Loading...
HomeMy WebLinkAboutSWP2703578.3I IL 0 -,x NEW GB-2 54. REMOVE EX. METAL VAULT RIM EL=113.40 .� NEW S 30E-110.40 CROPONGG LIMIT SEDi SSMH RIM — 115.11 8" Pvc 0IS-f N IE = 104.41 8" Pvc #N E IE = 105.11 8" PVC IN S IE = 104.61 ------ ----- f DOUBI YELLO X ' ash' OUT M, FE' 110.4• am TRIPE T.L. # 3345700163 2?136' DRAINAGE EASEMENT 8" ORDINARY HIGH WATER MAR SANG BAG COFFtl?13AM CENTER OF STREAM C NEL 120 PIPE SSMH RIM = 116.37 8" PVC OUT N IE = 105.37 8" PVC IN S IE = 105.57 U 10 20 I=10, S HALT i FOG STRIPE �o %2t Ilk) B. ----- ............. ................. ....... ---• ........................................................••-.,....... ................"TO 3" DIA. TREE NOT ..... .. ----- 12 ......... ....•.... ......... ..-.-••• •......- -•-•,... ••... .. ......... ......... ......... ......... ......... ......... .........`i... I}I.... ED:....... 1 .... :NEiN CB-2 54" ........ ........ i..:.. ::::::: ........: :::: . . . . . . :::::::: .................. ::::: 'I#EE +CO =E}(: 11=iA�:1�diTL? .::::: ::::..... ......... :::::: ; :: ::::::::: fOG ::AGE OI"- - - • - ::::::: ......... :: :::.:.... ....... : ........ : R : -; . 3i4�i :.. . I ....... PAVEEME t ...... ' ....... ......... ...... ...... N S' 30" $E=1 ta.40 ........ ......... ..I...... PROPI PI ;LIFE . - ::: ; :: ::::::: ; : ::::: ` : : ... .. E........, .. .. I.... ...... ........... :R 5i�:.R. ........ ....._........... ... ... ................ .� .....,. .............. ................. ................. .,--.-.......... F,It3Y :1NJR:iISP1;? :�: I. 120 ....... Iac. METAL STRUCTURE ..... '_ ........ .. :.._ . .-......... 1 ZO ... . .. ...... ......... .... �.�: ...... ... ......... .... ...... .I:..... ......... ......... ......... ......... .... ... 3a IE=i 13.0 ....iDt : sue. ........... :I:..... ... , ......... ....... ... ... ........ ,� ...._.... 1. L .. .... I: ......... .... . I: .............. ................. ................. ........... s .............. ........... �'... ............ 1' ... . ' 1 ...' . ........ :�M: FDR .... ... � .. .�� ......... ..... �.-......... '� :AINIxfIQl:.. .... ;c� . .. ......... .. _.. �_r�l,' ........ . �.� "' ....... .... ...r-.:_'... :�u31 'II%v; s�l+lr�lj' : ......... ... . a,,.� :f .� . ,�''a `'`' . . . . . . . . . . . . . . . . . .:.: ...... 110 :�...... : 3ei ? ':.. - .. ......... ......... .S w. CI"iAl l : 11 -� r3;1 a ........ : ''i ... . .� .. : :I 0....... ......... ......... ....... ......... :; ---`"`� :::::::: ::::..... ......... ......... :::::;::: :::::;::::Q• : :....... ......... :....... ::::::;:: ::::..... ......... ........: ..;....., ....... ......... ......... ......... ........ ......... .......- ........ ........... ........_. ................ ............ ............... ®. ....,.. 105 ....--... ,' ......... .... ........ .--•..... �,. ;.....,,,. .......- - - - - -- - �...... :SA.:E:. I-ORI: ...:'4: ....... ........ . ....... I.. :: ......... ......... .......:. ::::::: ......:: ......::: �� , :�....,..., ......... ._.. PROFILE ALONG STREAM CENTERLINE CROSS SECTION A —A CHECKED FOR COMPLIANCE TO CITY STANDARDS (��dAA�L-DafeLry1 _.... J Dafe Dafe �__..... RECOMMENDED FOR APPROVAL BY BY J. Sr WAS NAL FN REVISION �� s o r •--.• 9� As Noted IV WT Ow NCH SCAT£ ACD&IMMT CALL 48 HOURS BEFORE YOU DIG 1-800-424--5555 EXISTING UTILITY LOCATIONS ARE APPROXIMATE, NOT ALL UTILTIES MAY BE SHOWN. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES, GENERAL NOTES: A. THIS PLAN DEVELOPED FROM BASE SURVEY FROM OTAK, INC.. B. IN ACCORDANCE WITH APPROVED PERMITS, CONSTRUCTION WITHIN THE ORDINARY HIGH WATER (OHW) MARK WILL BE LIMITED TO BETWEEN MAY 15, 2011 AND OCT 15, 2011. C. A COPY OF THESE APPROVED PLANS AND PROJECT SPECIFICATIONS MUST BE ON THE SITE WHENEVER CONSTRUCTION IS IN PROGRESS. D. ALL WORK AND MATERIALS SHALL, BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS AND SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION," 2010. AND AS AMENDED BY THE CITY OF RENTON SPECIAL PROVISION. CONSTRUCTION NOTES. INSTALL OPEN CURB FACE FRAME AND GRATE. SEE STANDARD DETAIL PLAN 203.00 l�1 INSTALL DEBRIS BARRIER ON BEVELED PIPE END SECTION. SEE STANDARD PLAN 223.10 �3 PLACE 18" THICK LOOSE QUARRY SPALLS TYPICAL. TRENCH BEDDING AND BACKFILL (NTs) TRENCH EXCAVATION PAY LIMIT 7'-0' MAXIMUM SEE DETAIL FOR PAVEMENT PATCH e &A 4 4 12" MIN. -- ! 6"MIN t: _ .; BACKFILL MATERIAL WSDOT SECTION 9-03.19 HANK RUN GRAVEL, OR NATIVE MATERIAL IF IT MEETS SPECS. PIPE ZONE MATERIAL WSDOT 2006 SECTION 9---03.12(3) GRAVEL BACKFILL FOR PIPE ZONE BEDDING NEW UTIUTY PIPE EXCAVATION OF UNSUITABLE SOIL, (IF NEEDED) DEPTH AS APPROVED BY ENGINEER BACKFILL WITH FOUNDATION MATERIAL MEETING WSDOT SECTION 9-13.6 QUARRY SPALLS NQi 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT PIPE ZONE MATERIAL TO 95% MAXIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL. BE HAND TAMP ONLY, 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE THAT THE FLOW UNE IS MAINTAINED. & CITY OF RENTON Planning/Building/Public Works Dept. C-) 0 % DESIGN 08/18/11 LINCOLN AVE NE AND MONTEREY PL NE STORM SYSTEM REPLACEMENT C3 STREAM INLET STRUCTURE AND PIPE WIE 3 OF. 3 ,IJ-35700 3 con 0--i t" 02 �n c� Uril m u N oY ®' zz W � `z