HomeMy WebLinkAboutWTR2703526.5PART TWO - MATERIALS NOTE: "Developer" in these specifications shall also signify "Contractor" for the purpose of District Financed Projects. 2-1 GENERAL All materials and equipment shall be new and undamaged. Where possible, the same manufacturer of each item shall be used throughout the job. 2-2 MATERIAL LISTS AND SPECIFICATIONS The Developer or his Contractor shall deliver to the Engineer a material list not less than ten (10) days before commencement of construction. The list shall contain the manufacturer and model number, if applicable, of the material and equipment to be installed as a part of the work so that the Engineer may determine whether such materials conform to the Plans and Specifications. Materials that are not included in the material list shall not be installed as a part of the work. The manufacturer's technical specifications for pipe, appurtenances and equipment to be incorporated into the work shall be submitted to the Engineer at least ten (10) days before commencement of construction with the materials listed. 2-3 GUARANTEE BY MANUFACTURER If requested by the District or the Engineer, a written guarantee made by the manufacturer of any materials to be incorporated into the work shall be furnished, guaranteeing to the District that such materials shall conform to these Specifications and any specifications otherwise applying to the work. 2-4 DUCTILE IRON PIPE AND FITTINGS i (a) Ductile iron pipe shall conform to AWWA Standard C-151. Pipe shall be thickness class 52 or as indicated on the Drawings. Pipe and fittings shall have cement mortar lining conforming to AWWA Standard C-104. Joints shall be mechanical joint or push -on joint and shall conform to AWWA Standard C-111. (b) Cast iron fittings shall conform to AWWA Standard C-110 or C-153. Mechanical or push -on joints shall conform to AWWA Standard C-111. Flanged joints shall conform to ASA Standard B-16.1, class 126. Flange gaskets shall be ring type, cloth insert rubber, 1/16-inch thick, equal to Rainbow or Durable Garlock. 2-5 COPPER PIPE AND FITTINGS (a) Copper pipe shall conform to AM B 88, type K, annealed. (b) Fittings shall be brass conforming to AM B 62 for compression style 1 connections. See Standard Details. 2-6 VALVES (a) Gate valves shall be resilient seated, non -rising stem, conforming to AWWA Standard C-515. Valves to have S.S. nuts and bolts. Valves shall be open by turning counterclockwise. Joints shall be as indicated on the Plans. (b) Butterfly valves shall conform to AWWA Standard C-504 as supplemented herein. Valves shall be Class 150B with flanged, mechanical joint, or flanged x M.J. end connections. Valves in chambers shall be handwheel operated with integral position indicators. Buried valves shall have a stem extension with AWWA 2-inch operating nut and suitable valve box. Buried valves 14 inches or larger and other valves that may be designated "critical" shall be provided with a ground level position indicator and valve box adaptor. Rubber seats may be either body or disc -mounted. Valves using hardware to retain the seat shall positively secure all internal fastners with lockwires or equivalent means. Manual operators shall be certified to withstand an input torque of 450 foot- pounds extreme position of travel. This torque shall be absorbed b o ds in either xtr on P un P q Y individually adjustable travel stop mechanisms using the operator housing to limit travel. All valve operating nuts shall be brought to within three (3) feet of the finished grade. 2-7 FIRE HYDRANTS Hydrants shall have a 5-1/4-inch main valve opening (MVO), 6-inch MJ connections, two 2-1/2-inch hose connections, ASA (National) standard thread and a 4-inch pumper connection with City of Seattle standard threads 4-875. They shall have 36 inches of ground cover unless otherwise required, and be flanged at the ground line. Hydrants shall be constructed that the direction of the pumper connection may be rotated to face the roadway. Hydrant shackles and straps shall be as shown on the Standard Details. Hydrants shall be F." Watermaster 5CD250 W/ Dust cap, Mueller, M & H, or Waterous Pacer model WB-67-250. See Standard Details. 2-8 VALVE BOXES Valve boxes shall be cast iron, two-piece, suitable for installation required, equal to Rich Co, style 045 with drop in handle or approved equal. Locking lids of approved design shall be used where designated on plans. C� 2-9 CORPORATION STOP, SERVICE CLAMP, CURB STOP 0 w See Service Connections in Standard Details. O z 2-10 TWO-INCH BLOW OFF 0 U See Standard Details. U 0 o 00 o m V 1 F- o0 w o = 00 0 j� x 0 U00-2 Q o -z� 00,NN_� ��V)0 pcoO0Q00000 \P a- 0 Qo �w� DESIGNED PZ WWW:2W <F_F_zJ aDRAWN JMU E=-� z w> o w w CHECKED DBH -Ja_.,cncy- Ecna-Dx SYM REVISION 2-11 PRESSURE REDUCING STATION See Construction Drawings and Detail Sheet. 2-12 AIR AND VACUUM RELEASE VALVES See Standard Details. 