Loading...
HomeMy WebLinkAboutSWP2703529.8LLB Q z C) Ld 0 N L0 M N 2i w U) U 2 Ir O U) U) w Q w z Q� U) w Q w Q r �T oM A NII 36016 I 6" �, r/ 1019 39TH AVENUE SE, SUITE 100 PUYALLUP, WASHINGTON 98374 g T.253.604.6600 F.253.604.6799 z www.parametrix.com w RECIlUVENDIT FOR AEPRfl -AI ByI ---------------- Datel BYI---------------- Datei--- — BYI----------------- Date; _------- By,---------------- Datet--- --- NO. PLAN SCALE IN FEET 0 40 80 REVISION I Fr.FNn TEMPORARY FENCING AS DEWATERING SYSTEM IS INSTALLED. TEMPORARY FENCING DURING X CONSTRUCTION PHASE. 3 GENERAL CONSTRUCTION ACCESS LOCATIONS. GENERAL NON -CONSTRUCTION ACCESS LOCATIONS TO BE RESTORED AFTER CASING INSTALLATION. PAVEMENT REMOVAL AND RESTORATION LIMITS. -� TYPE 3 BARRICADE WITH R 1 1 -2 ® 'ROAD CLOSED' (42"x30") SIGN. R11 'WALKER SUBARU ENTRANCE : OPEN' (MINIMUM 30"x30") SIGN. F : PROJECT SIGN PER CITY OF RENTON STANDARD DETAILS. O CONSTRUCTION PHASE. SEE SHEET G4 FOR OVERALL DESCRIPTION OF GENERAL CONSTRUCTION SEQUENCING. D=352908 DATE: SURVEYED: SCALE: =40' VERTICAL: NAVD. 83/1 CITY OF LAKE AVE S / RAINIER AVE S �uNE 20� >> HORIZONTALNAD 1983991 �� DESIGNED: _-._� FIELDBOOK: DRAWN: C. CLARK/J. COOP STORM SYSTEM RENT 0 N PAGE: � DRAWING N0: K. TAYLOR ONE INCH DATUM CHECK : i AT FULL S(- - Planning/Building/Public Works Dept. TEMPORARY PHASING, FENCING, C 4 IF NOT ONE INCH BY DATE APPR APPROVED: SCALE ACCORDINGLY AND TRAFFIC CONTROL PLAN SHEET: OF: 1 1 IDI-131512 900