HomeMy WebLinkAboutWWP2703625.20
0
W
W
O
N
O)
L.J
Q
0
Z
0
J
CL
CIVIL
No.
Title
Cl
COVER SHEET
C2
SHEET INDEX AND LEGEND
EXISTING SITE AND TESG PLAN - NOT IN CRD SET
63
G4
TESG BET -AILS AND NOTES NOT IN CRD SET
C5
OVERALL SITE PLAN
C6
SEWER PROFILE
C7
LIFT STATION SITE PLAN
C8
LIFT STATION PLAN AND SECTION
C9
LIFT STATION MISC. DETAILS
C10
MISCELLANEOUS DETAILS
STRUCTURAL
No.
Title
S01
CONTROL BUILDING PLAN
S02
CONTROL BUILDING DETAILS
ELECTRICAL
No.
Title
E01
ELECTRICAL LEGEND
E02
ELECTRICAL ONELINE DIAGRAM AND SCHEDULES
E03
ELECTRICAL SITE PLAN AND LAYOUT
E04
MCC LAYOUT AND CONTROL DIAGRAM
E05
TELEMETRY BLOCK DIAGRAM AND MISC CONTROL
DETAILS
E06
ELECTRICAL DETAILS 1
E07
ELECTRICAL DETAILS 2
E08
GENERATOR DETAILS
Stantec
11130 NE 33rd Place, Bellevue WA 98004
phone: (425) 869-9448 www.stantec.com
N0.
REVISION
CONSTRUCTION SEQUENCE
1. ATTEND PRE -CONSTRUCTION MEETING.
2. OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS
BEYOND THOSE PROVIDED BY CITY (SEE SPECIFICATIONS) PRIOR TO
COMMENCING WORK.
3. COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING.
STAKING TO BE PROVIDED BY CONTRACTOR.
4. INSTALL PERIMETER PROTECTION AND TEMPORARY EROSION AND
SEDIMENT CONTROLS AND TEMPORARY STORMWATER AND/OR
DEWATERING TREATMENT FACILITIES (BAKER TANKS, ETC.).
5. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY
STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT
THE PROJECT.
6. CLEAR AND GRUB SITE.
7. PROVIDE PLANS FOR SHORING AND DEWATERING STAMPED BY A
PROFESSIONAL ENGINEER. AS AN OPTION, EXISTING WET WELL MAY
RECEIVE UP TO APPROXIMATELY 100 GPM OF CLEAN DEWATERING
DURING THE DRY SEASON AND 50 GPM DURING THE WET SEASON,
SUBJECT TO CITY APPROVAL AND INTERRUPTION DURING STORM
EVENTS.
8. INSTALL WET WELL, MANHOLE, AND VALVE VAULT AND BACKFILL
EXCAVATIONS.
9. CONSTRUCT GRAVITY SEWERS AND FORCE MAINS.
10. GRADE SITE AND INSTALL UTILITIES.
11. CONSTRUCT CONTROL BUILDING.
12. CONSTRUCT BLOCK WALL.
13. INSTALL ELECTRICAL AND CONTROL SYSTEMS, GENERATOR SET, AND
ALL RELATED LIFT STATION APPURTENANCES.
14. PERFORM TESTING AND START-UP FOR STATION.
15. OBTAIN CITY APPROVAL BEFORE TRANSFERRING SEWAGE TO NEW
STATION. PERFORM BYPASS PUMPING TO EXISTING WET WELL
DURING CONNECTION TO AND RECHANNELING EXISTING MH 5307065.
ABANDON EXISTING AIRPORT LIFT STATION AND CONNECT TO
GRAVITY SEWER. PLUG GRAVITY TO EXISTING STATION AND
REDIRECT TO NEW STATION.
16. REMOVE TEMPORARY BYPASS SYSTEMS.
17. PERFORM SITE RESTORATION.
18. REMOVE TEMPORARY BMPS ONLY AFTER ALL DANGER OF EROSION
HAS PASSED AND AFTER APPROVAL BY CITY.
19. PREPARE AND PROVIDE O & M MANUALS PER SPECIFICATIONS.
20. PROVIDE CONSTRUCTION RECORD DRAWINGS.
NOTE: THIS IS A POSSIBLE SEQUENCE. FINAL SEQUENCE SHALL BE
DEVELOPED BY CONTRACTOR AND SUBJECT TO REVIEW BY OWNER.
SURVEYED:
DESIGNED:
ELB/BWM
DRAWN:
BWM
CHECKED
BY I DATE I APPR I APPROVED:
SCALE:
AS NOTED
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD. 1983/1991
DATUM
LEGEND
EXISTING
PROPOSED
O SM
CATCH BASIN (ME)
SANITARY SEWER GRAVITY MAIN
El CB
CATCH BASIN
I Ot
SANITARY SEWER MANHOLE
_& UP
UTILITY POLE
LS
-- — — — — - — — - — ——
SANITARY SEWER FORCE MAIN
LIGHT STANDARD
O GP
GUY POLE
FRENCH DRAIN
❑ UB
UTILITY BOX OR VAULT
x
SECURITY FENCE
CD WV
WATER VALVEPERMANENT
SEWER EASEMENT
iO� MON
MONUMENT
° WM
WATER METER
TEMPORARY SEWER EASEMENT
FH
FIRE HYDRANT
— — —W
WATER SERVICE LINE
MB
MAIL BOX
Q
UNDERGROUND POWER LINE
RS
ROAD SIGN
�. SG
SIGN
CONCRETE SURFACING
ROCKERY
ASPHALT SURFACING
SANITARY SEWER MANHOLE
— — — — — — — — —
SANITARY SEWER GRAVITY MAIN
LANDSCAPING
— — — — — — — — —
SANITARY SEWER FORCE MAIN
O
CLEAN OUT
—Ire
WATER MAIN
----sr;-- sr,--
STORM DRAIN LINE
320
PROPOSED CONTOUR
— —
CONCRETE CULVERT
UNDERGROUND TELECOM LINE
P
UNDERGROUND POWER LINE
EDGE OF ASPHALT CONC.
_
PAVEMENT (ACP)
FLOWLINE
ROAD CENTERLINE
RIGHT OF WAY
NORMAL CONTOUR ELEVATION
INDEX CONTOUR ELEVATION
CONIFER TREE
DECIDUOUS TREE
S=362502
THESE CONSTRUCTION RECORD DOCUMENTS HAVE
BEEN PREPARED BASED ON INFORMATION PROVIDED BY
OTHERS. STANTEC HAS NOT VERIFIED THE ACCURACY
AND/OR COMPLETENESS OF INFORMATION AND SHALL
NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS
THAT MAY BE INCORPORATED HEREIN AS A RESULT.
DATE:
RENTON AIRPORT 4/25/2013
C TY OF LIFT STATION REPLACEMENT
FIELDBOOK:
R E N T O N PAGE:
Planning/Building/Public Works Dept.
60mmaPIt70:f_101t lI#N:1101li;
C2
SHEET: OF:
2 21
o•
�Z
'=
C
0 m
n-
n�
z
m
z
m
30
O
D
D
n
0
�o
A �
C
D Cn
A Cn
D •
D
A m
0
m D
n-
n�
U z
z
m
CIO
D
D
T
0
p0
D �
A