HomeMy WebLinkAboutWTR2703488.6EXISTING CITY WIFI ANTENNA
AND RADIO'S
EXISTING CITY WIFI ANTENNA
AND RADIO'S
EXISTING SCHOOL SYSTEM
ANTENNA
i EXISTING WASTEWATER
TELEMETRY SYSTEM ANTENNA
EXISTING WASTEWATER
TELEMETRY SYSTEM ANTENNA
EXISTING BRACKETS,
DO NOT DISTURB
EXISTING CLEARWIRE
ANTENNA, TYPICAL.
EXISTING EPDXY SUPPORTS SPACED APPROX 3
FT O.C. VERTICALLY ON SHELL EXTERIOR. TO
BE REMOVED (APPROX 32). REPLACE WITH
NEW BRACKETS SPACED TO MATCH EXISTING
ADJACENT SUPPORTS. EXTEND UP TO SPIRAL
STAIRCASE. SEE DETAIL 1
04
12- INLET/OUTLET 12" INLET/OUTLET
NOTE: ALL INTERIOR
' APPURTENANCES SHALL BE
COATED PER SPECIFICATIONS
UNLESS NOTED OTHERWISE.
OU TLI
HATCH
INTERIOR CAGED LADDER, TYP
FULL HEIGHT OF RESERVOIR,
BROKEN INTO 4 SECTIONS.
INTERIOR LANDING PLATFORM,
TYP OF 3 TOTAL
12" PVC OVERFLOW PIPE WITH
SUPPORT BRACKETS. DO NOT
COAT PVC PIPE.
RESERVOIR INTERIOR PLAN
Y4 = 1'-0"
L
/_ RESERVOIR SHELL
C3x5x0'-2" ® 4'-0" O.C. (TYF
COAT PER SPECIFICATIONS.
REPLACEMENT BRACKETS �:,�
NOT TO SCALE 4.
LAP JOINTS AT ROOF -KNUCKLE
TRANSITION. REMOVE EXISTING
CAULKING, BLAST VOID, COAT
PER SPECIFICATIONS AND
REPLACE CAULK.
,L,
EXISTING WATER TELEMETRY
SYSTEM ANTENNA. REMOVE
AND RETURN TO CITY.
EXISTING WATER TELEMETRY
SYSTEM ANTENNA
f
PROPOSED AND EXISTING
ELECTRICAL CONDUIT
BELOW STAIRS TO BE
COATED TO MATCH TANK,
SST HANDRAIL AND TYP. REMOVE ANY EXISTING
BALUSTERS, TYP. DO ELECTRICAL TAPE AT
NOT COAT JOINTS AND RESEAL
CONDUIT. SEE
g SPECIFICATIONS FOR
INFORMATION REGARDING
CONDUIT SEALANT..
RESERVOIR ELEVATION
Y. = 1'-0"
REVISED TO CONFORM
TO CONSTRUCTION RECORDS
962V e
0312211
RH2 ENGINEERING INC. DATE
RESERVOIR RECOATING NOTES
GENERAL
1. THE RESERVOIR WILL NOT BE TAKEN OUT OF SERVICE UNTIL AFTER OCTOBER 1ST. ALL
INTERIOR RESERVOIR WORK MUST BEGIN AFTER THIS DATE.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COLLECTION, CONTAINMENT,
TRANSPORTATION, AND DISPOSAL OF ALL WASTE PRODUCTS GENERATED FOR THIS
PROJECT.
3. CLEANING AND DISPOSAL SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL
POLLUTION CONTROL LAWS. PROVIDE ACCEPTABLE CONTAINERS FOR COLLECTION AND
DISPOSAL OF WASTE MATERIALS, DEBRIS, AND RUBBISH.
ACCESS
1. RESERVOIR INTERIOR MAY BE ACCESSED BY (2) 36" DIAM SHELL MANHOLES LOCATED
AS SHOWN ON THE PLAN.
2. RESERVOIR INTERIOR HAS AN EXISTING CONTINUOUS PAINTER'S RAIL LOCATED
APPROXIMATELY 12" BELOW THE ROOF KNUCKLE.
3. RESERVOIR ROOF EXTERIOR HAS EXISTING 2" STD SCAFFOLD COUPLINGS. (10) LOCATED
AT RADIUS 20'-0" AND (4) COUPLINGS AT RADIUS 9'-0".
