HomeMy WebLinkAboutTED4003721.3EROSION CONTROL NOTES
1. THESE NOTES SHALL APPEAR FOR PROJECTS - SITE IMPROVEMENTS, SURFACE
WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
N 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
OPRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON,
C) PUBLIC WORKS DESIGN ENGINEER.
T- 3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION
AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING
IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION
PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMTS SHALL BE PERMITTED. THE CLEARING
LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION
U) 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINING OF CONSTRUCTION
W AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
I-_ CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL
Q PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR
II-_ FOR THE DURATION OF THE PROJECT.
U) 5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN
LL.I OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION
AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
W THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS
PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/
SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITTEE.
Z 6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE
0 INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONITIONS DICTATE, THE PERMITEE
0 SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE
Z NECESSARY TO INSURE COMPLETE SILTATION CONTROL ON THE PROPSED SITE. DURING THE
= COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE
U) TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECIEVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT
LJJ CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS,
CHANNELS, OR RETENTION FACILITIES.
J 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE
DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST — MARCH 30TH) OR
SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST — SEPTEMBER 30TH) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ERC COVER METHODS (e.g. SEEDING,
MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL
CONSTRUCTION SITES CLEARING BEWTEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS
OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX "D" OF THE SURFACE
WATER DESIGN MANUAL.
11. ANY AREA NEEDING ERC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12. THE ERC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT —LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST — MARCH 30TH, ALL PROJECT DISTURBED SOIL AREAS,
THAT ARE TO BE LEFT UN —WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED
BY MULCH, SODDING, OR PLASTIC COVERING. /
15. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL
BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE
STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES
ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
16. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE
REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS.
DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED
SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
i
WI
LOT Rio
Z
IL Uj
LOT
TOP OF WALL 0Iw
ELEV. (TW) I m
1 I
6
12' MIN, THICKNESS
2'-4' QUARRY SPALLS
x
Q
GRAVEL BACKFILL
00 FOR DRAINS
v
BOTTOM OF WALL
ELEV. (BW)
I
KEYWAY-/ PERFORATED PIPE 4' MIN,
FILTER FABRIC
TYPICAL ROCKERY PROPERTY LINE DETAIL
N.T.S.
OFFE ENGINEERS
13932 SOUTHEAST 159TH PLACE
RENTON, WASHINGTON 98058
PHONE: 425-260-3412
CONTACT: DARRELL OFFE, P.E.
as ti A�
z'
27460 °
�o�F STER�� G�
03/18/2014N0.
TW =
48• _
F —4 r
SSW— 0.0
.; 48 /1
'4 1�
��'V •� xxu, i d hr v +� I i l l TW=57 0 I i �! + I �< p _--- �� 1'-,J
DIRT=51.0 I O�it,an
f —
• _ s I
_ _
_ • sue. ` J _����► , .
.����o �•••_••��`. ;off f
, I
NOTE:
EXISTING UTILITY L❑CATIONS SHOWN HEREON ARE
APPROXIMATE ONLY, IT SHALL BE THE CONTRACTOR'S
RESP❑NSIBILITY TO DETERMINE THE EXACT VERTICAL AND
H❑RIZ❑NTAL L❑CATI❑N OF ALL EXISTING UNDERGROUND
UTILIITES PRIOR TO C❑MMENCING CONSTRUCTI❑N. NO
REPRESENTATI❑N IS MADE THAT ALL EXISTING UTILITIES
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO
RESP❑NSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES
NOT SHOWN IN THEIR PROPER L❑CATI❑N,
CALL BEFORE YOU DIG, 1-800-424-5555
WALL BLVCq
f imf►rr R m'D
WALLS TO BE DESIGNED BY GEOTECHNICAL ENGINEER
AND INSTALLED UNDER SEPARATE BUILDING PERMIT
(TYPICAL ON WALLS OVER 4' (48") IN HIEGHT)
LEGEND
TW= ELEVATION AT TOP OF WALL
DIRT= ELEVATION AT DIRT GRADE (TOP OR BOTTOM)
ACK
R=372103 S/W FINIS EDTI PAD ELEBVATIOOF SIDEWALK
E PROPOSED LOT NUMBER
**-WALLS SHOWN
IN EXCESS OF 4'(48")
HIEGHT ARE RERQUIRED TO
OBTAIN SEPARATE
BUILDING PERMIT
FROM
THE CITY OF RENTON
Sri
GRAPHIC SCALE
0 15 30 60
1 inch = 30 feet
RECOMMENDED FOR APPROVAL
IF
By Date,
Date,
By, Date,
By, Date,
SURVEYED:
US SURVEYE° � SCALE HORIZONTAL- NAD 1983/1991 ;; CITY 01 LAKE WASHINGTON VIEW ESTATES 10/15/2012
DESIGNED: FIELDRM
D.L. OFFE, P.E. RENTON
GREG FAWCETT
PAGE:
DRAWN: D.L. OFFE, P.E. GRADING PLAN
ONE INCHDATUM DRAINING No.
CHECKED: AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY S11EET. 3 OR 13