Loading...
HomeMy WebLinkAboutWWP2703549.90 U 0 0 U Ln c+> N co C 'm fn m c 0 C in LL w ry x N Q) 3 .c a0 E m Lo v u ID ui Q z w J LL EXIST MH 5315 135 RIM EL = 398.04± CL CHNL 12" (N, E) = 386.39± —' '"4ITS OF CONSTRUCTION (TYP) F- 10' CONSTRU 2+00 1+50 RECORD DRAWINGS THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED IN PART ON INFORMATION PROVIDED BY OTHERS THIS DRAWING SET WAS PREPARED ONLY FOR THE PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREON AND IS NOT TO BE USED ELSEWHERE Date 1/7 By /Z/61/3 0 1+00 \ � I r I 9 = r �jF ENCE' r r .7yp) r fr , r r r r � r i r r TEMP BYPASS PUMPING SYSTEM 14 PLUG •\ (TYP EA END) 8 \ EXIST 12" SS 0 c VALVE VAULT 12" SS ELECT BLDG 6 \ WET WELL 6 9 EAST RENTON LIFT STATION FACILITY 4 EMERGENCY STORAGE WELL EXIST lollSS TEMP BYPASS PUMPING SYSTEM 14 PLUG (TYP EA END) EXIST MH 5314 078 RIM EL = 401.20 r CL CHNL 10" (E, W) = 387.20 BYPASS PUMPING PLAN SCALE: 1" = 20' FILE: 8235C00-C-100 BURIED UTILITIES IN AREA PLEASE CALL BEFORE YOU DIG 1.800.424.5555 y 15" SS C C 'Afa rAMFAVW@ EXIST 12" SS 3 (TYP) SLOPE 1 % (TYP) EXIST 60" O MH 5314 079 MANHOLE CHANNELING SCALE: 3/4" = V-0" FILE: 8235C10-C-08 QUARRY SPALL C-06 GENERAL NOTES: A. 4" PVC CONDUIT DESIGNED BY CENTURY LINK NOT SHOWN ON THIS SHEET. SEE PIPING PLAN AND PROFILE SHEETS FOR DETAILS. Tom' flKNESS TO MATCH STING. CLASS 3/4" HMA WSDOT SECTION 9-03.8 3-INCHES CSTC PER WSDOT SECTION 9-03.9 (3) ICHES CSBC PER WSDOT ;TION 9-03.9 (3) NEW AC PAVEMENT SCALE: 3/4" = V-0" FILE: C-07.dwg COARSE AGGREGATE - .I III —III C SECTION 5 SCALE: 1 1 /2" = 1 "-0" FILE: 8235C10-C-08 AS NEEDED TO SUPPORTLOADS EOTEXTILE FABRIC TEMPORARY 8"0 PIPE CULVERT TEMPORARY STREAM CROSSING SCALE: 1/2" = V-0" FILE: 8235C10-C-08 KEY NOTES: OTEMPORARY BYPASS PUMPING MANHOLE. MAX NOISE OF TEMPORARY BYPASS SYSTEM SHALL BE 45 dBa AT NEAREST RESIDENTIAL PROPERTY LINE. FIELD VERIFY DIAMETER OF MANHOLE. OLOCATION AND DATA FOR EXISTING MANHOLE IS BASED ON CITY OF RENTON GIS DATA AND IS APPROXIMATE. CONTRACTOR TO FIELD VERIFY. OCHANNEL WITH FAST SETTING CONCRETE. CHANNEL HEIGHT = 12 INCHES. 4O BYPASS PUMPING DISCHARGE LOCATION. ROUTE PIPING TO INVERT OF EMERGENCY STORAGE WELL. TEMPORARILY SUPPORT PIPING AS REQD. OCONSTRUCTION OF TEMPORARY STREAM CROSSING IS PROVIDED TO FACILITATE EQUIPMENT ACCESS ALONG PIPELINE ALIGNMENT. CONTRACTOR TO INSTALL PER GENERAL DETAILS SHOWN ON THE DWGS AND PER BEST MANAGEMENT PRACTICES. SUBMIT TEMPORARY STREAM CROSSING TO ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. REMOVE ALL MATERIALS FOR TEMPORARY STREAM CROSSING PRIOR TO STREAMBANK RESTORATION. SEE SUB -SECTION 10.02910 FOR ADDITIONAL REQUIREMENTS. OCOMPACT CSBC AND CSTC TO 95% MDD PER ASTM D 1557. O7 COMPACT HMA TO AT LEAST 91 % OF ITS MAXIMUM THEORETICAL SPECIFIC GRAVITY (RICE DENSITY). OCONTRACTOR TO COORDINATE WITH LOCAL HOA FOR STORMWATER DETENTION POND ACCESS. OTEMPORARY BYPASS PIPING. CONTRACTOR TO ROUTE ABOVE GROUND/UNDERGROUND AND SUPPORT AS REQUIRED. 10 SEE STREAM DEWATERING PLAN FOR COFFERDAM DETAILS. ADD VISQUEEN SHEET OR EQUIVALENT TO FUNNEL STREAM FLOW. 11 VISQUEEN SHEET OR EQUIVALENT AT OUTLET OF CULVERT. 12 EXTEND CLSM TO 5 FEET OUTSIDE OF STREAM. 13 INSTALL CONCRETE CUT-OFF WALL AT END OF CLSM. 14 USE TEMPORARY PLUG TO BLOCK FLOW TO DOWNSTREAM MH DURING BYPASS PUMPING. S=03 54909