Loading...
HomeMy WebLinkAboutSWP2703531.13SECTION 32, TWP 24 N, R 5 E, W.M. L1� / / / / / / / / / / / / N 2 2+00 W / / W W CD / �G CONSTRUCTION NOTES: / O CONTRACTOR SHALL SAWCUT EXISTING ASPHALT 3 PAVEMENT AND CONCRETE PANEL, AS REQUIRED. 2 O2 CONTRACTOR SHALL COLD PLANE/GRIND EXISTING 23+00 + PAVEMENT SURFACE, 2" DEPTH. ALL MATERIAL :- ---� 0 SHALL BE REMOVED AND WASTE HAULED BY THE 25+00 CONTRACTOR. CONTRACTOR SHALL FURNISH AND INSTALL HMA OVERLAY. SEE TYPICAL CROSS SECTIONS ON SHEET 16. 40 CONTRACTOR SHALL FURNISH AND INSTALL NEW I _ PAVEMENT SECTION, SEE TYPICAL CROSS SECTIONS ON SHEET 16. 6 50 CONTRACTOR SHALL REPAIR EXISTING CONCRETE 3 PANEL PER STANDARD DETAIL H033 IN THE SPECIFICATIONS. r --- W Z / J 4 / 0 6 / Q / / / C / / J I _ I 01 0 I I O CONTRACTOR SHALL FURNISH AND 'INSTALL GRAVEL SHOULDER, SEE TYPICAL CROSS SECTIONS ON SHEET 16. REMOVE AND WASTEHAUL EXISTING ASPHALT AS REQUIRED. p. & AN1V C of wA g�, `9�- G� of WAS O O C11r x zAi AS -BUILT �p .p 37338 q �v �O �P 38311 q w� �14, �s`SI0NAL �� ��s`Sj0NAL D-353_ 1 1� AS -BUILT SURVEY BY: EVAN M%V- " MD M/1 41R�39"" NI CITY OF 2/14/11 B.P.B. WAHLSTROM, PLS#44651 LAKE WASHINGTON BLVD NORTH Gra 8z bo In+G (INFORMED LAND SURVEY)DMM , R E N TO N STORM WATER & WATER MAIN �: p s �e C.J.K. OW DATUM IMPROVEMENTS 22 C❑NSULTING ENGINEERS THE ORIGINAL PLANS WERE STAMPED 's.A.c. AT Public Works Dept. 701 DEXTER AVENUE NORTH SUITE 200 M NOT °OMM PAVEMENT RESTORATION SHEETS SEATTLE, WASHINGTON 98109 (206) 284-0860 BY SC AND BB ON 2/14/2011 & 2/15/2011 NO. REVISION BY DATE APPR "0°°R°"'�`Y SHOT. of :35.3 / 13