SURFACE PREPARATION
1. ALL EXISTING EPDXY BONDED MOUNTING BRACKETS ARE TO BE COMPLETELY REMOVED
BY POWER TOOL CLEANING (SSPC-SP3) PRIOR TO COATING.
2. ALL EPDXY SUPPORTS ARE TO BE REPLACED WITH STEEL SUPPORTS, SEAL WELDED TO
THE RESERVOIR SURFACE,
COATING
1. ALL WELDING SHALL BE COMPLETED PRIOR TO COATING RESERVOIR INTERIOR.
2. COATING SHALL BE DONE STRICTLY IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS AND IN A MANNER SATISFACTORY TO THE OWNER.
3. CAREFULLY OBSERVE ALL SAFETY PRECAUTIONS STATED IN THE MANUFACTURER'S
PRINTED INSTRUCTIONS. PROVIDE ADEQUATE VENTILATION AND LIGHTING AT ALL TIMES.
4. BRING ALL MATERIALS TO THE JOB SITE IN THE ORIGINAL SEALED AND LABELED
CONTAINERS OF THE PAINT MANUFACTURER.
5. PROVIDE MATERIAL SAFETY DATA SHEETS FOR ALL MATERIALS TO BE USED.
6. CONTRACTOR SHALL TAKE ANY AND ALL MEASURES NECESSARY TO PREVENT
OVER -SPRAY. SHOULD OVER -SPRAY OCCUR, THE CONTRACTOR IS RESPONSIBLE FOR
ALL COSTS ASSOCIATED WITH ANY DAMAGE THAT OCCURS AS A RESULT OF
OVER -SPRAY.
7. MATERIALS SHALL BE MIXED, THINNED AND APPLIED ACCORDING TO THE
MANUFACTURER'S PRINTED INSTRUCTIONS.
8. THE OWNER SHALL INSPECT AND APPROVE ALL SURFACE PREPARATIONS PRIOR TO
APPLICATION OF ANY COATING. PROVIDE 24-HOUR NOTICE PRIOR TO SURFACE
INSPECTION NEEDS.
9. DO NOT COAT ALUMINUM OR STAINLESS STEEL ITEMS.
10. CONTRACTOR SHALL TEMPORARILY DISCONNECT ANTENNA MASTS AS NECESSARY FOR
COATING OF THE EXISTING RAILINGS.
SEE DIVISION 9 OF THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS
ANTENNA SAFETY AND SCHEDULING GUIDELINES
SCHOOL DISTRICT RADIO SYSTEM ANTENNA
1. THE SCHOOL DISTRICT RADIO SYSTEM OPERATES AT AN EFFECTIVE RADIATED POWER
(ERP) OF 11 WATTS.
2. THE CONTRACTOR SHALL NOT WORK WITHIN 10 FEET OF THE ANTENNA FOR A PERIOD
OF MORE THAN 10 MINUTES UNLESS THE RADIO HAS BEEN SHUTDOWN,
3. WHILE SCHOOL IS IN SESSION, THE RADIO SYSTEM CAN BE SHUTDOWN ON SATURDAY'S
BETWEEN THE HOURS OF 8:00 A.M. AND 4:00 P.M.
4. THE RADIO SYSTEM CAN BE SHUTDOWN THE SECOND AND THIRD WEEK'S OF AUGUST
FOR PAINTING OF THE RESERVOIR EXTERIOR.
5. THE CONTRACTOR SHALL NOTIFY THE CITY 7 CALENDAR DAYS IN ADVANCE OF A
SCHEDULED RADIO SYSTEM SHUTDOWN.
CLEARWIRE RADIO SYSTEM ANTENNA'S
1. THE CONTRACTOR SHALL NOT WORK AROUND THE CLEARWIRE EQUIPMENT WHILE THE
EQUIPMENT IS OPERATIONAL.
