Loading...
HomeMy WebLinkAboutWWP2703636.2N o N o z a d' r N v J CD o Z N }wLU �o % � � N uy � fn oo Q 0 Z:) - 0) N m od���th CD u1 = v 0 Za¢W W Z) Vww��o z�=� Ln Z w m m m� mn p� z< z z a� �a �z wo c z O w . z N Z < - 0 V N w O Z Z II - =oc� V Z - z N S Of L� n .. O Y z y > > 3 V 0 < = a a < Cf D' N N W N O N N O O Lw Lw � W W m � 7 (n =: Z 4 Ld z O O cn U w � tY Q U - Of - DO ti3 - D cn � Z O J W N .- Z. Z RECESSED LIFT POCKET " - 11 N.C. SOCKET HD 2" A. C. 2'-0 " SCREW 1 " LONG I Ya �� (BRONZE OR S.S.) I ( � i 7¢" x 2" RAISED PADS 6" CONCRETE 'CLASS 3000 SANDOR EXPANDABLE FOAM 12 Ya 14 WATER TIGHT PLUG I 5 2 4 5- 1 8 BEND _ 7�" 3� 1 Y. 74` ( 2., 5%" f 4v 1 Ya" 8„ 1 �P\� 12 Ya" 14" J� CAST IRON RING AND COVER �'� P PIPE MATERIAL AS SPECIFIED BY THE ENGINEER; - 45' (1/8) BEND NOTES: 1. 8" AND 6" CLEANOUTS ON SEWER MAINS SHALL BE EAST JORDAN _IRON WORKS, INC. No. 3698 OR EQUAL. CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY. 2. IN UNIMPROVED AREAS, POUR A 1'-0" THICK; 2'-0" SQUARE CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER. r. PUBLIC WORKS �`•` '� DEPARTMENT 8 OR 6 INCH CLEAN -OUT FOR SANITARY SEWER MAINS STD. PLAN - 403.1 - _ SEPTEMBER. 2011- PROPERTY LINE z FUTURE r-TEE UILDING SEWER PIPE 1 BUILDING SEWER W. Iz`2 x 4' STUD MARKING POST PAINTED H 6" SIDE OUTLET J 6"X6 X6" WYE WHITE WITH THE WORD "SEWER" STENCILED > SURFACE CLEANOUT WITH Of CAST IRON RING &COVER IN 3 HIGH BLACK LETTERS AND #6 WIRE w WRAPPED AROUND THE STUD AND ao (EAST JORDAN IRON WORKS EXTENDED TO THE TOP OF THE STUD. a' 2975 OR APPROVED EQUAL, a SPECIFY "SEWER" ON LID, 6" SIDE SEWER AND BUILDING SEWER SEE STD. PLAN 403.1 FOR INSTALLATION) ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO MAIN` LINES ARE AS FOLLOWS: A. VITRIFIED CLAY MAIN - CUT IN A NEW TEE USING FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). B. CONCRETE MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL). C. PVC MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) OR CUT IN A NEW TEE USING RIGID COUPLINGS. D. DUCTILE IRON MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) E. MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK -OUTS OR THE STRUCTURE SHALL BE CORE -DRILLED. 60" ALLOWABLE MAX. FOR 'CAST IRON PIPE OR DUCTILE `IRON PIPE. 1:3:5 MIX ph � CONCRETE -�.• PNGOG�\NG BLOCKING7, SAP 25 4giSEWER- 6"1 ,• ` _ 'G�N _2% MIN. SLOPE HORIZONTAL 6 SIDE OUTLET TEE MIN. MAIN SEWER MAIN CONCRFTF BLOCKING ANGLE TYPICAL SIDE SEWER ELEVATION OF TEE AT MAIN OVER 25 ELEVATION NOTE: UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM' 2.5' COVER AT PROPERTY LINE OR 3-5' rLOWER THAN THE -LOWEST HOUSE ELEVATION, `WHICHEVER IS LOWER. s/ � PUBLIC WORKS STANDARD, SIDE SEWER STD. PLAN - 406.1 DEPARTMENT INSTALLATION -�" (SEWER MAIN TO PROPERTY LINE) SEPTEMBER 2011 7' 1 NOT TO SCALE MANHOLE FRAME AND COVER SEE STD. PLAN 401 ADJUSTMENT RINGS (2" MIN.) SEE NOTE 6 MORTAR JOINT(S) ' (3/8" 'MIN.) SEE NOTE 5 CONE (ECCENTRIC) RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C-443 STEPS - POLYPROPYLENE STEPS SHALL BE INCLUDED CONCRETE RISER BY PIPE INC., OR APPROVED EQUAL. LADDER -POLYPROPYLENE SHALL BE ATTACHED TO MANHOLE MAX. PIPE SIZE - 'E' CONCRETE SHELF PRECAST BASE SECTION OR CAST IN SHELF. 'A' 'B' 'C' 'D' 'E' 48" MH 48" 6" MIN. 5"MIN 24" MIN. 21" I.D. 54" MH 54" 8" MIN. 5.5" MIN. 24" MIN. 24" LD. 60" MH 60" I 8" MIN. 6" MIN. 42" MIN. 30" I.D. NOTES: 1. STEPS TO BE POLYPROPYLENE SAFETY STEPS. 2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED. 3. CASTING SHALL BE PER STD. PLAN 401. 