HomeMy WebLinkAboutTED4003772.3Approved By;
Date:
Ir
O
n
2
I-
O
W
Q
J
W
O
W
CONNECTION TO EXISTING
12" WATER MAIN
-
i1nn — llW11 —
M M M I M
tzNEW FIRE HYDRANT
(REPLACEMENT OF EX
R
- _ I FIRE HYDRANT)
E
CUTUNE OF HOTEL ;
SHOWN FOR REFERENCE ONLY ~ ti
\ 4.
Ln NEW LOT LINE \ ~_
d-- M "'��C -�
---- --d- -� J
f GAS
in -
a �
cc)
o r
r �
1
1 �J
l
'I Ln
NEW 12" WATER LOOP
I-- LIMIT —j \
PSE DRAINAGE BY-PASS LINE v, EXISTII�VFIRE HYDRANT
Approved BY:.
Approved By:.
Approved By:_
Date: --
Date:
Date:
Call before you
or 1-800-424-5555
Djg.8-1-1
F, Ar UNDERGROUND
SERVICE (USA)
Mechanical and Restrained Joint Water Fittings
ALL MECHANICAL JOINT (MJ) BENDS AND TEES SHALL HAVE 'MEGA -LUG' RETAINING GLANDS IN ADDITION TO CONCRETE
BLOCKING. ALL OTHER MECHANICAL JOINT FITTINGS (VALVES, SLEEVES, ETC) SHALL HAVE 'MEGA -LUG' RETAINING GLANDS.
ALL OTHER MECHANICAL JOINT FITTINGS (VALVES, SLEEVES, ETC) SHALL HAVE 'MEGA -LUG' RETAINING GLANDS.
ALL DUCTILE IRON PIPE BELLS/JOINTS SHALL BE RESTRAINED WITH RESTRAINT HARNESS EQUAL TO MEGALUG SERIES 1700
OR ROMAC SERIES 600.
CONTRACTOR SHALL TV THE CONSTRUCTED STORM PIPE SYSTEM
AND PROVIDE TO CITY INSPECTOR PRIOR TO APPROVAL
S=37720 i
cn n \
O
a_ \
1
J
I
/ I EXISTING FIRE HYDRANT \
x
---- --� ---- �wS-; - - Q6�nM----rr G-d- d I
W W W W W- , d
1 IAAIT — --lIMI aS _ — Ll� _ — _ —LIMIT — _ 'il IMIT—
I \
NEW FIRE HYDRANT
L �
J
CONNECTION TO EXISTIP ',
v 12" WATER MAIN
R=377203
CONSTRUCTION RECORD DRAWING L PF� -
This construction record drawing is a copy of a cad file prepared by O i� SURVEYED: SCALE: DATE:
"E` AD 19 THE HOTEL AT SOUTHPORT
COUGHLIN PORTER LUNDEEN and has been edited to reflect field �� `S ,� AS NOTED HORIZONTAL: NAD 1983/1991 �� 6.1.2015
erified invert and rim elevations of the storm, sanitary sewer and water w 0 DESIGNED: �•— CITY OF FlELDBOOK:
main systems. Field verified invert and rim elevations were obtained by Z \ BSB RENTON RENTON WASH INGTON PAGE.
KLB CONSTRUCTION IN APRIL 2017 �j �� 0�7 DRAWN:
The on -site private storm drainage facilities and public/private rivate water and O 3s93s \ SO u T N n ®� T si � o nee r.i ��rnlchT. Inc- LPL ONE INCH J DATUM _ DRAvnNG No:
p g p P +� �� RECORD DRAWINGS 8.10.2017 CHECKED: l
sewers stems were installed in accordance with the approved plans and GISTER �` JNP AT FULL SCALE Planning/Building/Public Works Dept. OVERALL UTILITY PLAN C300-EU
y pp p � OUGHLINPORTERLUNDEEN IF NOT ONE INCH
the documented field revisions and function as intended. OVAL STRUCTURAL CIVIL SEISMIC ENGINEERING NO. REVISION BY DATE APPR APPRdVED: SCALE ACCORDINGLY EARLY UTILITY SHEET: OF:
mom.
o D
"
$�Z
YJ
~c�
z
~W0
C
r �m
z rn-
3
",
A)
z
M
m
M
O
I A
0.
w tli
C
CD
I UD y
I C>
w
o y
�
bd
O
zy
�
tNj
U)
D
-
O
1000
A
c 0
z D N
co
m<
T O