Loading...
HomeMy WebLinkAboutWWP2703627.4•0 3 CITY GRA VITY SEWER PROPOSED FORCEMAIN f Number Start Station Start Northing Start Easting Radius Length Line/Chord Direction Number Start Station Start Northing Start Easting Radius Length LinelChord Direction INVERT ELEV. DECOMMISSION EXISTING CITY -OWNED L1 O+OO.00A I 198765.78 1303807.62 100.00 N46" 53' 47.14"E L4 O+OO.00C 198780.88 1303823.62 I 49.85 S27"' 50' 37.97"W LIFT STATION AND CONVERT TO - f, MANHOLE, SEE NOTE L5 0+49.85C 198736.80 f 1303800.33 1 74.31 S650 35' 04.78"E 31.36' CONDO GRA VITY SEWER L6 1+24.16C 198706.09 130386&00 46.47 N630 31' 36.27"E 3,56° g CITY SIDE SEWER DISCHARGES INTO Number Start Station Start Northing Start Easting .Radius Length Line/Chord Direction L7 1+70.64C 198726.80 I 1303909.60 6,09 N14° 15' 52.24"E I 34.53' CITY -OWNED LIFT STATION, SEE 7NOTE L2 0+00.00B 198899.62 1303497.92 177.36 S560 59' 13.96"E L8 1+76.72C 198732.70 1303911.10 11.72 N22° 09' 10.58"E 34.75' Cl 1+77.36B 19$802.99 1303755.61 200,00 1$3.88 S83° 19' 33.35"E APPROXIMATELY 35 LF OF 8"GRAVITYSEWER MAIN WITH 15" STEEL CASING, - A_ 1 I& L3 3+61.24B 198782.37 1303822.91 134.37 N700 17'33.00"E TRENCHLESS CONSTRUCTION REQUIRED PROPOSED WETWELL - l r' t 1 1 1 g DECOMISSION EXISTING CONDO i I LIFT STATION AND CONVERT TO V CONDOMINIUMS PROPOSED ELECTRICAL MISTY COVE COND STANDARD MH. SEE NOTE 0 - BUILDING i s s i APPROXIMATE PROPOSED FLOW METER --Y AND MANHOLE xO�Q'+OOG DIRECTIONAL DRILL -,,- CONNECT TO EXISTING 100 , ✓----gip STAGING AREA I II ,4 �� - xr � ---- x x I x x� - x APPROX. 35 LF OF 4" DI SS FM -' 0+00B P 1+0013 f -- _ L2 --- - - -- TEMPORARY GARBAGE _ } RELOCATION AREA � TEMPORARY FORCEMAIN � PROVIDE (2) - 4" DI 450 °A BENDS W/ THRUST BLOCK CONNECTION TO EXISTING CAR PORT --�� CAR PORT GRAVITY MAIN. SEE NOTE x I d`d x x x x x x - t t .j APPROXIMATELY 52 FT OF , CONTRACTOR SHALL PROVIDE A 6 HDPE WASTE PIPE, MINIMUM OF 9' CLEARANCE FOR APPROX. 313 LF OF 6„ HDPE, GROUT PLUG BOTH ENDS U SEE NOTE 2 VEHICLE ACCESS AT ALL TIMES AND ABANDON IN PLACE PROPOSED SEWER PLAN_ .I $t = 20' PROPOSED LIFT STATION SITE � PROPOSED LIFT STATION SITE. RECORD DRAWING REVISED TO CONFORM TO CONSTRUCTION RECORDS RH2 E iNELRINC INC. UIA I E iga-1 EXISTING CITY LIFT STATION CITY -OWNED LIFT STATION PRIVATE DRIVEWAY 5 APPROXIMATE DAYLIGHT LOCATION APPROXIMATELY 130 FT OF 6" HOPE WASTE PIPE, GROUT PLUG BOTH ENDS AND ABANDON IN PLACE 3 EXISTING WATER SERVICE DO NOT DISTURB '. 1+92C PROPOSED �'1 VALVE VAULT -- .s. 9. CONNECT TO EXISTING 411 CONCRETE FORCE MAIN4 i APPROX. 6 LF OF 4" DI SS FM PROVIDE (1) - 4" DI 450 BENDS W/ THRUST BLOCK APPROX. 