HomeMy WebLinkAboutWWP2703690.2TOWNSHIP 23 N, RANGE 5 E, W.M..
FBROOKDIV H
w
Q
z
1-
L
0
ry
�'
Call 2 Working Days Before You Dig
811
Utilities Underground Location Center
(ID,MT,ND,OR,WA)
C
45 32
- 61tWTsr�� c~~
ON,
17*]m&w)mS
520
® ' s 500
AD
LF 8pvc
"_ I SSMH_ 1
RIM 508.05 r t%:. + 6 AS
8" lE (OUT) 499.95- 4sy.7r AS
7• 45
(NEW) .494• I3 AG
iD (EX. ) 4044. 64 AS
-2m
IENUE SE
I
N
j V_
Ln
Off
Ln
Ln
-n'
'
72+30
72+ 90
VERTICAL DATUM:
NA VD 88 PER CITY OF .RENTON VERTICAL CONTROL
BENCHMARK
73-�-50
74+ 10
1. CITY OF RENTON CONTROL POINT NO. 2103: PUNCHED BRASS PLUG SET IN CONCRETE FLUSH WITH
ROAD SURFACE AT THE INTERSECTION OF SE 128TH STREET AND 156Th1 AVENUE SE AKA THE NORTH
QUARTER CORNER OF .SECTION 14-23-5, ELEVATION = 54794 FEET
2. CITY OF RENTON CONTROL POINT NO. 1909: CONCRETE MONUMENT WITH TACK IN LEAD PLUG AT
THE INTERSECTION OF SE, 139TH ST AND 156TH AVENUE SE., ELEVATION = 37234 FEET
BASIS OF BEARINGS.
N0029'00'E BETWEEN THE MONUMENTS FOUND IN PLACE AT THE .SOUTH AND NORTH QUARTER
CORNERS OF SECTION 14-23-5 PER REF. 2
D.R. STRONG
CONSUL TING ENGINEERS
ENGINEERS PLANNERS SURVEYORS
620 7TH AVENUE KIRKLAND, WA 98033
0425.8273063 F 425.827.2423
1 I MYLARS
N0.
REVISION
MN 08.28.13 MN SURVEYED�: �
DESIGNED:
.7V5
MAJ
DRAWN:
CWA
CHECKED
MAJ
BY DATE APPR ARPROVED:
Mm
74-1- 70
75+30
S=369006
(A r Y/ ' A
l�M1I1A�1� /
SCALE.
VERTICAL NAVD 1988
�= CITY 0 E
AS NOTED HORIZONTAL: NAD 1983/83/1991
RENTON
ONE INCH
AT FULL SGAI-E DATUM Planning/Building/Public Works Dept.
IF NOT ONE INCH
SCALE ACCORDINGLY
GRAPHIC SCALE
0 15 30 60
1 INCH = 30 FT.
HORIZONTAL
0 5 10 20
1INCH =10FT
VERTICAL
RECOMMENDED FOR APPOVAL
BY- X.L_" 044' Date:
A#
BY: Date:
BY: _ — — Date:
BYDate:
SADDLEBROOK DID/. II
08.08.13
PAGE
SEWER EXTENSION PROFILE DRAWING N0:
SS2
SHEET: 14 ��F: 14
1AHNINININIA10\1
d
� C7
x�
1
0
o m0
CIO P
and
1