Loading...
HomeMy WebLinkAboutTRO4103732.2NE 114, NW .114, SEC.14, TWP..23N., RGE: 5E., W.M. R 3 I � 3 -- - -_.._--i---..-----®- 8 310 3 2 I I --- - 31f 0 R W i `'-- 3 3+ CEO 3+00 NE 2 LANE — ► / r° - _; - _ A3,�� --wa E 2 3 — R1N _ > f Q I 3 I I ILLUMINATION CONSTRUCTION NOTES 2 GENERAL NOTES _ I i 1 INSTALL FOUNDATION, POLE, LUMINAIRE, AND JUNCTION BOX PER ILLUMINATION --�- Q W 3 5 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF POLE SCHEDULE, SHEET IL1.1, AND PER CITY OF RENTON STD PLANS 115, 119, 3 _ THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSDOTIAPWA 120, 121, & J013. W STANDARDS AND SPECIFICATIONS. A SET OF APPROVED PLANS SHALL BE KEPT ON -SITE AT ALL TIMES DURING CONSTRUCTION. INSTALL FOUNDATION, POLE, LUMINAIRE, AND JUNCTION BOX PER ILLUMINATION (2)POLE SCHEDULE, SHEET IL1.1, AND PER CITY OF RENTON STD PLANS 116.1, 119, 2. THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE LIMITED TO 8:30 AM TO 3:30 P.M. 120, & 121. I I ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS. I I CLOSURES PARTIAL OR FULL SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC CONSTRUCT SERVICE CABINET FOUNDATION PER CITY OF RENTON STD PLAN 126.1. 2 Cc ALL STREET I FURNISH AND INSTALL SERVICE CABINET PER CITY OF RENTON STD PLAN 122.1 & '=L WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, FIRE DEPARTMENT, AND 911 SHALL BE 13 NOTIFIED 24 HOURS IN ADVANCE. 123. LOCATION AND ORIENTATION OF FOUNDATION AND CABINET SHALL BE Q� VERIFIED BY CITY OF RENTON INSPECTOR PRIOR TO INSTALLATION OF CONDUITS. 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE 041EXISTING STREET LIGHT POLE TO REMAIN.3CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID+ 1 i DAMAGE OR DISTURBANCE. FOR UTILITY LOCATE CALL 48-HOUR LOCATORS, 1-800--424-5555. POWER SOURCE CONNECTION POINT UNKNOWN AT THE TIME OF PLAN 3 I "' I 4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING 5 )PREPARATION. CONTRACTOR SHALL COORDINATE WITH PSE FOR SPECIFIC NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY REQUIREMENTS. PSE TO PROVIDE 1201240 VOLT SINGLE PHASE POWER SOURCE. SERVICE ELECTRICAL I CONTRACTOR SHALL COORDINATE WITH PSE FOR SER €CABIN T E EL TR CAL PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A (� iFr �= REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HOOK-UP, SHALL PREPARE/SUBMIT ALL APPLICABLE PERMITS, AND SHALL PAY NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. ALL ASSOCIATED FEES. , WATCH LINE STA 0+50 SEE SKEET IL 1 ILLUMINATION LEGEND j EXISTING NEW DESCRIPTION JUNCTION BOX TYPE 1, 2 STANDARD DAVIT POLE DECORATIVE POLE CONDUIT/CONDUCTOR SERVICE CABINET CONSTRUCTION NOTE LUM. POLE NO. WIRE NOTE 5. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 7. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 8. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. ALL UTILITY TRENCHES SHALL BE BACKFILLED AND COMPACTED TO 95% MAXIMUM DRY DENSITY MODIFIED PROCTOR. 10, THE CONTRACTOR SHALL PROVIDE MATERIALS SUBMITTALS AND POLE SHOP DRAWINGS TO THE CITY OF RENTON FOR APPROVAL AT THE EARLIEST POSSIBLE DATE. 11. AS PART OF THE DESIGN PROCESS, THE ENGINEER HAS ATTEMPTED TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH OVERHEAD POWER LINES OR SUBSURFACE UTILITIES. HOWEVER, IT IS POSSIBLE FOR THE EXISTING OR PROPOSED CONDITIONS TO CHANGE PRIOR TO IMPLEMENTATION OF THE SCOPE OF WORK IDENTIFIED ON THESE DOCUMENTS. AS THE FIRST ORDER OF BUSINESS THE CONTRACTOR SHALL POTHOLE EACH POLE LOCATION TO CONFIRM THAT THERE ARE NOT CONFLICTS WITH SUBSURFACE UTILITIES. ADDITIONALLY, THE CONTRACTOR SHALL CONFIRM THAT THERE IS A MINIMUM 10-FT CLEARANCE PROVIDED BETWEEN OVERHEAD POWER LINES AND THE PROPOSED LUMINAIRE POLES PRIOR TO POLE PLACEMENT. ADDITIONAL CLEARANCE MAY BE REQUIRED AS DIRECTED BY THE UTILITY, THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY IF A CONFLICT IS DISCOVERED, ILLUMINATION WIRING DIAGRAM `11 L�! W Z Z 6 8 10 NE 2 LANE 12 - Q - _ 0 c 5 C) 1< 3 Iq cn SERVICE 13 ILLUM A ILLUM B 1i 2 3 d SE 1 .32ND ST ,NOT TO SCALE 2 3 MATCH LINE STA 20+75 SEE SHEET !L 1 T=373202 SERVICE BREAKER SCHEDULE CIRCUIT BREAKER CONTACTOR MAIN 2P-100 AMP --- ILLUM A 2P-20 AMP 30 AMP ILLUM B 7 2P-20 AMP 30 AMP 10 40 0 20 60 SCALE IN FEET A r V Id : L I w VTEIN TtOn,,pitI,:hot llEiigill svPlPi 1 'r1eO rrcarrsr �rtatirx� PI r �iru, � t=� � I �°at!ic IrnF �� t_��rtr}ieirs b O bhp d z r� o dy Y V�/ ('V,--), -T-- -!5'7 3�'Ic,