46 LF OF 4 ; DI SS FM PROVIDE (1) - 4" DI 450 BENDS W1 THRUST BLOCK USE EXISTING 8" SLEEVE UNDER RR. CONTRACTOR 207 U TO VERIFY LOCATION PRIOR C06Z� TO FM CONSTRUCTION --� APPROX. 75 LF OF 4" J DI SS FM CL- N PROPOSED LEGEND SANITARY SEWER WATER BY OTHERS WATER TO BE ABANDONED BY OTHERS WOOD FENCE �. CHAINLINK FENCE -_- CONSTRUCTION FENCE CONSTRUCTION LIMITS COIR LOGS OR HAY BALES ASPHALT CONCRETE KEY CONSTRUCTION NOTES THE PRIVATE CONDO LIFT STATION SHALL REMAIN IN SERVICE UNTIL THE PROPOSED LIFT STATION IS OPERATIONAL. THE EXISTING FORCEMAIN SHALL BE TEMPORARILY CONNECTED INTO THE EXISTING 12" CONCRETE GRAVITY SEWER USING A SADDLE TAP TO ALLOW CONSTRUCTION OF THE PROPOSED FORCEMAIN. AFTER THE PROPOSED LIFT STATION IS OPERATIONAL, THE CONTRACTOR SHALL CONVERT THE PRIVATE CONDO LIFT STATION TO A STANDARD MANHOLE PER CITY STANDARD DETAIL AND ABANDON THE EXISTING CONDO FORCEMAIN. 02 PROPOSED 6" HDPE GRAVITY SEWER LINE FROM EXISTING BUILDING DISCHARGE TO PROPOSED CITY -OWNED LIFE STATION. TRENCHLESS CONSTRUCTION REQUIRED. 03 THE CONTRACTOR SHALL MAINTAIN ACCESS TO THE SEAHAWKS TRAINING FACILITY TO THE SOUTH AND PRIVATE DRIVEWAYS TO THE NORTH OF THE PROJECT SITE AT ALL TIMES. ENTRANCE TO THE CONDO FACILITY SHALL REMAIN OPEN AT ALL TIMES UNLESS APPROVED TWO CALENDAR WEEKS IN ADVANCE. THE CONTRACTOR SHALL CONVERT THE EXISTING CITY -OWNED LIFT STATION INTO A MANHOLE AND IS RESPONSIBLE FOR TEMPORARY BYPASS PUMPING DURING CONSTRUCTION. TEMPORARY PUMP SHALL BE CAPABLE OF 15 GPM AT 18' OF HEAD. CORE DRILL EXISTING LIFT STATION MANHOLE, BASE GROUT FILL AS REQUIRED, CHANNEL, INSTALL ISOLATION VALVE, AND USE KOR-N-SEAL BOOT FOR CONNECTION. WASTE PIPE MAYBE LEFT IN PLACE UNDER RAIL ROAD TRACKS. ALL WASTE PIPE SHALL BE GROUT PLUGGED 1 FT THICK AT BOTH ENDS AND ABANDONED IN PLACE. IT IS ANTICIPATED THAT THE HDPE PIPE LAYDOWN WILL BE ALONG RIPLEY LN, IN WHICH CASE THE CONTRACTOR MUST SUBMIT AND IMPLEMENT A TRAFFIC CONTROL PLAN. ONE LANE WILL REMAIN OPEN AT ALL TIMES. =6. COORDINATE WITH PROPERTY OWNER FOR SERVICE OUTAGE DURING WORK INSIDE THE EXISTING WET WELL. CONTRACTOR SHALL REDIRECT SIDE SEWER IF NECESSARY TO COMPLETE WORK IN THE EXISTING WET WELL. S-362104 LO co c> N co W z Q o . U WC N ya+- W f- o M N � � z o U J W � 100 Z Q Cl) v Z d °Zo Z W Cl) U z ; ? O W U) o 0 0 C U N N LL � I '- W W I 4~ 0 Z 0 Z W C W ' W a o M I ­r C14 w c0 t `O O m ED a cCCcGG Cj SCALE: SHOWN g 2" DRAWING IS FULL SCALE WHEN BAR MEASURES 2" DWG NO.: SHEET NO.. CO2 04 21 e o C v r T77 7 2 III M 0 D I D n 0 -0 _ ro j® r p co << " D • G > 9 m 3 A � n � r D uz z m Cn 0 D c y 3 Q% y _� �yN 3� Z!,o Ir r W �N J I D T 0 0 30 M -7 G O 5D C 7 �W - { z • D