2-13 DETECTOR CHECK VALVE Detector check valves shall be U.L. approved, FEBCO Model 806 DDC or equal. See Standard Details. 2-14 HYDRANT GUARD POSTS Guard posts shall be precast concrete nine inches (9") in diameter by six feet (6') long constructed with concrete having minimum strength of 3,500 psi. Reinforcing shall consist of a minimum of four (4) #3 deformed steel bars. See Standard Detail #4 for placement. 2-15 VALVE MARKER POSTS Valve marker posts shall be equal to Fog-Tite Meter Seal Company product 4" x 4" - 42" long. See Standard Details. 2-16 CONCRETE BEDDING AND BLOCKING Bedding and blocking concrete shall be Portland cement concrete containing four sacks of cement per cubic yard and a maximum aggregate size of 1-1/2 inches. Maximum slump shall be 3-1/2 inches. 2-17 BOLTS IN PIPING Bolts shall be carbon steel, zinc or chromium plated, brass or stainless steel. 2-16 BEDDING MATERIALS Bedding material shall be well -graded, clean, granular sand and shall meet the following requirements: U.S. Standard Passing Sieve Size By height Sand: 3/8" square opening 100 1/4" square opening 90-100 110 sieve 40-75 #40 sieve 15-40 1200 sieve 0-15 2-19 TRENCH FOUNDATION MATERIAL Over -excavated material shall be replaced with trench foundation material conforming to one of the following gradations as specified: U.S. Standard Class "A" Class "B" Sieve Size Min. Max. Min. Max. 2-1/2" square opening 98% 100% 95% 100% 2" square opening 92 100 75 100 1-1/2" square opening 72 87 30 60 1-1/4" square opening 58 75 0 15 3/4" square opening 27 47 0 1 3/8" square opening 3 14 0 0 No. 4 sieve 0 1 0 0 2-20 ASPHALTIC CONCRETE Asphalt concrete pavement shall conform to the technical requirements for �P q Class B Asphalt in the latest edition of the State of Washington Standard Specifications for Road, Bridge and Municipal Construction. 2-21 TOP COURSE AND KEYSTONE MATERIAL For use in restoration of excavated areas, Top Course and Keystone material shall be manufactured from ledge or talus rock, be free from wood, roots, bark and other extraneous material and shall conform to the following requirements. U.S. Standard 7 Passing Sieve Size By Weight 5/8" square opening 100 1/4" square opening 55-75 U.S. No. 40 sieve B-24 U.S. No. 200 sieve 10 Max. Sand Equivalent 40 Min. 2-22 BASE COURSE MATERIAL Base course material shall conform to the following requirements: U.S. Standard % Passing Sieve Size By Weight 1-1/2" square opening 100 5/8" square opening 50-80 1/4" square opening 30-50 U.S. No. 40 sieve 3-18 U.S. No. 200 sieve 7.5 Max. Sand Equivalent 40 Min. rPii6E DATE BY APP'D An Engineering Services Company 2-23 IMPORTED BACKFILL MATERIAL Imported backfill material shall be free from wood, bark, roots or other extraneous material and shall meet the following requirements: U.S. Standard % Passing Sieve Size By Weight 2-1/2' Square Opening 100 1/4 Sieve 25 Min. No. 200 10 Max. Sand Equivalent 35 Min. PEA GRAVEL WILL NOT BE ALLOWED AS BACKFILL MATERIAL. PART THREE - CONSTRUCTION 3-1 GENERAL Except as otherwise noted herein, all work shall be accomplished as recommended in the latest revision of AWWA and APWA Specifications and according to the recommendations of the manufacturer of the material and equipment concerned. In roadway areas, all asphalt and concrete pavement shall be saw cut and vacuumed. When trenching operations cut through concrete pavement, the pavement shall be removed to a width of 18 inches greater than the top width of the trench. The concrete shall be saw cut on a straight line and shall be beveled so that the cut will be approximately 1 inch wider at the top than at the bottom. Asphalt paving shall be saw cut ahead of the backhoe to prevent excessive tearing up of the surfacing and to eliminate ragged edges. 3-2 ALIGNMENT Pipe shall be laid to the specified grade and alignment as staked in the field. Alignment deviation shall not exceed 0.5 feet. Replacement of stakes lost or destroyed shall be made at the Developer's expense and in accordance with Contract Plans, including modifications called for by the District. 3-3 TRENCH Trenches shall be excavated to the line and grade designated by the District. Except for unusual circumstances where approved by the District, the trench sides shall be excavated vertical and the trench shall be excavated to only such widths as are necessary for adequate working space. The maximum trench width at the top of the pipe shall normally be the outside diameter of the pipe barrel plus 16 inches. The trench shall be kept free from water until joining material has set. Surface water shall be diverted so as to not enter the trench. The Developer shall maintain sufficient pumping equipment on the job to insure that these provisions are carried out. Boulders, rocks, roots and other obstructions shall be entirely removed or cut out to the width of the trench and to a depth of 6 inches below water main grade. Where material is removed form below a water main grade, the trench shall be backfilled to