Loading...
HomeMy WebLinkAboutWWP2703628.13H x I rr n 48OV, 3 PHASE MOTOR STARTER EQUIPMENT IN MCC, SEE SPECIFICATIONS 1FU )F POWER RT MOTOR CALL OVERTEMP" OVERTEMP SEAL FAIL" SEAL FAIL CALL DELAY �L BYPASS ED JAL BYPASS CTOR CALL ION CONTACTOR TO START SOFT UNIT SOFT STARTER RESET SOFT STARTER RUN I SOFT STARTER FAIL COUNTS ED TIME S) RUN" RUN 1672 ZONAL SIGNED: 05123112 SIGNED: 05123112 5 a 0 z0 a Z � J W Ito O Cr ILL. cc O z O i'► CrUj c� cc „m ftj O O 2 ENGINEERS PLANNERS SCIENTISTS RH2 ENGINEERING, INC. http://www.rh2.com mailbox0rh2.com 1.800.720.8052 BELLINGHAM 360.6765.0836 454 West Horton Road BOTHELL 425.9S1.S400 22722 29th Drive SE, Suite 210 EAST FAIL WENATCHEE 509.886.2900 300 Simon Street, Suite 5 RICHLAND 509.946.5181 114 Columbia Point Drive, Suite C FAIL" SILVERDALE 360.876.7960 2021 NW Mhyre Rd, Suite 107 — �� TACOMA 2S3.272.3USs J� 66 E 6 RTU 621 Pacific Avenue Suite 104 FROM RTU PUMP CALL PUMP PUMP PUMP PUMP (24 VDC) OVERTEMP SEAL FAIL RUN FAIL SCALE: SHOWN COIL PUMP FAIL CONDUCTORS 0 1" 2" IN BOTTOM OF "RTU" DRAWING IS NOT TO SCALE DIAGRAM 1: PUMP P-1 P-2 IF BAR IS NOT 2" LONG RECORD DRAWING PLOT: 1 DWG NO. NO SCALE REVISED TO CONFORM ENGINEER: CCA E08 SM3628 13 TO CON§TRUCTION RECORDS REVIEWED: MLM DATE: Jul 15, 2013 SHEET N0. 6C,71/� 04/25/12 J RH2 RING INC. DATE CLIENT: REN l REVISED TO CONFORM TO CONSTRUCTION RECORDS AHF EH 04/25/13 JOB NO.: 112-033 17 NO. REVISION BY REVIEW DATE FLENAMF: LIBHS-D-EO8.DWG