Loading...
HomeMy WebLinkAboutTED4003772.4LU STA 37+00.9 (2.4' LT) RJ W/ THRUST BLOCKING ) STA 36+97.0 (10.0' LT) (1) FIRE HYDRANT ASSEMBLY PER COR STD PLAN 310.1 STA 35+10.3 (2.5' LT) 1) 12"x6" TEE (FL) �2) 12" GATE VALVES (FLxMJ) 1) 6" GATE VALVE (FLxMJ) W/ THRUST BLOCKING STA 35+ 10.3 (11.6' LT) (1) FIRE HYDRANT ASSEMBLY PER COR STD PLAN 310.1 N4654 50 "E "' IC111j I --------------- /�--------------------------------------------------------- -------------- 50+00 / 320 LF 12 DI CL52 (RJ) I 53+50 r r� 15' CITY OF RENTON-J, UTILITY EASEMENT I / 50+50 51 +00 51 +50 N 46 54 50 E - 374.08 52+00 52+50 53+00 _ J 77 21�- /------------------- 7- - �2-------- ------- - - - - - - - - - - - - - - - - - - - STA 50+ 15.1 (1.1 ' LT) - o (1) 12 45' BEND (RJ) o / W/ THRUST BLOCKING 15' CITY OF RENTON r � UTILITY EASEMENT I 25 LF 12" DI CL52 (RJ) ,- _ _ - 1 STA 36+97.0 (2.4' LT) - _._ - - STA 53+35.7 (1.3 LT) 1 12"x6" TEE FL CONNECT TO EX 12 TEE (MJ) 1 12" GATE VALVE (FLXMJ FUTURE BUILDING ONLY) FOOTPRINT PER CDR STD PLAN 300.5 I 1 12" ADAPTER (FLXMJ) ) (FOR REFERENCE ONLY) I 1 6" GATE VALVE (FLxMJ) t I I I W/ THRUST BLOCKING o r - - i -( STA 53+37.0 12.9 RT Ic.� I I I �-- 1,..-[-- �� ;=-�-.-- (1) FIRE HYDRANT ASSEMBLY I I I r:; I i I 4 PER COR STD PLAN 310.1 -- -- - = - CONNECT TO EX 6" WATER �+ I I N cv I -- __ - Ll ' L� SOLD LOT LINE lti�l I( I iu �; Ll �I II E o - 00 - t - II I - o CN FUTURE BUILDING FOOTINGS I i I I FOR REFERENCE ONLY I � 4 ; `--t--' I I i I ,!� i 7 3 `L p I [ € f f I ' v F - - I =_ CD CV J u) f 1 I I i SEE PSE PLANS FOR DETAILS I SEE ELEC LPLANS ao I I PSE VAULT J03 I I PRIMARY POWER POC v v 1 I ( I -_ - I 'l I APPROX LOCATION OF TEMP POWER TRANSFORMER J I \ o I (PSE V01) -- - o j o+ I i jrOLD LOT LINE \ j a i �I STA 34+79.7 (8.4 RT) 4%2" TEE I \ 1} 1 \ FUTURE BUILDING FOOTINGS v (FOR REFERENCE ONLY) o I \ CD T I 4" GAS MAIN \ CONOIT VERTICAL BEND TO Approved By:. Approved By: Approved By; Approved By: Call before you Djg .8-1-1 or1-800-424-5555 0 10 20 40 UNDERGROUND SERVICE (USA) SCALE 111=20' Existing 12" W Stub Con ractor to Perform and Provide: - All excavation shoring, backfill, trench restoration Temporary steel plates install, form and pour concrete - All materials for City crew to exte-id the rods and connect to exisling valve and to plug the exlsiing valve Remove existing 12" Stub. City crew to install 12" MJ Plug on ex -�- 12" valve City crew will extend shackle rods and connect -f to existing valve with "eye bolts" Date: Date: Date: Date: Is" 'ods concrete Ian block around g pipe and I four (4) 14" e reds with end ers"icon nectors )ck detail eet 5 days