Loading...
HomeMy WebLinkAboutTED4003772.6KEYMAP SCALE: 1 "=400' Approved By Approved By: Date: Date: , D �Z cZ z i 000 I r O T TT M Z z O F- rr O 0- 17 - D O W I- Q W F- O W F- MATCHLINE - SEE SHEET - C302 ti ti ti 1 1 1 I' O J W m LWLJ [I DRY -UTILITIES CONDUITS TO CROSS STA 12+90.9 18.3 LT ( ) UNDER NEW 12-INCH WATER MAIN 1 0 CENTER OF PSE VAULT J01 (4)4" COMM ECD W/ MINIMUM OF 12-INCHES W SEE PSE PLANS FOR DETAILS FOR FUTURE OFFICE OF VERTICAL SEPARATION AND RESIDENTIAL BLDGS PSE VAULT NEW GAS VALVE STA 13+06.5 (18.1' LT) SEE PSE PLANS FOR DETAILS z (4)6"1(2)4" PSE ECD @ CENTER OF CONNECT TO EX COMM VAULT U 1 (2)4" PSE ECD 444 VAULT 4" GAS MAIN (z (4)6" PSE ECD (7)4" COMM ECD SEE PSE PLANS I Q 1 15' CITY OF RENTON ■■C FOR DETAILS AS I UTILITY EASEMENT _T S J GAS GAS GAS GAS GAS GAS G GAS GAS GPNSk4GA M■■■■;(�Atias �p u■aC uuGg �i■>�Oiv1 �0�4u�0?.7�■i �QNom �■■�■C_0 % ti■■ ■■�QM_■�■ M�■■■�0�■�■�CDLIPiu.■ u■s� ��5 - d - 2 �5 ci I (23) N46'43'23 E 646.03' STA 12+67.2 (2.8' RT)(CUT-IN) " " 2 12"XGATE VALVES (FLxMJ) 1 6 GATE VALVE (FLxMJ) 10 LF 6" DI (RJ 12" SPOOLLENGTH AS REQ'D) �11) ) 12" COUPLER W/ THRUST BLOCKING SEE SHEET C3.1 I -EU FOR CITY OF RENTON STANDARD WATER DETAILS AND NOTES Ag") Call before you 12 Dgg.8-1-1 / 1 or1-S00-424-5555F'A / UNDERGROUND 0 10 20 40 SERVICE (USA) SCALE 171=20' I Z / PSE DRAINAGE BY-PASS �LINE / / STA 9+73.1 (2.8' RT) / 1 121.x6" TEE (MJxFL) 1 6" GATE VALVE (FLxMJ) 1 6" PLUG (MJ) N W/ THRUST BLOCKING / STA 9+67.7 (2.9' RT) / 1 12"x6" TEE (MJxFL) 1 6" GATE VALVE (FLxMJ) 1 6" PLUG (MJ) W/ THRUST BLOCKING / STA 9+61.0 (2.8' RT) / 1 12" 8" TEE (FL) ti ti 1 8" GATE VALVE (FLxMJ) 24 LF 12"- 1 8" PLUG (MJ) DI CL52 (RJ) 1 12" GATE VALVE (MJ) 1 12" PLUG (MJ)- / W/ THRUST BLOCKING � I PSE#2a CB TYPE I- INTERUPT EX 6 - " CONSTRUCTION RECORD DRAWING This construction record drawing is a copy of a cad file prepared by COUGHLIN PORTER LUNDEEN and has been edited to reflect field verified invert and rim elevations of the storm, sanitary sewer and water (. main systems. Field verified invert and rim elevations were obtained by KLB CONSTRUCTION IN APRIL 2017 The on -site private storm drainage facilities and public/private water and sewer systems were installed in accordance with the approved plans and , the documented field revisions and function as intended. 