Loading...
HomeMy WebLinkAboutWWP2703621.29W c ' � V Q w z F- U Q W _ i - (..L z �0 VJ z w X w cr w w 0 Q z CL rw V Q w Q z J LLL 'AANIICLE F_;AME AND COVER SE= SIG. PLAT. 401 AC'_USTMENT RINGS ;2" MIN.; =E= NC-E 6 'ACRTAR .IrlIN"(F, 13/8' WIN.) SEE NOTE 5 .. N► (ECCFNTRI_' RUP.R=R GASKET'D JOINTS IN A•: 'R•DANOF W9-H A.ST4d C-1•=3 S-EPS - Z10-YPR'JPY FNF' STEPS STALL BC INCLLDLD CONCRETE RISER BY PIPE 11<_ OR APPROVED FQI.AL LADLER-PULYPROPYL_N= SHALL BE ATTACHILL IJ MANHOLE MAX. PIPE SIZE - L' CONCRC'E S'HLLF 'RECAST RASE SECTION OR CAST IN S=ELT. NOT TC SCALE 48" VH 54" VH A' 48" s4" O. 6" MIN., 5"MIN 24" MIN. 8"' MIN. 5,5" MIN. 24" MIN, ,F. 91" .0 24" LU. 00' MI i 6C" 8" MIN. 6'__M V. 42" h+11N. 3C" LJ. NC,"ES. I STEPS TO BE POLYPRO`YLENE SAFETY STEPS. 2. S-EPS ARE TO BE IN r'LA& BEFORE MANIICL[ SECTIONS An IN_-ALLCD, 3. CASTI\G SHAD P,F PER STD. :'I AN e01 4. MAN-Y) F SF:"ICNS lr1 RE OF REI',FORCEC PRECAST CONCRE-E 5. ALL OINTS BETWEEN THE CONE, RISER R NOS, BRICKS AND CASING SHAI I RF :,R UTED AUJ_S*L:NT Of HE-'ASiI\G IO GRADE Sr ALL BE ACCCMFLISHEC MTH A CCVBINATON CIF ADJUSTMENT SINGS, BRICKS AND MO�IAK ONLY BRICKS SHALL BE STAGGERED -0 i REATE A :ZJNN'NG BOND OR 1 /2 BOND. TH= USF OF SHIMS IS PROHIBITED. 7 SANITARY SLWER MANHOLES S-IA.LL -AVE AL_ INTER OR SUR ACES, NCLUDI',G CHANNELING, CUAfED (SEALED) PATH A. H GH SUL DS URL IHANL COATING. WA.SS_R MC-ARDSHIELD )R AP-NOVt)=QJA-: COLOR OF COAIINC SHALL B_ 'WFI-E 8. RUBBER CASKETS:' JGINTS SFAI L BE IN CO'•JFORMAW'F Wl ASTb' 441 9. CHANNEL HEIGPT -HALL BE A 'JINiMUM OF 3/4 OF TH= INSICE OI,AM=TER OF THE LAR:CES1 PIPE 10. CCNNLCTIU\,S TO MAN-WL_ S-:ALL EE MADE USING C=K .ADAPTOR, KCH-N-SEAL BOOTS OR APPROVED EDUAL. IL IN UNIMPROVED AREAS, MANHOr FS SHAI I FXTFND A MIN MOV niF F," AND A MAXIMUM :J= 12' ABCVE FINISHED GRACE OR MUST HAVE r, 'AIN MUM 2' DIAMETLH CUNCRE IL RINGS aOURFD AT GRADE IN PAV=" ARFAF, COVER NITS- SLO�F IN ALL DIP.ECTI('_f4S TC A'ATCH PAv,NG Y_ I PLHLJC WORKS STANDARD SANITARY MANHOLE �PLAN-�1DEPARTMENT ; , SEPTEMBER 2011 PROPCRTY LINE ---� =UTURE U'DI_PNG SLWLH TIP: AlJll DIN(+ .`.:CWER. i "tF wf'H ?" SIL>t O.IILET ? LC"X6'X6" WY- \"I-2'a 4" STJD MARKING PCS- 'AIVILC SILRFACF ('I T AN:XI I 'Mill W`-1TL VA I I- FE WORD "5"Jr:=R" :TEN' ILEJ tic ('AS' RON' RING IN COVER IN IIICH BLACK LETTERS AND CIS A'IFif a. 'EA$T JOPCAI•, I:TON WORKS WRAPI'_G AROJND THE rHP STUD ANC ?g75 OR APPkOVED EaUAL. SPECIFY "SEWER' ON , i 1, s" mac+ StV* t ANtI At.II_DIN; Sr_WER L `TD. -LAN a0i-1 FOR INSTALLATION) ACCEP7A8_E PROCEDuP.ES FOR 3IOF S, WR CONNLC IONS TO MAIN LINES ARF AS FC( OWS A. oTRIFIF'1 CI AY MAi\ - CUT IN A vLPl IEE USIVC FLEXIELF C01,1P.INGS (FEiN a OR APPR0VF1) EOIIAL) E. CONCRETE MAI', - C2fxF-I)RIItD 1811-1 A ROMAv SADDLE (DR ArrR0VE0 ECL.AL,. C. PVC R<AN _ORE-CRILLED WITH A ROIAAG SADDLE rOR APPROVED EQUAL) Dk C.JT IN A WIN-EE JSING RICID CCUP_ING�. D. CUCTIF IRON 4AiN - CCRE-DRILLCD WITH A ROMA:: SA)DLF (7R APFROVFI; FWAL) . F, MANHOLE OJVNECTION - ALL CJNNLCI CNS TO A'ANHOLES SMALL BE A' 'AA.NJFAC-UREC• KNOC,(-OUTS OR THI STRJCILI;qL SHA-L BF ^ORE -DRILLED. 