Erosion Control Notes
THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE
WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC
WORKS DESIGN ENGINEER.
2. All limits of clearing and areas of vegetation preservation as prescribed on the
plan(s) shall be clearly flagged in the field and observed during construction.
3. All required sedimentation/erosion control facilities must be constructed and in
operation prior to land clearing and/or construction to ensure that sediment laden
water does not enter the natural drainage system. All erosion and sediment
facilities shall be maintained in a satisfactory condition until such time that clearing
and/or construction is complete and potential for on -site erosion has passed. The
implementation, maintenance, replacement and additions to erosion/sedimentation
control systems shall be the responsibility of the permitee.
4. The erosion and sedimentation control systems depicted on this drawing are
intended to be minimum requirements to meet anticipated site conditions. As
construction progresses and unexpected or seasonal conditions dictate, the permitee
shall anticipate that more erosion and sedimentation control facilities will be
necessary to ensure complete siltation control on the proposed site. During the
course of construction, it shall be the obligation and responsibility of the permitee
to address any new conditions that may be created by the activities and to provide
additional facilities, over and above minimum requirements, as may be needed, to
protect adjacent properties and water quality of the receiving drainage system.
5. Approval of this plan is for erosion/sedimentation control only. It does not
constitute an approval of storm drainage design, size nor location of pipes,
restrictors, channels, or retention facilities.
6. During the time period of October 1st through April 30th, all project distributed
soil areas greater than 5,000 square feet, that are to be left un-worked for more
than 12 hours, shall be covered by mulch, sodding or plastic covering.
7. In any area which has been stripped of vegetation and where no further work is
anticipated for a period 30 days or more, all disturbed areas must be immediately
stabilized with mulching, grass planting or other approved erosion control treatment
applicable to the time of year. Grass seeding alone will be acceptable only during
the months of April through September, inclusive. Seeding may proceed, however,
whenever it is in the interest of the permitee, but must be augmented with
mulching, netting or other treatment approved by the City of Renton, outside the
specified time period.
8. For all erosion/sedimentation control ponds where the dead storage depth
exceeds 6 inches, a fence is required with a minimum height of three (3) feet, 3:1
side slopes.
9. A temporary gravel construction entrance, 24 feet x 50 feet x 8 inches of 4 to
6 inch quarry spalls shall be located at all points of vehicular ingress and egress to
the construction site.
Utility Specifications
NOTE:
BOUNDARY AND TOPOGRAPHY ARE BASED ON
MAPPING PROVIDED TO E3RA BY GEODATUM INC.
AND OBSERVATIONS MADE IN THE FIELD. THE
INFORMATION SHOWN DOES NOT CONSTITUTE A FIELD
SURVEY BY E3RA.
PLACE CATCH BASIN PROTECTION AT CORNER OF SHATTUCK AND
HOUSER WAY S AS WELL AS SHATTUCK AND S 6TH ST.
SEE DETAIL SHEET 5
Call 2 Working Days Before You Dig
1- 800- 424- 5555
Utilities Underground Location Center
NOTE: THERE ARE NO TREES ON THIS SITE TO RETAIN.
THERE IS ONE LARGE RHODODENDRON WHICH IS CLASSIFIED AS A SHRUB.
ALL EXISTING VEGITATION SHALL BE REMOVED.
NOTE: STOCKPILE AREAS TO BE USED FOR TOPSOIL, APPROXIMATELY 110 CUBIC YRDS
AND ANY SOIL STOCKPILING NEEDED TO PLACE FOUNDATION, APPROXIMATELY 225 CUBIC YRDS.
TOPSOIL SHALL BE USED FOR LANDSCAPING WHERE PRACTICAL.
N❑TEi
SEE SHEET S-1 SURVEY BY GE❑DATUM INC. FOR VERTICAL AND H❑RIZ❑NTAL CONTROLS,
DIRECT C❑NSTRUCTI❑N RUN—OFF TO SEDIMENT TRAP.
c�
A
16, F7-1
U , %_�.
�� o
�o
a
F- a
A
i
0
i
..
Q
X
Q
C
� ,
CL
N,
I
0
„
z�
I
I
I,E 26,5-
i
i
FV_ I
;LT
'
ND !
1/2" ASS DISC
'N/PUNCH IN 3"x3"iCONC
POST IN ASE
i
I �
I
I
—PLACE CATCH BASIN PR❑TECTI❑N
0
D
Cn
) I
) > C X D I m Z C m 1 Ll 2.
J
o
o&_
o
o u
n o n
y
S 88d46'16" E
119.88'
CT1 'T' rrK1rC'
Y`1 r—AMTV1dO`a^1 T\1TTf^
PLACE CATCH BASIN PR❑TECTI❑N
NOTE: THIS SET OF PLANS SUPERSEDES ALL PREVIOUS PLAN SETS
No, Date Revision
1 5/5/08 RESPONSE TO CITY COMMENTS
Cn14
00WU
0
~ N
cn -
X
W
❑CKPILE AREA M
0
W
— — O
F0m
-PIRoF SITE ADDRESS
530 SHATTUCK AVE S
RENT❑N, WA 98057
pp+.i
CHECKED FOR COMPLIANCE
°®'` TO CITY STANDARDS
Robert C. Elslip
®k � No.2330
— �
_ �F S
;���,.. Date O
---_-- - Date q�-=L
SW 1/4, SE 1/4, SEC 18, TWN 23N, RGE 5E, W.M, Date
PROJECT: Renton Triplexes
BY E3RA Inc.�°� C' �� Renton, WA
CRL ',� SHEET TITLE: Temporary Erosion and Sediment
9802 29th Ave. W. � � p y
Control Plan and Notes
SUlte B102
Everett, WA 98204
425-356-3372
425-356-3374 fax
WWW.e3ra.com
.�
ry - "�
d,
EXPIRES 12/5/19J
DESIGNER: CRL
JOB NO: T07250
DRAWN BY: CRL
SCALE: 1" = 10'
CHECKED BY: RCE
SHEET: 3
DATE: 5/5/08
FILE: phrent.dwg
03
=2