HomeMy WebLinkAboutWWP2703628.13H x
I rr n
48OV, 3 PHASE
MOTOR STARTER EQUIPMENT IN MCC, SEE SPECIFICATIONS
1FU
)F POWER
RT
MOTOR
CALL
OVERTEMP"
OVERTEMP
SEAL FAIL"
SEAL FAIL
CALL
DELAY
�L BYPASS
ED
JAL BYPASS
CTOR CALL
ION CONTACTOR
TO START SOFT
UNIT
SOFT STARTER
RESET
SOFT STARTER
RUN I
SOFT STARTER
FAIL
COUNTS
ED TIME
S)
RUN"
RUN
1672
ZONAL
SIGNED: 05123112
SIGNED: 05123112
5
a
0
z0 a
Z � J
W Ito O
Cr
ILL. cc
O z
O
i'► CrUj
c�
cc
„m
ftj O
O
2
ENGINEERS
PLANNERS
SCIENTISTS
RH2 ENGINEERING, INC.
http://www.rh2.com
mailbox0rh2.com 1.800.720.8052
BELLINGHAM 360.6765.0836
454 West Horton Road
BOTHELL 425.9S1.S400
22722 29th Drive SE, Suite 210
EAST
FAIL WENATCHEE 509.886.2900
300 Simon Street, Suite 5
RICHLAND 509.946.5181
114 Columbia Point Drive, Suite C
FAIL" SILVERDALE 360.876.7960
2021 NW Mhyre Rd, Suite 107
—
�� TACOMA 2S3.272.3USs
J� 66 E 6 RTU 621 Pacific Avenue Suite 104
FROM RTU PUMP CALL PUMP PUMP PUMP PUMP
(24 VDC) OVERTEMP SEAL FAIL RUN FAIL SCALE: SHOWN
COIL PUMP FAIL CONDUCTORS
0 1" 2"
IN BOTTOM OF "RTU" DRAWING IS NOT TO SCALE
DIAGRAM 1: PUMP P-1 P-2 IF BAR IS NOT 2" LONG
RECORD DRAWING PLOT: 1 DWG NO.
NO SCALE REVISED TO CONFORM ENGINEER: CCA E08
SM3628 13 TO CON§TRUCTION RECORDS
REVIEWED: MLM
DATE: Jul 15, 2013 SHEET N0.
6C,71/� 04/25/12 J
RH2 RING INC. DATE CLIENT: REN l
REVISED TO CONFORM TO CONSTRUCTION RECORDS AHF EH 04/25/13 JOB NO.: 112-033 17
NO. REVISION BY REVIEW DATE FLENAMF: LIBHS-D-EO8.DWG