ._, ,F, 1F' ':•1H 482' J': 'dlh.. 5"MIN _4` ':4 r-l. 21" 1. L. =4 lAH 54" 11-.. P1R+ %•T" •,4 H. %'-' .D. 'J'-?IEis I. -TT S TO r- '01 'eF7GI`'YI - S!`,rr-'r STrr`. 2. =TEP= .AF.- -.., =E IN 'LACE EEF7:E IVA.'•K-CE -ECT10 = SFE ll.'TAL-ED. o, L A!S' s 10 E_ -E' rid%:NI10 ,FICNS -C ar Cr rR-CAS- .RGP:rTr. S. ALL .-011, 1`: a-Iw�-L HE :�KjII IEU. =6F? OI FS :4 I h..T P.I INTFF :IP s-Pr.•',C-S, CI . AW; C .ANNrl r.G, C.^.,TFf• (�FAI--)I 'A --I A HL^,H S•^.I CS L?FTH".P.F e`')',TINC; 4V.".c;F= `-,,r-AP05HIFI7 .^.? S-PEJ7-C E? =.L ECLOR OF COA-NC SH.=L_ BE W-I _- ,. '�r,.:hL _C •J:i'N S SIIAL_ U_ h CO"I 1111 T.SIPd -9. f I ^.r,r•.n I- -1 IT I%.I IF P, N' MI IM ,'•4 TI F Ir,'Irr r. i:rT Mrr, ,-P- -I lr I `f r - PIP-. 9, CCNr•EC-004S TO MAN-'J-E S-1;a_L BE `JADE JSI`,' CPS AGAPTCF., <OR N S-r._ B003 OF s YFOVaU E-�-A.L. IC. M NI Cl -fz FQUA TO !347 PFi• 17, TIIA'.. N! ---- iFfP Silr',I PA'F `SL.?rTRAC I':I: AN') -AL_ PF.OTEC Oh SYS--A HS-.AL-ED. Y BTD. PLAIT - 400.1 Yu13LiC Oaxr.-,, STANDARD SANITARY MANHOLE + DEPARTME T 1AARC11 20CH RECESSED LIFT POCKET %" - 11 N.C- SOCKET HE / SCREW 1 Y4' LONG \r (HRONZE OR S-S.) -! < x 2" RAISED PADS 1 c}• / 12 ya" 14' ,. 40K1 f 2" S„ Fes- 11" - 12 Ya` -- 14' - CAST IRON RING 2" A.C. �I ,t 6" CONCRETE CLASS 3000 45' 0 /8) PIEND 2'-C' FIBER. JOINT PACKING WATER TIGHT PLUG PIPE MATERIAL AS SPECIFIED BY THE ENGINEER PLUG TO BE SEALED IN SAME MANNER AS MAIN SEWER JOINTS. NOTLS- S" CLE.ANOUTS SHALL BE EAST JORDAN IRON WORKS, INC- No. 3698 OR EQUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY_ 2_ IN UNIMPROVED AREAS, POUR A 1'-0" THICK, 2'-0" SQUARE CONCRETE, CLASS 3000. PAD AROUND THE RING AND COVER. � O i 4 4 PUBLIC WORKS - DEPARTMENT 30 ao 0 Im o � N o � as i 0 o -+ 0 M m a w w o Call 2 Working Days Before You Dig z 1-800-424-5555 w " Utilities Ur derground Location Center u -0(D,MT,ID,0R,WA) a M. PLAN - 4QC9.1 8 OR 6 INCH CLEAN -OUT -- MARCH 2O08 �L-I UL-_ 'L "xr -FAR - C'I 23 _- lE (E86-Im" _'IA -bG ::DEL JEIh-_: f RENTON \, SEWER f/ COVER & FRAME PLAN VIEW D,. T.T =15 •v 7 Il f Lc _ '•;fw IY, COVER SECTION VIEW 1 7 I.� EU 1:4• ll_ ^AF IPP- N- 1'• r1-Pr •)l -- Cari •17 r 1 LL`_ 4r •i_ i= 118' B-A COVER BOTTOM VIEW ELT S07--i".L-EN E,`D) 5,;E" _I :_: 15 SS I'LJL'L ' 'Wfr -1 -I•: EON BOTTM DETAIL I, 4' U:rr] t I�16' Ljr r J CG�rr] GASKET GROOVE OFTAI FRAME SECTION VIEW 1. C,.- . I<.. .,H. •. I H .- . J1.,- I 1 . I F; As � 1 l( F�.rJ Iz^P•. ':,:I-'S N 1. F,::. '17r1 ')P =QAAI . 2. -SE FR.,4r- :.VD CC''c'ER =C 1 STO?h' (S=EC CR `WA-=R (SPECI= )' "''WATEP"':. EPLAN - 4M PUII:' i4DL4P=�5 - + i7F I(- him MANHOLE FRAME AND COVER bU1RCH 200fl I'S- - r•1CI I T`_ L.)F FIPE ti1 ._ 1� c J. - , B=G11I• V =,C1' „'dl-%'•R`i `-E'WER P -- N0--5: • :li l'. ..P.II -A'M=:111'F'+.i: 1IN A 1­ 1%1%1 1. H. N: -. , P J'•.CER H?,JNCHES. 