grade with material satisfactory to the District and thoroughly compacted. Trenching operations shall not proceed until pipe laying is ready to commence and not more than 300 feet of trench shall be opened in advance of pipe laying operations without written approval of the District. All work on Countv right-of-wav shall be backfilled in its entirety each day. The depth of trenching for water mains shall be such as to give a minimum cover of 36 inches over the top of the pipe unless otherwise specified. Pipe cover shall be increased as required to provide minimum 6-inch clearance when crossing culverts or existing utilities, and due to localized breaks in grade. Where the profile of the pipeline and ground surface is shown on the Plans, the pipeline shall be laid to the elevation shown, regardless of depth. Excavation shall be to such depth that the minimum cover over the valve nuts shall be one foot. No valve shall be located in such a position as to be in any roadside ditch, drainage ditch or channel. 3-4 TRENCH FOUNDATION If, in the judgement of the District, the native trench bottoms will provide a firm base for the subsequent placement of bedding, pipe and backfill, such native trench bottom may be used if the bottom is leveled and smoothed so that the entire length of pipe will rest on a well -compacted base. Trench bottoms shall be over -excavated M *quick" „ as necessaryto remove all unstable soil and eliminate 'boiling" or uick Conditions g q in to such a depth as to provide a firm base. Over -excavated materials shall be replaced with trench foundation material as specified in Section 2-19. Foundation material shall be placed when ordered by the District. 3-5 TIMBERING AND SHEETING The Developer shall provide and install timbering and sheeting as necessary to protect workers, the work, existing buildings, utilities and other properties, and shall meet all OSHA and WISHA requirements. 3-6 DUCTILE IRON Pipe laying shall in general conform to AWWA Standard C-600 and the manufacturer's recommendations unless specifically contradicted by these Specifications. Special care shall be taken in handling pipe to avoid damaging ends, coatings and linings. Pipe shall be carried in slings and shall not be rolled or dragged. The pipe shall be cleaned of all foreign material and examined for defects before lowering into the trench. Whenever the pipe laying is not in process, the last section of pipe shall be tightly capped or plugged. No pipe cutting will be allowed except by means of a cutter or other device approved by the District. The trench shall be overexcavated 4 inches and a sand bedding shall be placed and compacted under and around to the spring line of the pipe. After approval by the District, the backfilling shall then be completed in conformance with the section on backfilling of this Specification. All pipe installed at slopes 15% or greater shall incorporate "Field Lok gaskets and/or mechanical restrained joint glands. 3-7 BEDDING MATERIAL PLACEMENT All rigid pipe shall be placed in bedding material of the type specified in Section 2-18. The bedding shall be placed from a minimum of four (4) inches below the pipe barrel to the spring line of the pipe as shown on the Standard Details. Bedding material shall be worked and compacted by hand under, around and over the pipe to the depths required for the full width of the trench. Bedding shall be placed in more than one lift. The first lift, to provide at least 4-inch thickness under any portion of the pipe, shall be placed before the pipe is installed and shall be spread smoothly so that the pipe is uniformly supported along the barrel. Subsequent lifts of not more than 6-inch thickness shall be placed as shown on the Standard Details and individually compacted to minimum 90 percent of maximum density. 11255 Kirkland Way, Suite 300 Kirkland, WA 98033 p. 425.827.2014 1 f. 425.827.5043 ........... ...................... I .................... Civil I Structural ( Planning I Survey Daceengrs.com 3-8 BACKFILLING 3-16 CONCRETE BLOCKING 3-22 CONNECTION TO EXISTING PIPE LINES No backfilling shall be performed until after the District has inspected the installation of the pipe and bedding and approved backfilling. Concrete blocking shall be cast from 1:3:6 mix with a slump of not more than six inches (6"). Concrete blocking shall be cast -in -place, (not mixed in trench) No connections shall be made to the existing system until all hydrostatic and and have a minimum of 1/4 square foot bearing against the fitting and bearing purity tests have been satisfactorily completed for the new sections of pipe. The initial backfill shall be hand placed select material spread evenly over the area against undisturbed soil as shown in the Standard Details. Additional bearing The two systems shall be completely isolated up to this point, bedding material and compacted by hand up to an elevation of 12 inches area may be required by the