60" AL'_OWABLf MAX. FOR CAST IRON PIPE OR DUCT LE RON FIFE. 1:3:5 MiX CONC FETE c3_OCKING t � G" SIDE OUT_ET -M SFWFR 6" MIN MAIN CONCHEIE _ACCKING ANG, F CF TEE .AT MAIN C'v'ER 25 ELEVATION r� kN�i O�'K r N i NO �(CR- C. % KAN SLOPE FORIZONIA.L SEWER MAIN TYFICA_ SIDE SE'WFR F I - `JA- ON N(;-E- UNLCSS OTHER"SC SHOWN ON P-AN, SIDE Sl WF R SHAI I HAVE A MINIMUM 2-5' COVER AT DROR_R I" LINE OR ? 5' LONER THAN THE LOVES- HOUSE ELEVATION, V6-IC-iEVER IS _OWER. PUBLIC WORKS STANDARD SIDE SEWER STD. PLAN - 406.1 j_mr._R�" DEPART1fEN" IINSTALLATION (SEWER MAIN TO PROPERTY LiNE) SEPTFkIRER 2011 WARNING: THE UTILITY LOCATIONS SHOWN ARE APPROXIMATE ONLY. DEPTH UNKNOWN. CALL 1-800-424-5555. BDLTHOLES - 3 PL.CS EQUALLY SPACED 120' APAR1 DIN 23 '1/16' (586r,n; 11-4 B.C. (SEE ATA1L) �(I/ �� R E N T O N 1� 'III III i I + JI III , O SEWER s Ott IN USA COVER & FRAME PLAN VIEW 3/4' r25nn] [19nn] 4 .,j 88 3�1 2 1/ 2' C222n1 11 C 64n 1] TYD COVER SECTION VIEW r_F 16 1 DIA ] 1 1/16' �,/_Nc,_pr4r,4E GA :ET f I 6' C131 nn] 23 3%$ DIA CL OPEN DIA DIA COVER BOTTOM VIEW 3: ®LT SOC. (ALLEN HEAD) 5/8'- 11 'X 1.1 55 \ RUBBER WASHER EON BOLTING DETAIL 1/4' C6rMnT �_F [27rrd i _ T C3nro1 j<� rR3Mn1 GASKET GROOVE DETAIL NOTES, FRAME SECTION VIEW 1. ALL COVERS SHALL BE LOCKING UD PER EAST JORDAN IRON WORKS INC. No, 3717C1 OR EQUAL. 2. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER), SANITARY "SFECIFY "Sethi" OR WATER (SPECIFY "WA.TER"). STD. PLAN - 401 +j 14 MANHOLE FRAME AND COVER -- MARCH 2008 I- W (SEE NOTE 4) .{r- LIMITS OF PIPE ZONE /'� BEDDING MATERIAL FOR�� SANITARY SEWER PIPE,j 0_D_ OF PIPE (SEE NOTE 6):% FOUNDATION LEVEL '/' f BEDDING FOR SANITARY SEWER PIPE NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL, 2. HAND TAMP UNDER HAUNCHES, 3. COMPACT BEDDING MATERIAL TO 95% MAX DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY SEWER SECTION OF THE STANDARD SPECIFICATIONS FOR TRENCH WIDTH "W" AND TRENCHING OPTIONS, THE PiPE ZONE WILL BE THE ACTUAL TRENCH WIDTH, 5. TRENCH BACKFILL SHALL CONFORM TO "BACKFiLLING" IN THE SANITARY SEWER SECTION OF THE STANDARD SPECIFICATIONS, EXCEPT THAT ROCKS OR LUMPS LARGER THAN 1" PER FOOT OF PIPE DIAMETER SHALL NOT BE USED IN THE BACKFILL MATERIAL. 6. PIPE ZONE MATERIAL SHALL BE "GRAVEL BACKFILL FOR DRAINS" AS SPECIFIED IN THE AGGREGATES SECTION OF I IL STANDARD SPECIFICATIONS. 