Loading...
HomeMy WebLinkAboutTED4003762.8W Q z Ld 0 Of Cal 2 Working [)aye EWore You Dig 811 UNUm Underground Location Center (D,Wr,ND,OR,WA) ®CONSULTING 34400 8th Avenue South ENGINEERS L L C Suite 205 (® ( ' Federal Way, WA 98003 FEnQ+AE WAY (zsa) a38-41 u www.esmcivil.com EVERETT (425) 297-9900 D-I.ENSBURG (509) 962-2W8 Civil Engineering Land Surveying Land Planning Public Works I Project Management I Landscape Architecture ESM JOB #1670-003-013 1 �51 0M�Q S�O1N�L E� u� 0 FIRST SUBMITTAL ESM 03/28/14 SURVEYED: SCALE: 1 SECOND SUBMITTAL ESM 06 05 14 DESIGNED: LGB 2 THIRD SUBMITTAL ESM 07/17/14 3 MYLAR SUBMITTAL ESM 08/18/14 DRAWN: CJR I CHECKED: I — i0. REVISION BY DATE APPR APPROVED. SCALE: 1 " = 40' 9.24•zo'`F a,_ -- 4 x LEGEND SD PROPOSED STORM DRAIN PROPOSED SANITARY SEWER w PROPOSED WATER MAIN STORM NOTES: 1. SINGLE FAMILY RESIDENCES AND OTHER IMPROVEMENTS CONSTRUCTED ON LOTS CREATED BY THIS SUBDIVISION MUST IMPLEMENT FLOW CONTROL BMPS, UNLESS CONSTRUCTED AS PART OF THIS SUBDIVISION. COMPLIANCE WITH THIS REQUIREMENT WILL BE ADDRESSED IN THE DRAINAGE PLAN SUBMITTED FOR RESIDENTIAL BUILDING PERMIT DRAINAGE REVIEW WHEN APPLICATION IS MADE FOR A SINGLE FAMILY RESIDENTIAL BUILDING PERMIT FOR EACH LOT. 2. FLOW CONTROL BMPS CONSTRUCTED ON THE LOTS SHALL BE OPERATED MAINTAINED AND KEPT IN GOOD REPAIR BY EACH LOT OWNER. 3. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER THE FOLLOWING PROCEDURE: A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION PLANS. B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQURIED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. 8. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. W=376201 R=376208 S=376201 CHECKED FOR COMPLIANCE TO CITY STANDARDS - p p r� VERTICAL: NAVD 1988 08 1 8 2 0 1 4 1 "_40> HORIZONTAL: NAD 1983/1991 ,� CITY OF RYL E E S PLACE OO/ FIELDBOOK; R E N TO N STORM DRAINAGE KEY MAP PAGE. �_ ONE INCH DATUM & COMPOSITE UTILITY PLAN DRAWING N0: I T FULL sPlanning/Building/Public Works Dept. KEY —SD IF NOT ONE INCH SCALE ACCORDINGLY SHEET: 8 OF:21 C .... f C CD = CD 0 C D 01 LTI a)Nz m Z m m m 0 D N o � u `TJ z CD �C :vim 1 CD o icy 0000 oo > 1 m N NQ..