Loading...
HomeMy WebLinkAboutWTR2703531.1SECTION 32. TWP 24 N. R 5 E. W.M. STA 11 +00, 11' L REMOVE EXISTING 12" CAP AND BLOWOFF AND CONNECT TO EXISTING 12" DI WITH 12" SLEEVE, (MJ) AND SPOOLS CONTRACTOR TO POTHOLE FOR POTENTIAL UTILITY CONFLICT5_ ----------- — STA 11+20, 11' L 010 12" 90' BEND, (MJ) N uj ASSUMED LOCATION OF UNDERLYING CONCRETE PANELS. CONTRACTOR TO VERIFY/POTHOLE FOR ANY — — — — — — — — — — — — — — — W CONCRETE PANEL DISTURBANCE PRIOR TO — — — — — — — — — — uj CONSTRUCTION. — _._ — — -- -' — — — U) —,---- 16+' O (;TO[� 'BEND N • _ �. o LAKE WA HI - —` 15+00 I -- + 14+00 _ _ r "OV CO&JG^, 13+00 —---�---- ► 31 LF 12 SLacK �,� SWpcK L•aw. _ W " DI CL 52 57 LF 12" DI CL 5 W STA 11 +20, 12 RT 12" 90- BEND MJ 12+U0 — 197e 12" DICL 52 W _--- W WW /TR —03 W -- ------ W W W WW —._._ .---- W " L 52 --- W �- W 193 LF 1v2 DI C W W _._-- W — — — — — — — — 2' — — STA 15+55 19'RT J W W _-- __.-------- STA 15+24, 13' RT 11 Y4' BEND, MJ = — — — — — — 11 Y4' BEND, MJ W/MEGALUG AND TB V — ------ ------ I.E.=36.31 W/MEGALUG AND TB ° f' --- --- I.E.=40.75 I.E.=35.91 _.__—�--'--"------ _ - R POTHOLE LOCATION -- w -� 2.5" ASPHALT OVER T STALL. G' ROCK WALL NID g nrA. MybaA�- 7.5" CONCRETE A IvAt% L--STA 11 +10,11' L PER STANDARD DETAIL B102 12"X6" TEE (MJxFL) W/TB POLYWRAP 6" STUB. STA 13+10, 12' RT 12"x6" TEE, (MJxFL) W/TB 6" GV, (FLxMJ) 2 1 1 FIRE HYDRANT ASSEMBLY (27' RT), 13 15 12" GV, (MJxMJ) 6" GV, (FLxMJ) 1 1 FIRE HYDRANT ASSEMBLY (221), 13 PER STANDARD DETAIL B102 POLYWRAP 6" STUB. 2-.. 45...BE.N.D; -.6.". .:(MJ)............. ................... .......... .............................. ................................................ .........:................... .. . W/TB 50.... ..... ........................ ....................................... ....................................... .................. .................. * ....... 5 .................. ...... ...................................... ....................................................................................... .......... ... ........................................................ .. .. 40................................................................................. ...... .... .� ..:-..�. .........._.................... 4' MINIMUM COVER ::::::::.......... ...... ....... 193 LF 12" DI CL 52 WATERLINE, WITH : P OLYWRAP : 35 30 25 .......... 11 01 P' B 4k Y �� ti o �p 37338 wW ST�g� J U- x x W >0 O Ld J+ > +� CO (O Q� Qfx NON F-N T_ U) r-- V) Ir— ................ .. : ............... 12+00 13+00 —J W x Z W m o OLjON + iY + + .- O co 2 e F_ F' V) N 0 t) (n r— r�� ANN C V pF WA S� r �p 38311 '�o cy'w STE¢���� AS -BUILT SURVEY BY: EVAN WAHLSTROM, PLS#44651 (INFORMED LAND SURVEY) ..................................... ............. . LF 1 �" DI CL 52 WA I tRLINE, WITH POLYWRAP J305TALL "YD RANST PPAD A 'goc < wALL LbwtJ TO SL67E. 3224059081 101 14+00 15+00 x J 1.L. 00 � O L0 L0 � wx W � V) STA 15+09, 13' RT 12"x6" TEE, (MJxFL) W/TB 12" GV, (MJxMJ) 6" GV, (FLxMJ) 1 FIRE HYDRANT ASSEMBLY (23' RT), PER r3 STANDARD DETAIL B102 POLYWRAP 6" STUB. �3@ 31 LF 12":: DI CL 5 .. ......... 7 ... 7 ... 7 . . . . . . . . . . . . . . J Q W A% ER all 57 LF 12" DI CL 52 30 16+00 �Q 'W UTILITY NOTE: THE CONTRACTOR SHALL CALL THE UTILITY LOCATION REQUEST CENTER (ONE CALL CENTER; 1-800-424-5555) FOR FIELD LOCATION OF UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WITHIN THE PROJECT, WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE VERTICAL AND HORIZONTAL LOCATION PRIOR TO CONSTRUCTION. ALL POTENTIAL UTILITY CONFLICTS SHALL BE POTHOLED A MINIMUM OF FIVE WORKING DAYS IN ADVANCE OF ANY PIPELINE TRENCH EXCAVATION. THE UTILITIES SHOWN ON THE PLANS ARE BASED UPON AVAILABLE INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS OCCUR THE CONTRACTOR SHALL CONSULT THE PROJECT ENGINEER TO RESOLVE THE PROBLEM PRIOR TO PROCEEDING WITH CONSTRUCTION. • • • • -• AS�BUILT 1.HL .y THE ORIGINAL PLANS WERE STAMPED 1" = 20' SC AND BB ON 2/14/2011 & 2/15/2011 WBY 353101 �Oamwxhaq Lxcu CONSULTING ENGINEERS 701 DEXTER AVENUE NORTH09SUITE 200 SEATTLE, WASHINGTUN 98109 (206) 284-0860 SURVEYED: SOME: 88 HO KC ' /INI DATUM := }=- Cl TY OF - � RENTON Planning/Building/Public Works Dept. LAKE WASHINGTON BLVD NORTH STORM WATER AND WATER MAIN . IMPROVEMENTS WATER MAIN PLAN AND PROFILE SHEETS M%7- 2/14/11 DESK.'I�ED. B.P.B. : ME42nm ► C.J.K. ONE � AT � NOT ONE MH " Y Ow►wM No: 10 CHMKM S.A.C. NO. REVISION BY DATE APPR B.P.®. �= 10 OR 27