Loading...
HomeMy WebLinkAboutWWP2703712.12CV co O I CV ICI ■lE Z J 0 50 100 Scale in Feet T 1. FOR MANHOLE AND PAVEMENT RESTORATION; SEE DETAIL 1/-�- • I SMH 2019 Ith Vqm TIM EXISTING SIDE SEWER TO i NORTH WAS CAPPED AND NOT REINSTATED TYP 2 24" CIPP SS 4! a 0 0 ems. a� Aw ;*A IL µin �it� BNSF PREMISES: WORK SHALL COMPLY WITH THE PROJECT'S BNSF TEMPORARY OCCUPANCY PERMIT AND THE REQUIREMENTS NOTED ON THESE PLANS AND IN THE SPECIFICATIONS, SEE NOTE 4. SMH SMH 6551 1170 FT � 1968, rani a 0 4 Tr 4 • NOTES: 1. CONTRACTOR SHALL PREPARE AND SUBMIT FOR REVIEW AND APPROVAL A TRAFFIC CONTROL PLAN SEE DWG C-1 FOR FOR WORK IN N 4TH ST. THE TRAFFIC CONTROL PLAN REPLACEMENT SHALL BE APPROVED BE THE ENGINEER PRIOR TO REQUIREMENTS BEGINNING ANY WORK IN N 4TH ST AND BE IN ACCORDANCE WITH THE CITY APPROVED ROW 1 PERMIT TO BE OBTAINED BY THE CONTRACTOR, 2. SEE SPECIAL PROVISIONS SECTION 7-27 FOR TEMPORARY SEWER BYPASS PUMPING/SYSTEMS REQUIREMENTS. 3. EROSION CONTROL MEASURES SHALL BE PROVIDED/IMPLIMENTED AS READ AND APPROPRIATE IN ACCORDANCE WITH THE EROSION CONTROL NOTES ON DWG G-2 AND APPLICABLE CITY OF RENTON STD PLANS. 4, SEE GENERAL BNSF NOTES AND REQUIREMENTS ON DWG G-2. 5. SEE SPECIAL PROVISIONS SECTION 1-08.13 FOR SPECIFIC WORK CONSTRAINTS. SCHEDULE - CURED IN PLACE PIPE FOR SANITARY SEWER STREET UPSTREAM APPROX DEPTH TO MANHOLE PIPE INVERT DOWNSTREAM MANHOLE APPROX DEPTH TO 1 EXISTING PIPE PIPE INVERT I MATERIAL APPROX # I APPROX j PIPE SIZE RUN LENGTH I LATERALS TO _. REINSTATE N 4TH ST 1968 11.3 FT j 1967 I 4.8 FT VITRIFIED CLAY 24" 456 FT— 2 I I N 4TH ST t 1967 I 4.8 FT I i 2019 i 5.6 FT VITRIFIED CLAY I I 2411 203 FT --� — - TOTAL 24" 659 FT 3 SCHEDULE NOTE: 1, SMH 6551 WAS INSTALLED BY OTHERS PRIOR TO CIPP INSTALLATION AS PART OF ANOTHER PROJECT AND IS NOT SHOWN ON THIS SCHEDULE. BHC Consultants, LLC Mb 1601 Fifth Avenue, Suite 500 . Seattle, Washington 98101 206.505.3400 CONSUL.4 i %j 206.505.3406 (fax) SEATTLE TACOMA www.bhcconsultants.com CIPP PLAN AND SCHEDULE PLAN J1 SCALE ORIGINAL ORIGINAL SEALED BY: SEALED BY: TYLER JAMES WHITEHOUSE JEFFREY S. KRESHEL 5/14/15 5/14/15 49545 32796 — SURVEYED: -- -- K P G DESIGNED: T. WHITEHOUSE, P.E. Z RECORD DRAWING TJW 12/2016 RAID DAP SIMON ISSUED FOR BID TJW 05/2015 JSK CHECKED: J. KRESHEL, P.E. NO. REVISION BY DATE APPR APPROVED: R. DORN, P.E. REPLACE TYPE C TRAFFIC CURB TO MATCH EX PER RENTON STD PLAN H007 I RECORD DRAWING These record drawings have been prepared based on construction records and as -built information provided by the contractor and others. BHC Consultants, LLC has not verified the accuracy and/or completeness of this information. SCALE: HL ORIZONTANAD NAVC AS NOTED 19a3/1991 \1 ONE INCH DATUM AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY - CITY OF RENTON public Works Dept. CONSTRUCTION NOTES: NEW SMH 1968 SHALL BE INSTALLED PRIOR TO BEGINNING CIPP WORK. SEE GENERAL CONSTRUCTION SEOLIENCE NOTES ON DWG G-2, O2 QUANTITY; LOCATION AND DEPTH OF EXISTING SIDE SEWERS ARE UNKNOWN. SIDE SEWERS SHOWN FOR ILLUSTRATION PURPOSES ONLY. CONTRACTOR SHALL FIELD LOCATE EXISTING SIDE SEWERS AND RESTORE SERVICE CONNECTION AFTER INSTALLATION OF CIPP AS SPECIFIED. REMOVE 72" DIA MANHOLE TOP FOR INSTALLATION OF CIPP. REINSTALL AND ROTATE APPROX 1350 CCW AS APPROVED BY THE CITY IN THE FIELD REPLACE YELL PAVEMENT MA TO MATCH EX PROTECT EX UTILITY COVER, REINSTALL TO MATCH EX AS REQD REPLACE CHANNELIZATION MARKERS PER RENTON STD PLANS H007 AND 109.1 REMOVE AND REPLACE 4 CONIC PANELS PER RENTON STD PLAN 111, APPROX SIZE=10'x10'x12" THICK EACH PANEL MANHOLE AND PAVEMENT RESTORATION (LOOKING WEST) DETAIL N S S=371206 Call 48 Hours Before You Dig CENTRAL RENTON SEWER INTERCEPTOR RELINE & UPSIZE PROJECT SEWER RELINE PLAN & DETAILS 1-800-424-5555 JNDERGROUND SERVICE DATE- MAY 2015 I FIELDHOOK: PAGE- i DRAWING NC: r, 7 .`._� SHEET C, 6 6 D zITI f"1 YJ o C >�T - p mLfl U1 a Nz m z z M C,0 0 D Cn D n O M O Mo C MN m D �z 71 z* c �_ M° m- UK rU z z Nm O D a D //z� Y� C co M z r- 7 YG o O zU A 7i m D o 0 M °C TI m