HomeMy WebLinkAboutWTR2703603.5C)
W
r
1
r
0
3
A
A
3
0
w
0
i
3
A
W
0
A
ix
CK
W
z
a
a
0
OD
I
0
W
H
U
W
0
ix
a.
cq
i�
Ld
Mi
Q
Z
w
J
Ll
CD
0
tU
z
0
V)
ch
w
Ld
U)
0
N
CA
\
OD
w
Q
0
c�
z
0
J
0-
SEPARATION REQUIREMENTS FOR WATER METERS/SERVICES -
• 5 FT. FROM POWER VAULTS, HANDHOLES AND STREET LIGHTS AND ELECTRICAL SERVICES _ \ \� /i SUBGRADE
• 3 FT. FROM OTHER WATER METERS SERVICES, F. HYDS. AND B.O. ASSYS.
\ PIT RUN 3" MINUS O
10" MIN.- 1 Y MAX // a
18'1 s do 1" SERVICES 3' MIN, 95°b COMPACTtN CRUSHED ROCK
(TYP) 51W 1 1 /2" w O
_ o �
-�—
x .�/5• Is-
2 NATIVE MATERIAL IF
APPROVED BY DISTRICT PIT RUN 3" MINUS
AND I
CRUSHED ROCK.
AGENCYCONSTRUCTION 90% COMPACTION 5/8"-1 1/2"
1"MIN - 2"MAX. FROM INSIDE `I
'-
FRONT WALL OF METER BOX z REPRESENTATIVE
(TYPICAL FOR ALL SERVICES) o
—3/4- ANGLE STOP W/LOCK WING, FORD 12" MIN. 90% COMPACTION
NO. KV 63-342W OR MUELLER H-14259 INLET OUTLET %
COMPRESSION PACK JOINT ADAP- co
TER. MUST BE CAPABLE OF RE-
CEIVING 3/4" OR 1-ANGLE STOP SAND -SOIL ENGINEER APPROVAL Z
W/ NO ADDITIONAL FITTINGS & COMPACTION TEST REQUIRED U)
`
N0 PEA GRAVEL
1" HI-MOL PLASTIC PIPE, CL 200 MID -STATES PLASTIC HDPE METER BOX NO. BC111812BXL 5/8° MINUS CRUSHED S
DO NOT BACKFlLL UNTIL ALL BRASS
FITTINGS HAVE BEEN INSPECTED BY
THE DISTRICT. EQUAL DIST• INLET OUTLET _ �U/�
6„ lMIN. VJ
SINGLE SERVICE EQUAL DIST
4" ROCK OR
f.. : • F<,_,,_ ::`;.; SOILS ENGINEERING 90% COMPACTION �' OTHER MATERIAL
DETAIL NEEDED LISTED ABOVE z
NOTES: U
NOTES.
1. THE ANGLESTOP MUST BE EQUAL DISTANCE FROM THE LONGITUDINAL SIDES OF THE ti
METER BOX. THE OUTLET OF THE ANGLESTOPS MUST BE BETWEEN 10"- 12" BELOW THE 1. BEDDING -IN RIGHT OF WAY, DRIVEWAY TRENCH WIDTHS/`� W
O �
BOTTOM OF THE METER BOX LID. THE ANGLESTOP MUST BE 1" MIN.- 2" MAX. FROM THE �'
PARKING LOTS, PAVED AREAS, AND NON- NOMINAL
LATITUDINAL END OF THE METER BOX AND MUST BE VERTICAL (W) TO GROUND LEVEL MINIMUM MINIMUM
PENTEK #175001 LID MARKED "WATER" PAVED AREAS. PIPE EARTH ROCK MAXIMUM Q - �� 0 ` J z
2. THE ANGLESTOP CONNECTION ON THE CUSTOMERS SIDE OF THE METER MUST REMAIN IN A DIAMETER z
VERTICAL POSITION AFTER THE CONNECTION TO THE CUSTOMERS LINE HAS BEEN 2, BEDDING FOR RIGID PIPE -NATIVE MATERIAL 2 1s 24 36 Z p �c o
COMPLETED. UNLESS JUDGED UNSUITABLE BY THE
18 24 36 O �y "��� s
DISTRICT AND RIGHT-OF-WAY AGENCY 3 �F
3. THE METER BOX MUST REMAIN FREE OF FOREIGN MATERIAL SUCH AS CONCRETE do ITS CONSTRUCTION REPRESENTATIVE. 4 18 24 36
BY-PRODUCTS.
6 21 24 36
4. METER BOX SUPPLIED BY OWNER/CONTRACTOR. METER BOX SHALL BE MID -STATES 3. TRENCH BACKFILL, BEDDING AND MATERIAL g: 24 24 36
USE MID -STATES PLASTIC BOXES UNLESS OTHERWISE APPROVED BY DISTRICT HDPE METER BOX NO. BC111812BXL PLASTIC HDPE METER BOX NO. MID -STATES
8128XL WITH PENTEK #17TER B 1 LID MARKED "WATER" TO CONFORM TO RIGHT-OF-WAY AGENCY 12 28 28 40 O
FOR 5/8"x 3/4" METERS OR MID -STATES PLASTIC HDPE METER BOX N0. eCF1324128 WITH SPECIFICATIONS AND DISTRICT STANDARDS. �
SEE DWGS W-17 & 18 �� �� PENTEK f175003 LID MARKED "WATER" FOR 1" METERS OR AS APPROVED BY DISTRICT. (IN INCHES)
W FOR 5/8 x 3/4 METER (SEE DwcS. 17 18) o co
17 "rS w METER INSTALLATION W TYPICAL TRENCH DETAIL W a
w 33 NTS TYPICAL SERVICE DETAIL 19 NTs > _j � a
Q
16 NTS
z l
U 2
a a � a w m
o(L as
0
N
z
z � V m
N V)
Ld z
~�0
W
0r I
J06'N a-
mzz
O?OX go
CLQ0LL wz
W
zz _ZJ Sm
Z=0
O�QN D
CC N
CD � z
CC 5 I W 44
oia
O Qz�
I C'4m� 0 0
D [D
ID w QN z
J cn
Q Ix
°
W
z 0°
O `
N
Q ct
WU o
E- -
QCL'zW(n
� F ED
L X
woo
LLI z WQ = W
F F_
U � Q a
i„l,l w 0-
Oc Q
O�
U)
BASE MAP E-2
SHEET 5 OF 5
DRAWING E2.022
-1 I
5
METER SIZE
METER BOX
MID -STATES PLASTIC, INC.
3/4"
HDPE
METER
BOX NO. BCF1118128XL
WITH
PENTEK
#175001 LID MARKED "WATER'
1"
HDPE
METER
BOX NO. BCF1324128
WITH
PENTEK
#175003 LID MARKED "WATER"
It
O
b
d
tt