2. CLEARWIRE US LLC (CLEARWIRE) WILL EITHER RELOCATE THEIR MICROWAVE DISH AND
PANEL ANTENNAS TO A TEMPORARY TOWER OR WILL PROVIDE A TECHNICIAN TO TURN
OFF THEIR ANTENNAS AS THE CONTRACTOR PERFORMS WORK IN THE VICINITY OF THEIR
ANTENNAS.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY CLEARWIRE WHEN THE
CONTRACTORS CREW IS SCHEDULED TO WORK IN THE VICINITY OF CLEARWIRE'S
MICROWAVE DISH OR PANEL ANTENNAS. THE CONTRACTOR SHALL NOTIFY CLEARWIRE
AND THE CITY OF A SHUTDOWN REQUEST 7 CALENDAR DAYS IN ADVANCE OF THE
SCHEDULED SHUTDOWN. THE CITY WILL PROVIDE THE CONTRACTOR WITH CONTACT
INFORMATION FOR CLEARWIRE.
CITY WIFI RADIO SYSTEM ANTENNA'S
1. THE CITY WIFI RADIO SYSTEM OPERATES IN THE 2.4 GHz RANGE AT AN ERP OF 4
WATTS.
2. THE CONTRACTOR SHALL NOT WORK WITHIN 5 FEET OF THE ANTENNA'S OR RADIO'S
UNLESS THE RADIO'S HAVE BEEN SHUTDOWN.
3. THE CONTRACTOR SHALL NOT COME INTO CONTACT WITH THE ANTENNA'S OR RADIO'S
UNLESS THE RADIO'S HAVE BEEN SHUTDOWN.
4. THE CONTRACTOR SHALL NOTIFY THE CITY OF A SHUTDOWN REQUEST 7 CALENDAR
DAYS IN ADVANCE OF THE SCHEDULED SHUTDOWN FOR WORKING AROUND THE WIFI
EQUIPMENT.
CITY WASTEWATER SYSTEM ANTENNA'S
1. THE CONTRACTOR SHALL NOTIFY THE CITY OF A SHUTDOWN REQUEST 7 CALENDAR
DAYS IN ADVANCE OF THE SCHEDULED SHUTDOWN.
2. WHEN RELOCATING THE SEWER REPEATER EQUIPMENT AT THE BASE OF THE RESERVOIR
FROM ELECTRICAL EQUIPMENT CABINET, "EC1", TO ELECTRICAL EQUIPMENT CABINET,
"EC2", THE RADIO EQUIPMENT SHALL BE SHUTDOWN FOR A MAXIMUM PERIOD OF 8
HOURS. ALL EQUIPMENT AND CABLES SHALL BE RELOCATED AND OPERATIONAL WITHIN
THE 8 HOUR PERIOD.
CITY WATER SYSTEM ANTENNA'S
1. THE CONTRACTOR SHALL NOTIFY THE CITY OF A SHUTDOWN REQUEST 7 CALENDAR
DAYS IN ADVANCE OF THE SCHEDULED SHUTDOWN.
2. WHEN DISCONNECTING THE ANTENNA CABLES FOR INSTALLING THE EXISTING CABLES IN
CONDUIT, THE RADIO EQUIPMENT SHALL BE SHUTDOWN FOR A MAXIMUM PERIOD OF 2
HOURS. ALL CABLES AND EQUIPMENT SHALL BE RECONNECTED AND OPERATIONAL WITHIN
THE 2 HOUR PERIOD.
W=348806
REVISED TO CONFORM TO CONSTRUCTION RECORDS
NO- REVISION
Q:
167 7 jam.
�
t� 18 Ts4s° :�
ti
SIGNED. 04 /23110
SIGNED. 04 123 40
4t�
O
OVA
J
Q
W
0
0
Z
Q
O
V
O
W
cn
W
M
E R S
kHz
http: /www.rh2.com
mailbox@rh2.com 1.800.720 �1' `'
BELLINGHAM 360,6'=
454 West "prton Poo
SC THELL 425.951.54M
12100 NE 195th Street, Suite 100
EAST
WENATCHEE.
300 Simon, Street, Suite 5
RICHLAND
114 Columbia F
4;11 VFPnAt_F 'cwn
SCALE: SHOWN
DRAWING IS NOT TO SCALL
IF BAR IS NOT 2" LONG
PLOT: 48
nwc .
SO4
ENCINEER JMC
REVIEWED MLM
DATE MAR 22, 2011
SHcc .
®�
CLIENT: REN
MWB
CMR
03/22/11
Boa NC 109-062
09
BY
REVIEW
DATE
FILENAME WHR-D-STR011