District. Blocking shall bear against fittings only Where cut -ins are to be made in existingpipes, the work shall be conducted P above the top of the pipe. This shall be done in such a manner that subsequent and shall be clear of joints to permit taking up or dismantling joints. AllP backfilling will not disturb the pipe in any way. Subsequent lifts of not hydrants, bends, tees, and valves shall be blocked. The Developer shall at such a time and in such a manner as to minimize the interruption more than 12-inch thickness shall be placed as shown on the Standard Details install blocking that is adequate to withstand full test pressure as well as service. Necessary pipe, fittings and gate valves shall be assembled at the site and individually compacted to minimum 90 percent maximum density. operating pressures under all conditions of service. Vertical blocking, when ready for installation prior to shutting off water in the existing main. Once Subsequent backfilling shall be performed by pushing material from the end required, shall conform to that shown in the Standard Details. the water has been cut off, the work shall be prosecuted vigorously and shall of the trench along and directly over the pipe so that the material will be not be halted until the line is restored to service. All fittings required for the applied in the form of rolling slope, rather than by side filling. Backfilling 3-17 AIR AND VACUUM RELEASE VALVE INSTALLATION connection shall be thoroughly swabbed with chlorine solution prior to connection from the sides of the trench will not be done until the District has determined Unless specifically provided for elsewhere in these Specifications, the Developer that material has been carefully placed over the pipe to a sufficient depth. See Plans. Location of the air release valves as shown on the Plans is shall have the responsibility of giving at least 24 hours notice to the District of approximate. The installation shall be set at the high point of the line. intention to disrupt service and shall give at least 24 hours notice to the affected In areas such as existing paving, or in areas to be paved or shoulder areas, water users. where the District determines minor settlement would be detrimental and the 3-18 native excavated material is not suitable for compaction as backfill, the trench HYDROSTATIC PRESSURE TEST Developer shall not operate any valves, including fire hydrant valves, in any ' shall be backfilled with imported backfill material as specified in Section 2-23. The hydrostatic pressure test shall be performed after the water system to be art of the existing waters stem. except in the presence of the Dist t R y D p �� Developer shall notify the District 24 hours in advance of the need to operate t tested is initially filled, but before bacteriological sampling is conducted. valves. 3-9 COMPACTION OF BACKFILL Filling of mains from existing facilities shall be through an approved Reduced Pressure Backflow Device (RPBD) or Double Check Valve Assembly (DCVA). 3-23 WET TAPS Compaction of backfill and backfill procedures in public rights -of -way shall, at the minimum, conform to the requirements of the governmental agency Hydrostatic pressure tests shall be performed on all valved sections. The test The material requirements for wet or "hot" taps of existing pipe lines shall be having jurisdiction thereof. shall be made at the low point of the section. Only District personnel shall as follows: operate valves. At no time shall the Developers personnel operate valves Backfilling shall be compacted to 95 percent of maximum theoretical density, during the testing_ procedures. TAPPING GATE VALVES from the pipe crown to the surface, in all areas where paving will be placed over the backfill and in shoulder areas and to 90 percent of maximum The Developer shall provide all necessary equipment, including temporary Valves shall be of the resilient -seated variety and shall meet or exceed the theoretical density in all other areas. Measurement of compaction densitj blowoff assemblies and provisions for temporary thrust restraint, and shall requirements of AWWA C509. Valves shall be coated internally and externally shall be by the modified AASHTO method. perform all work connected with the tests. The installation shall be tested with fusion bonded epoxy coating meeting or exceeding AWWA C550. Double Compaction of backfill shall be achieved by power operated tampers, or roller at 250 psi. All mains, valves, hydrants, service fittings, and thrust blocks are to be tested at 250 psi. All service lines shall be tested from the main to the curb metal disc or solid metal wedge valve designs are not acceptable. All valves vibration equipment. Water settling will not be accepted as a means of compaction. stop, in conjunction with the main at the pressure stated above. Containers used shall be new and of current manufacture, and shall display a current casting date. If excavated