7. PIPE MUST BE ANCHORED IN SUCH .A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. �^ PUBLIC WORKS PIPE BEDDING �_ PLAN4__ DEPARTMENT FOR SANITARY SEWERS MARCH 2O06 S U L T I N G ENGINEERS L L C ®CON Avenue South I ® I W Suite 205 Federal Way, WA 98003 FEDERAL WAY (253) 838-6113 www.esmcivil.com SETT (425) 287-8900 ELLENSBURG (W11) 962-2608 Civil Engineering Land Surveying Land Planning Public Works I Project Management I Landscape Architecture ESM JOB # 1352-006-007 12 Yr' 14" RECESSED LIFT POCKET W" - II N.C. SOCKET HD SCREW 1 Y4" LDNG (BRONZE OR S.S.) h' x 2` RAISED PADS 2„ A(- 2._0„ r IF 6" CONCRETE CLASS 300D ,I FIBER JOINT PACKING yal 45'{1j8) BEND -+ T 2- 1 8- 1 > Z" h---- 12 Y,, I �p 1 4- ' CAST IRON RiNG WATER TIGHT PLUG PIPE MATERIAL AS SPECIFIED BY THE ENGINEER PLUG TO BE SEALED iN SAME MANNER AS MAIN SEWER JOINTS. NOTES: 1. 8' CLEANOUTS SHALL BE EAST JORDAN IRON WORKS, INC. No, 3698 OR EQUAL: CLEAN OUT SHALL SE A WATER TIGHT ASSEMBLY, 2. IN UNIMPROVED AREAS, POUR A 1'-C" THICK, 2'-Q' SQUARE CONCRETE, CLASS 3000, PAO AROUND THE RING AND COVER. b STD. PLAN - 403.1 PUBLIC WORKS 8 OR 6 INCH CLEAN -OUT +_ :+ DEPARTMENT _ K -- -- -� - MARCH 2O08 S=3 62 129 Utility Specifications Sanitary Sewer Notes and Specifications THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY. L All work and work material shall be in conformance with the standards and specifications of the City of Renton Planning/Buibrig/Public Works Department and the latest edition of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans & Specifications. A set of approved plans shall be kept on site at all times during construction. 2. The hours of work in the street right of way shall be per City specifications on weekdays unless otherwise approved in writing by the Planning/Building/Public Works Department. An approved traffic control plan must be obtained prior to beginning any work within public right of way. 3. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 4. A pre -construction conference and a 24 hOUr notice shall be required prior to starting new construction. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. (Inspection will be accomplished by a representative of the City of Renton.) It shall be the contractor's responsibility to notify the Public Works inspector 24 hours in advance of backfilling all construction. 5. Contractor is solely responsible for the means, methods and sequences of construction and for the safety of workers and others on the construction site. 6. It shall be the responsibility of the contractor to obtain street use and any other related permits prior to any construction. 7. Plans approved by the City of Renton, Public Works Department shall take precedence over all other plans. 8. A copy of these approved plans must be on the job site whenever construction is in progress, 9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary sewer system, which has been stamped and signed by a licensed professional engineer or licensed professional surveyor. 