262 LF 12" DI CL52 (RJ) ----------- 0- (2) 4 PSE ECD STA 12+67.2 (12.4' RT) 6 2 6" PSE ECD (1) FIRE HYDRANT ASSEMBLY c i� fu PER COR STD PLAN 310.1 �' WATER MAIN DEFLECTION HORIZONTAL AND VERTICAL UP TO 1/2 MANUFACTURER'S RECOMMENDATIONS ------MATCHLINSEE SHEET 302 -- ho- I • :,00 (3)4" COMM ECD EXISTING STORM TO BE ABANDONED I 0 (4)6",(2)4" PSE ECD N W ■ J ■ ■ OCD 3; M ■ ■ 4" GAS MAIN W I a o SEE PSE PLANS I LU FOR DETAILS I� I ■ W z I OD STA 11+64.3 (6.7' LT) -� LAI 0 CENTER OF I = a ■ 444 VAULT I U ■ PSE#3 CB TYPE I Q INTERCEPT EX STORM LINE W/ SOLID LOCKING LID RIM 22.0 c� IE 18.69 SW 15" CPEP (2) 12" SLEEVES (MJ) IE 18.59 SE 8" PVC 1 •N W/ MEGALUGS 1 ■ (3)4" COMM ECD (4)6",(2)4" PSE ECD GAS S A n0 ■■■COM■■■■COM■■■■COM ■■■COM■■■■CO ��■COM■■■■COM�'��■COM■■!■COM�■■■ �i�SuCD� AS 10+00 -a--- d - -- --- d -I d - 5 LF 12" DI CL52 (RJ) \ 262 LF 12" DI CL52 (RJ) 'C RIM 21.90 13 LF 15 PSE#2, CB TYPE I I IE 19.00 NE 15" CPEP SD ® 9.6% W/ SOLID LOCKING LID IE 19.00 S 6" PVC RIM 21.95 CONTRACTOR TO VERIFY ELEVATION IE 18.05 NE 15" CPEP OF EX SD PRIOR TO CONSTRUCTION IE 18.20 SW 15" CPEP _ IE 18.00 N 18" CPEP STA 9+97.4 (2.9' RT) 1 12 TEE (FL) 2 12" GATE VALVE (FLxMJ) 1 12" ADAPTER (FLxMJ) W/ THRUST BLOCKING zA 4V 36936 Q. O\ R T 11CO 11111011111 O �Q U T 14 P® r !'I. OUGHLINPORTERLUNDEEN DNAL E� STRUCTURAL CIVIL SEISMIC ENGINEERING STA 10+42.9 (2.9' RT) 1 12"x6" TEE (FL) 1 6" BLIND FLANGE (FL) REMOVE EX 6" GATE VALVE FOR INSTALLATION OF 6" BLIND FLANGE ON TEE) W/ THRUST BLOCKING NO. RECORD DRAWINGS REVISION �169 LF 15" SD @ 0.5- % 111111111M- .IRI EM SURVEYED: DESIGNED: EISB DRAWN: LPL CHECKED: JNP AP P R I APPROVED: CONCRETE RETAINING WALL (UNDER SEPARATE PERMIT) SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY Approved By: Approved By: -CONNECT TO EX GAS SEE PSE PLANS FOR DETAILS --546'52' - J STA 15+29.3 (4.8' RT) 22.00' (2)6" PSE ECD - CONNECT TO EX 12" GATE VALVE E PSE VAULT PV4 PER COR STD PLANS 300.5,310.1 $ CONTRACTOR TO FIELD VERIFY SEE PSE PLANS FOR DETAILS VALVE CONFIGURATION AND LOCATION (2)6" PSE ECD PRIOR TO CONSTRUCTION h PSE VAULT PV3 SEE PSE PLANS FOR DETAILS U�I J O J �I �I _0 .o PSE CONDUIT 'L { -o \dam \ P P P P ■��r� S=377203 VERTICAL: NAVD 1988 HORIZONTAL NAD 1983/1991 DATU M W=377704 CITY OF RENTON Planning/Building/Public Works Dept. Date: Date: R=377206 THE HOTEL AT SOUTH PORT RENTON WASHINGTON UTILITY PLAN - EARLY UTILITY 6.1.2015 PAGE: DRAWING NO: C303-EU i WtTj CD bar CD 1 1 Cn cI l� -j M 00 E. o CD y ( ! 10° M o tz b i O I D T ° O 0 M ��to N O 9 y c m � a Ul Ga