material has a Calif orniaBearing Ratio for compacted and soaked during testing must be clean of debris and disinfected. A 300 p.s.i. pressure For applications with working pressures exceeding 175 psi, a ductile iron valve sample of less than 7, or for any other reason in the judgement of the District gauge is to be used during test. rated for 250 psi or higher working pressure shall be used, The valve shall be cannot be compacted as specified, such excavated material shall be replaced U.S. Pipe "Metroseal 250 or approved equal. For applications with working with imported backfill material. No backfill shall be placed without immediate For approval, the pressure shall not drop more than 5 psi in 15 minutes. Any pressures below 175 psi, valves of the following manufacture, or an approved compaction according to these specifications. deffective joints, pipe or fittings shall be replaced at the Developers expense equal, are accptable. Clow, M & H, Mueller, U.S. Pipe. and the test repeated until satisfactory. Maximum test L = 1000 Ft. A 300 psi The District will require that the services of an independent testing laboratory or guage shall be used. TAPPING SLEEVES County testing laboratory be employed to perform in -place density tests to ascertain whether the specified density can be or has been obtained, and the cost 3-19 STERILIZATION AND FLUSHING OF WATER MAIN All tapping sleeves shall be rated by their manufacturer for a working pressure thereof shall be borne by the Developer. of at least 200 psi. Acceptable sleeve types are as follows: Sterilization of water lines shall conform to AWWA Standard C-651. Regardless of the approval of the District as to the manner of compaction or Chlorination shall be by chloride -bearing compound placed in each pipe "Mechanical Joint" Style: May be of either ductile or grey iron construction, testing, the Developer shall repair any settlement of trenches and excavations length or capsules secured to the top of the barrel of each pipe length. although ductile iron is preferred. Acceptable for both size -on -size and non that may occur within two years after compaction and formal acceptance of the Chlorine residual shall not be less than 50 parts per million. Sterilization size -on -size applications on cast iron, ductile, iron, and AC mains through 12" work by the District. shall include all pipe mains, all pipe runs to hydrants and all service lines to on 12" only. All mechanical joint sleeves shall be new and of current manufacture, 3-10 POLYETHYLENE ENCASEMENT the curb stop. Contact period shall be for a minimum of 24 hours during which time all valves shall be opened and closed. After the contact period, shall display a current casting date and be manufactured by Clow, Dresser, Mueller, Tyler, U.S. Pipe or approved equal. all mains, services and pipe runs to hydrants shall be thoroughly flushed and Where the District determines that the pipe will be installed in corrosive soils, dechlorinated. A pressure test will be taken; then a water sample taken for "Stainless Steel" Style: The District prefers all stainless construction in this style. the Developer will protect the pipe with a polyethylene encasement as per testing and approval by the Washington State Department of Health. Flushing However, stainless sleeves with ductile iron (but not-mbon steel) flanges are also ANSI/AWWA C105/A 21.5-82. No holes or repairs in the polyethylene encasement water drawn from pipe or hydrant shall pass through an approved RPBD or DCVA. acceptable. These sleeves are acceptable for all applications on ductile iron, cast are allowed. Tapeing is required poly wrap tape. No pressure testing is allowed during contact period. iron and AC mains through 12" on 12" only. Stainless sleeves shall be manufactured 3-11 JACKED OR BORED CROSSING The environment to which the chlorinated water is to be discharged shall be by dCM or Romac or be an approved equal. inspected and if there is any question that the chlorinated discharge will cause The District may at their option make all connections to existing mains and make All work shall be done in accordance with the requirements of the agency in damage to the environment, a reducing agent shall be applied to the water to all crossings of existing roadways at the expense of the Developer. control of the facility being bored or jacked. See highway crossings and to be wasted to neutralize the chlorine residual remaining in the water. Disposal railroad crossings (Section 3-12) for further details. may be made to any available sanitary sewer provided the rate of disposal 3-24 BACKFLOW PREVENTION DEVICES does not overload the sewer and the disposal is approved by the sewer agency 3-12 HIGHWAY CROSSINGS AND RAILROAD CROSSINGS having jurisdiction. 