10. Backfill shall be placed equally on both sides of the pipe in layers with a loose average depth of 6 inches, maximum depth of 8 inches, thoroughly tamping each layer to 95 percent of maximum density. These compacted layers must extend for one pipe diameter on each side of the pipe or to the side of the trench. Materials to complete the fill over pipe shall be the same as described. 11. Open cut road crossings for utility trenches on existing traveled roadway shall be backfrlled with crushed rock and mechanically compacted unless otherwise approved by 12. Datum for Vertical Control shall be North American Vertical Datum 1988 Meters, and for Horizontal Control shall be North American Datum 1983/1991 Meters unless otherwise approved by the City of Renton Public Works Depattment. Reference benchmark and elevations are noted on the plans. 13. All disturbed areas shall be seeded and mulched or otherwise stabilized to the satisfaction of the Department for the prevention of on -site erosion after the completion of construction. 14. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with the standards and specifications of the City of Renton Planning/Building/Public Works Department and the latest edition of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans & Specifications. This shall include necessary leveling of the trench bottom or the top of the foundation material, as well as placement and compaction of required bedding material, to uniform grade so that the entire length of the pipe will be supported on a uniformly dense, unyielding base. Pipe bedding shall be pea gravel 6 inches above and below the pipe. 15. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed ASTM D 3034, SDR 35, or ductile iron class 50, unless otherwise approved by the Wastewater Utility, 16. In unimproved areas, manhole to extend minimum 6 inches and maximum 12 inches above finished grade or must have minimum 2` diameter concrete ring poured at grade. In paved area, cover must slope in all directions to match paving. CHECKED FOR COMPLIANCE TO CITY STANDARDS N.r� 0 FIRST SUBMITTAL ESM 09/18/12 SURVEYED SCALE VERTICAL: NAVD 1988 NAD 1983DATE: HORIZONTAL: /1991 / /201 1 SECOND SUBMITTAL ESM 01/25/13 DESIGNED: , C TY 0 � HERITAGE PLAT 09 19 8m Nl"S �� SANITARY SEWER EXTENSION PHASE 2 FIELDBOOK: 2 MYLAR SUBMITTAL ESM 01/28/13 R E N TO N 3 1 ST REVISION ESM 09 10 13 DRAWN PAGE: 43175 O / / 0m ONE INCH DRAWING NO: C/STERN 4 REVISED MYLAR SUBMITTAL ESM 0s 19 13 CHECKED: DATUM Planning/Building/Public Works De t. �ss/4NgL ENG� / / A*A AT FULL SCALEp SANITARY SEWER DETAILS SS-09 (� IF NOT ONE INCH N 0. REVISION BY DATE A P P R APPROVED: SCALE ACCORDINGLY SHEET: OF: 9�i9�i3 13 15