curing concrete block 'r 8" Deadman Main Block Detail S=377202 W=377202 CAST -IN -PLACE CONCRETE BOX "' I SEE PSE PLANS \ (DESIGN BUILD) I FOR DETAILS a ROUTE UNDER' FUTURE SLAB " PLUG EX 12 VALVE AND REMOVE INSTALLED ON TOP OF EX TUNNEL 18' STORM PENETRATION I (2) 4" PSE ECD (3)4" COMM o, � WEST WALL OF BOX I QNoon NOON d ■■COMA ■■COM■■�■CO ■■■■COM■■■■COM�i� (2)4" PSE ECD ��-\ 8" DDETAIL MAIN BLOCK TOP OF BOX LID EL=19.04t ��I■W03■■�lu� "COM♦ d d d d d d SEE DETAIL THIS SHEET IE=16.75t (IN)W I I ■ �+sC■■■■COM■■■■COM■■■■COM■■■■COM■■■■COM■■■■COM■■■■COM■■■■COM■� \ BOX TO BE BURIED UNDER I to STA 34+32 (29.5' RT) SEE COMM PLANS FOR CONTINUATION WITHIN BUILDING FOOTPRINT \ STRUCTURAL BACKFILL W/NO j IK ® CENTER OF 444 VAULT SURFACE ACCESS II I: GAS GAS GAS r sQ 0 1' ' 6� SEE SHEET C3.1 I-EU FOR CITY OF RENTON STANDARD WATER DETAILS AND NOTES KEYMAP SCALE: 1 "=400' N 2 LF 18" SD 0 2% MIN I I ■ - PSE# I CB TYPE II-48" I 2" GAS SERVICE \ + p� STA 33+98.1 (8.8' LT) I I COMMUNICATIONS POC NEW LOT LINE W/ SOLID LOCKING LID I I EXISTING TUNNEL SEE PSE PLANS SEE TELECOM PLANS EXISTING TUNNEL DRY -UTILITIES CONDUITS TO CROSS I FOR DETAILS UNDER EXISTING 12-INCH WATER MAIN p. A RIM 21.78 IE 16.88 NE 18" CPEP W/ MINIMUM OF 12-INCHES OF VERTICAL SEPARATION \ IE 16.88 SE 18" CPEPR=377204 ■ ■ \ CONSTRUCTION RECORD DRAWING �,au, MATCHLINE -SEE SHEET C302-EG This construction record drawing is a copy of a cad file prepared by o t SURVEYED: SCALE: DATE: tiw " VERTICAL NAV019� THE HOTEL AT SOUTH PORT 6.1.2015 COUGHLIN PORTER LUNDEEN and has been edited to reflect field � AS NOTED HORIZONTAL- NAD 1983/1991 �� CITY OF verified invert and rim elevations of the storm, sanitary sewer and water 2 04640- DESIGNED: '� RENTON WAS H I N GTO N FlELDBOOK: main systems. Field verified invert and rim elevations were obtained by Z \ DRAWN: RENTON PACE. KLB CONSTRUCTION IN APRIL 2017 W� LPL DRAWING NO: SOU T 14 P U R TE INCH The on -site private storm drainage facilities and public/private rivate water and O 36936 � \ s'er;o v trLarnaFnT, INC.iNcDATUM P g P P .� RECORD DRAWINGS "DAT CHECKED: AT FULL g Plannin Buildin Public Works Dept. UTILITY PLAN - �tsTER `, JNP 9� 9� P C301-EU sewer systems were installed in accordance with the approved plans and >VAi � 8o O U G M I . QO RT E R LU N D E E N APPROVED. C NOT ONE INCH: ov: the documented field revisions and function as intended. J NO. REVISION BYAPPR SCALE ACCORDINGLY EARLY UTILITY STRUCTURAL CIVIL SEISMIC ENGINEERING � D 'gym �c� z s CO 0 C aMM z C) - ul Ul K CTU N m z M a 11 H y W tTj CD CD y oCn N O �1 w z� �1 I �r CD ® vn O O x a z� � D 0 0 M0 0 0 D n - c