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE. 5. ALL JOINTS BETWEEN THE CONE, RISER RINGS, BRICKS AND CASTING SHALL BE GROUTED. 6. ADJUSTMENT OF THE CASTING TO GRADE SHALL BE ACCOMPLISHED WITH A COMBINATION OF ADJUSTMENT RINGS, BRICKS AND MORTAR ONLY. BRICKS SHALL BE STAGGERED TO CREATE A RUNNING BOND OR 1/2 BOND. THE USE OF SHIMS 15 PROHIBITED, 7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC-AROSHIELD OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. 8. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C-443. 9. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 OF THE INSIDE DIAMETER OF THE LARGEST PIPE. 10. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR-N-SEAL BOOTS OR APPROVED EQUAL, 11. IN UNIMPROVED AREAS, MANHOLES SHALL EXTEND A MINIMUM OF 6" AND A MAXIMUM Of' 12" ABOVE FINISHED GRADE OR MUST HAVE A MINIMUM 2' DIAMETER CONCRETE RINGS POURED AT GRADE. IN PAVED AREAS, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. �o STD. PLAN - 400.1 PUBLIC WORKS STANDARD SANITARY MANHOLE - -`�� -' DEPARTMENT SEPTEMBER 2011 BC]LTHDLES - 3 PLCS EQUALLY SPACED 120° APART ON 23 1/16' (586mm) DIA B.C. (SEE DETAIL) �� L� � COVER BOTTOM VIEW COVER & FRAME PLAN VIEW 15' DIA, C635mm] 1 r(3) BLT SDC, (ALLEN HEAD) 3/4' 125MMI \ 5/ RUBBERX AS SS � BBEWASHER C19mm] I ---��8 ,3/4' L_ 2 1/2' [222mml 164mm3 TYP COVER SECTION VIEW EON BOLTING DETAIL 26 1/2' DIA _ C673mm] 25 1/4' DIA 1641mm]-,I 1 1/16' "' C6mm] r 1 1/16' 1/4' (6mm) DIA 127mm] -'_t C27mm7 �NEEIPRENE GASKET 6� C3mm] f Cls2mm7 It CR3mml 16MM5/8' 23 3/6' DIA cL OPEN GASKET GROOVE DETAIL C16mm] C594mm] 27 5/16' DIA C694mm3 34 1/8' DIA C867mm7 NOTES: FRAME SECTION VIEW 1. ALL COVERS SHALL BE LOCKING LID PER EAST JORDAN IRON WORKS INC. No. 3717C1 OR EQUAL_ 2. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER), SANITARY, (SPECIFY 'SEWER"), OR WATER (SPECIFY -WATER"). STD. PLAN - 401 �► PUBLIC WORKS MANHOLE FRAME AND COVER DEPARTMENT F� �o DECEMBER 2008 {-- W (SEE NOTE 4) — LIMITS OF PIPE ZONE f BEDDING MATERIAL FOR SANITARY SEWER PIPE O.D. OF PIPE (SEE NOTE 6) 0 FOUNDATION LEVEL i i BEDDING FOR SANITARY SEWER PIPE NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. ,COMPACT BEDDING MATE RIA'_ TO 95% MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY SEWER SECTION OF THE STANDARD SPECIFICATIONS FOR TRENCH WIDTH "W" AND TRENCHING OPTIONS. THE PIPE ZONE WILL BE THE ACTUAL TRENCH WIDTH. 5. TRENCH BACKFILL SHALL CONFORM TO "BACKFILLING" IN THE SANITARY SEWER SECTION OF THE STANDARD SPECIFICATIONS, EXCEPT THAT ROCKS OR LUMPS LARGER THAN 1" PER FOOT OF PIPE DIAMETER SHALL NOT BE USED IN THE BACKFILL MATERIAL. 6. PIPE ZONE MATERIAL SHALL BE "GRAVEL BACKFILL FOR DRAINS" AS SPECIFIED IN THE AGGREGATES SECTION OF THE STANDARD SPECIFICATIONS. 7. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED. .i PUBLIC WORKS PIPE BEDDING STD. PLAN - 405 * DEPARTMENT FOR SANITARY SEWERS MARCH 2O08 S=363607 Sm3 63 602 RECOMMENDED ;FOR APPROVAL BY BY BY CHECKED FOR COMPLIANCE TO CITY STANDARDS DATE DATE DATE Call before you ®j g. 1-800-424-5555 AVOID CUTTING UNDERGROUND UTILITY LINES. IT'S COSTLY s t f I Q 38285 p . A FGISTE�� C NOTE: EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDER- GROUND UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION, CALL BEFORE YOU DIG: 1-800-424-5555 UNDERGROUND SERVICE (USA) Y:Wobs (J)\10\10593 MADISON PLACE\10593 CAD\dwg\1673-028-ENG.dwg 09/19/11 01:47:26 PM PUT