'Where necessary, federal, state and local regulatory Where the possibility of contamination of the water supply exists, the District will agencies should be contacted to determine special provisions for the disposal require certain services be equipped with a backflow prevention device. The only This item applies only to rigid surface pavements. The Developer may use of heavily chlorinated water. acceptable device is that which operates on the reduced pressure principle as any method that provides satisfactory results and is acceptable to the indicated in the latest edition of the DOH approved list. The determination as to governmental agency having control of the road and to the District, provided Water required for flushing and testing due to non -passing purity tests, and the need, size and location of a backflow device shall be determined solely by the that the Developer restores the roadway to its original condition. Normally, to main breaks caused by the Developer, shall be paid for by the Developer District. highway crossings require the placing of a steel casing by jacking or at the existing Water District rates. and laying the water mains within this casing. For steel casing tunneling yi g g mg 3-25 TRAFFIC CONTROL specifications - see Plans. For District Standards for boring or tunneling see 3-20 REPLACING ROAD SURFACING "'later or Sewer Casing Detail" on separate sheet. All traffic control shall be according to the Manual of Uniform Traffic Control The Developer shall restore all roadway and driveway surfaces excavated or Devices and/or the agency with local jurisdiction. During construction, traffic shall 3-13 FIRE HYDRANT INSTALLATION disturbed to a condition acceptable the District and to the government agency not be delayed for more than 5 minutes unless previously approved by the District having control of the road. Before replacing asphalt surfacing, the edges of and the agency of jurisdiction. Hydrant installation shall generally conform to AWWA Standard C-600 and the existing asphalt shall be trimmed, as necessary, to make a smooth joint. the Standard Detail "Fire Hydrant Assembly". The concrete guard posts as 'Where concrete must be broken out prior to trench excavation, the cut in the 3-26 ASBESTOS CEMENT PIPE shown on the Standard Detail Drawing shall be installed where required by concrete shall be made by sawing square and straight with a concrete saw to the District. Shackle rods shall receive two coats of cold tar or asphalt prior a depth of not less than 1 inch. All pipe work and procedures are to be followed as set forth in TAC-296-62-077 to installation. Pumper nozzle shall face the road after installation is completed. thru 296-62-0776, including appendix A thru J. 3-21 SERVICE CONNECTION 3-14 GATE VALVE INSTALLATION 3-27 (a) Ductile Iron Pipe: Connections into ductile iron pipe shall be by NEW WATER SERVICE LINES Before installation, gate valves shall be cleaned of all foreign material as single strap saddles for 1-inch or smaller services and shall be made All new water service lines shall be marked with a 2" x 4" board which is to be earlier specified for installation of pipe. Such blocking as the District may P P P g Y with double strap saddles for 1-1/2-inch and larger. Connections larger than 1-1/2-inch be by the District. All located at meter boa and the toe of which shall be painted white and extended deem necessary shall be provided. The valve and valve box shall be set shall made as required saddles 4 feet above the ground labeled "WATER" in 2" high blue stenciled letters. plumb with the valve box centered on the valve. The top of the valve box shall be epoxy coated and have stainless steel straps. shall be set to the grade indicated by the District. If the valve nut is over 3-28 (b) Service tees, STREAMGUARD CATCH BASIN INSERTS 3 feet deep, operating nut extensions shall be used. saddles, corporation stops, curb stops and reducers shall be as manufactured by Ford or equivalent. All catch basins located along project shall have a streamguard sediment catch Valve markers shall be set where required by the District. The marker shall be (c) Taps to be made using tapping machine. basin insert model 9226 as manufactured by Ultra -Drain Guard, model 3003 as set on a line through the valve at a right angle to the centerline of the road. manufactured by Foss Environmental or approved equal installed. Inserts are to The marker shall be generally set on the property line unless the District decides be cleaned and replaced by Contractor per manufacturer's recommendations or another location is safer or more conspicuous. Operating nut extensions shall be by District direction. used if the nut is over 3 feet deep. 3-15 VALVE BOX INSTALLATION Valve boxes shall be set flush in pavement. If placed in gravel areas, an asphalt pad 2 inches thick and three feet in diameter shall be placed around the box. No valve boxes shall be installed in the curb and gutter areas. DATE OCT. 2008 SMITH AND BUSTAD COAL CREEK UTILITY DISTRICT SCALE WATER EXTENSION N/A I STANDARD NOTES W=352605 JOB NUMBER �/�/ 08018.00 SHEET NAME STD. NOTES SHEET 3 OF 3