3. CONFACT 3 I+G '•AATEPI.A- -D St' M;Ai,% CEr•1SIT• E'.CE=- DIP,EC--' r-''EP � PE. HAND -AMP CNL`'. 4- SEE ••E:VC';;vAT1CA Ar•D FF=PAFATION TREAC-" IN THE SAKI -AR`( -oeTR Sri'-�:N i_F T - F,T%�%r?. _�=-t'InC:,.T1(N = FIR 1Tmrr,:: QDTH •"c; .-'J:� TREK -1NO OF-ONS. --E ='_ ZCNE M-L 3E THE I1.', 11?I 1,1-1 Vill) II I. :;. MI h::l 11,: fCKI I I SIIA.. I CONI GPL; IC "I3A,t F1II1IN::" IN III !:A%AIA.:'` =,VEH E-EL_ CH GF 1-= L.•::LI' IHP, I't;i fS Ilk I -la :•_i A ;GI Ir IIIA% I'I a I :D:: I 01 UL`:Pd 1 1; S-IAL. NCB- BE USED 1%. T-i:-' &. ; KF -L 'MA-EPI%-_. C. PIPE Z'Y E HA-EPLA- S-IAL_ EE "'-DA1E_ EACF:FLL FC? CF,AINS" SD=CIF =D Ih Ti- .ACCFEGA-ES S-CTIOf. 0= THE S-AIND-.FC =CIF" >iTIC` Q 1. PIPE Fi a- DC .`4CIIC'=J IN SL,C A. F'AANET AS TC -N;URC FLC,'I LIH- PS '•AAIl`-,Tsl`.ED. PUBLIC WORKS PIPE ■EDDDNG DCPA?TMGVT FOR SANITARY SEWERS SM. PLAIN - 405 \LARCH 20nF PROPERTY LINE z 3'- 0" c FUTURE 6" BUILDING SEWER PIPE n BUILDING SEWER 0- - - w z 6"X5'X6` WYE 2"x 4" STUD MARKING POST PAINTED TEL NTH 6" SDE OUTLET J SURFACE CLEANOUr WITH WHITE WITH THE WORD 'SEWER STENCIED CAST IRON RING & COVER IN 3" HIGH BLACK LETTERS AND #6 WIRE w (SEE STD. DRW 403.1) WRAPPED AROUND THE STUD AND as s a EXTENDED Tn THE TOP of THE STUD. 6" SIDE SEWER AND BUILDING SEWER ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO MAIN LINES ARE AS FOLLOWS: A. VITRIFIED CLAY MAIN - CUT M A NEW TEE USING FLEXIBLE COUPLJNGS (FERNCO OR APPROVED EQUAL)- B_ CONCRETE MAIN - CORE -DRILLED WITH A ROMAC SADDLE (0R APPROVED EQUAL). C_ PVC MAIN - CORE-DRILLE❑ WITH A ROMAC SADDLE (OR APPROVED EQUAL) OR CUT IN A NEW TEE USING R1191) CODLINGS D- DUCTILE IRON MAIN - CORE -DRILLED WITH A ROMAC SADDLE (DR APPROVED EQUAL) E. MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK -OUTS OR THE STRUCTURE MALL BE CORE -DRILLED. 60" ALLOWABLE MAX. FOR CAST IRON PIPE OR DUCTILE IRON PIPE. 1.3:5 MIX bP \1 CONCRETE S BLOCKING 6" SIDE OUTLET TEE / SEWER LSE G" MIN. MAIN CONCRETE BLOCKING ANGLE OF TEE AT MAIN OVER 25 ELEVATION NOTE: UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 2.5' COVER AT PROPERTY UNE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER. %� cj\yt 6 0\yG C� 2% LAIN SLOPE F HORIZONTAL R MAIN TYPICAL SIDE SEWER ELEVATION PUBLIC WORKS STANDARD SIDE SEVMR PIW - 411*4 DEPARTMENT1 NSTALLA`nON (SEWER MAIN TO PROPERTY LINE) MARCH 2O10 OF R/W SURFACE CLEANOUT WITH CAST IRON RING AND COVER (SEE STD. DWG 403.1) ---------------`TJTI WATERTIGHT PLUG L_--J �- EXISTING 6" SEWER STUB BEND AS {REMOVE TO R/W) REQUIRED ,-E%ISTINC SANITARY SEWER MAIN 1 - -` -- 1 _ - - - . - P - ^ 6'K6'X6" WYE j 6•"x 4 • REDUCER BEND AS REQUIRED EXISTING 4" SIDE SEWER (NOT TO EXCEED as'} \PROPOSED 6" SEWER S'U9 SEWER MAN SIZE X 6" TEE ` PROPOSED SEWER NAM NOT TO SCALL PUBLIC WORKS TYPICAL SIDE SEINER CONNECTIONI .' DEPARTMENT FOR SEWER MAIN REPLACEMENT 1 MARCH 2010 SANITARY SEWER NOTES AND SPECIFICATIONS 1. ALL WORK AND WORK MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 2. THE HOURS OF WORK IN THE STREET RIGHT OF WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT. AN APPROVED TRAFFIC CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN PUBLIC RIGHT OF WAY. 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 4. A PRE -CONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 7, PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 10. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 11. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS INSPECTOR. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 12, DATUM SHALL BE CITY OF RENTON, 1988 NAVD. 13. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 14. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON IN THE RENTON STANDARD PLANS & SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 15. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE WASTEWATER UTILITY. 16. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCHES AND MAXIMUM 12 INCHES ABOVE FINISHED GRADE OR MUST HAVE MINIMUM 2' DIAMETER CONCRETE RING POURED AT GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 0 FIRST SUBMITTAL ESM 10/15/200 SURVEYED: SCALE VERTICAL, NAVD 1986 1 SECOND SUBMITTAL ESM 1/31/2 DESIGNED: wS HORIZONTAL: NAD 1983/I991 2 THIRD SUBMITTAL ESM 10/22/201�' '__ DRAWN: /� 3 FOURTH SUBMITTAL ESM 12/06/201 CLc ONE INCH DATUM 4 MYLARS ESM 12/22/201 CHECKED: AT FULL SCALE IF NOT ONE INCH APPROVED: SCALE ACCORDINGLY REVISION BY DATE AP P R S=345007 DATE: - CITY OF GLADCO DEVELOPMENT, L.L.C. FIELDBOOK: RENTON ROSEWOOD HIGHLANDS PAGE: DRAWING NO - Plan n ing/Bu lld ing/Publ 1c Works Dept. SEWER DETAILS AND NOTES DT-05 SHEET: OF. 27 31 VISI0r14S RIPTION DATE BY SUBMITTALESM /2D07D SUBMITTALESM r /2008 SUBMITTALESM /2010H SUBMITTAL /2010 ESM 4 LS 12/22/2010 ESM z 0 C9 z c/) 0 U J Z cn W Z 0 m w Z Q O = c, i J W Q W O ° Ir W O 0 3 ,W^ V v , ° w J� cl) r v 0z z z W r- O U tom aom<v J I I J � rnm y v vm O t � V) o U W ® = roc Z w O J Z _- Lu W OD0 Q OD Y Z ma Q o0 • c co-:5 z� J ccO c� IV Q cnn .. cl) 0 r It - ° Z a` CO.- .- N O �� U - U m LL D 3 ` L 3 �Y 3 cO va; c W� .O o D_ Ls ,. 422 c�.110 S�aMAL JOB NO.: 1352-001-006 DWG, NAME: DT-05 DESIGNED BY: KAO DRAWN BY: CLC CHECKED BY: DATE: 12/22/2010 DATE OF PRINT: DT-05 27 OF 31 SHEETS C) Dn tz o � ' z d � w a