9
SE 128TH ST (KING COUNTY)
E 4TH ST (RENTON)
N) - -
(PRINCIPAL ARTERIAL)
SCALE: 1 ,0
Cd 2 Working Daye Before You Dig
811oi0Wer
(D,MT,PD,OR,WA)
N G t N E E R S L L C
®CONSULTING
0 8th Avenue South
334
1 ® 11014(
Suite 205
Federal Way, WA 98003
FMIEW WAY (253) 113E-6113
www.esmcivii.com
EVERETT (425) 297-9900
ELIENSBURG (509) 962-2608
Civil Engineering
Land Surveying Land Planning
Public Works
I Project Management I Landscape Architecture
ESM
JOB #1799-001-013
■
o
STORM NOTES:
■
■
1.
ALL ONSITE STORM DRAINAGE SYSTEMS WILL BE PRIVATELY MAINTAINED.
a
■
■
#212
;
2.
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER UTILITY.
3.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING
MUST BE HELD BETWEEN THE CITY OF RENTON PLAN REVIEW SECTION AND THE APPLICANT.
■
4.
ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RENTON MUNICIPAL CODE
(RMC), THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
I
'
CONSTRUCTION PREPARED BY WSDO AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS
I
o
AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. IT SHALL BE THE SOLE
1
I
+
RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY
•• I
1
I
:
ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THIS PLANS. ALL
CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
i
5.
APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT CONSTITUTE AN
■
■
APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER
■
I
■
CONVEYANCE, GAS, ELECTRICAL. ETC.)THE SURFACE WATER DRAINAGE SYSTEM SHALL BE
CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE IN WITH THE CITY. ANY
DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF
RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
■
i
�+ •
■
■
I
6.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN
PROGRESS.
■
I
o
■
'
7.
GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7 P.M. MONDAY
THROUGH SATURDAY AND NO WORK ON SUNDAY IS ALLOWED, UNLESS OTHERWISE APPROVED WITH
ROAD
1 I
A I
5479
A WRITTEN DECISION BY THE CITY OF RENTON.
8.
IT SHALL BE THE APPLICANT'S / CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION
G�
J10
;
EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK. EASEMENTS REQUIRE CITY REVIEW AND
■
I
APPROVAL PRIOR TO CONSTRUCTION.
■
■
'TRACT G Ll
`
'
:
9.
FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED
PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL
REQUIREMENTS OF CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL ARE SUBMITTED TO THE
Q'
■ 2+ i
z w I
CITY OF RENTON.
U
■
O; 2
I
Q
10.
DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON. REFERENCE
fro ;
I
(�d I
;
BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.
In ' I
ZI
■
11.
ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES MUST
t : 3
` Q o
:
BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
12.
ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95
4
w !
:
PERCENT DENSITY, STANDARD PROCTOR.
>=
I
■
I > 1
:
13.
OPEN CUTTING OF EXISTING ROADWAYS FOR NON -FRANCHISED UTILITY OR STORM DRAINAGE WORK
iTRACT M
I
1
:
IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON AND NOTED ON
s2 ■
L
I
THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY OF
►io
r
,
_ J
RENTON TRENCH RESTORATION STANDARDS.
■
I
:
14.
ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
�-
(
:
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS
M�T'
COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED.
15. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN
CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC
WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
16. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND
BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR
THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
RD-04
RD-03:
mmummu.■■.I0
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA
CLASS"C", WITH THE EXCEPTION OF PVC PIPE.
17. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1 OR BETTER
INSIDE AND OUTSIDE.
18. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES SHALL HAVE SOLID LOCKING
LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY
SHALL HAVE SOLID LOCKING LIDS.
19. BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT
WIDTHS AND BUILDING SETBACKS LINES.
20. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
21. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT-OF-WAY SHALL BE OF
SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO
THE BOTTOM OF THE DITCH. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE
REQUIRED, SHALL BE OF SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND
MUST MEET THE FOLLOWING SPECIFICATIONS:
4 -8 INCH ROCK / 40 -70% PASSING;
2 -4 INCH ROCK / 30 -40% PASSING;
AND LESS THAN 2 INCH ROCK / 10 -20% PASSING.
22. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE
SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION.
AN ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE
SUBMITTED TO THE CITY UPON COMPLETION.
23. DRAINAGE OUTLETS (STUB -OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT, EXCEPT FOR
THOSE LOTS APPROVED FOR INFILTRATION BY THE CITY. STUB -OUTS SHALL CONFORM TO THE
FOLLOWING:
A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATIO N ON THE LOT, SO AS
TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS, DRIVEWAYS, YARD DRAINS,
AND ANY OTHER SURFACE OR SUBSURFACE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE
FOR THEIR INTENDED USE. EACH OUTLET SHALL HAVE FREE -FLOWING, POSITIVE DRAINAGE TO AN
APPROVED STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION.
B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE -FOOT -HIGH, 2" X 4" STAKE MARKED
"STORM" OR "DRAIN". THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE VISIBLE, AND
BE SECURED TO THE STAKE.
C. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN CHAPTER 4 OF
THE SURFACE WATER DESIGN MANUAL AND, IF NON-METALLIC, THE PIPE SHALL BE PLACED IN
A TRENCH WITH A TRACING WIRE ABOVE OR OTHER ACCEPTABLE DETECTION.
D. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO CONVEY
FLOWS THROUGH INDIVIDUAL LOTS.
E. THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL
STUBIOUT CONVEYANCE LINES WITH RESPECT TO OTHER UTILITIES (E.G . POWER, GAS,
TELEPHONE, TELEVISION).
F. ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE LOT HOME
OWNER.
G. STORM DRAINAGE PIPE SYSTEMS SHALL NOT PENETRATE BUILDING FOUNDATIONS, EXCEPT FOR
SUMP PUMP DISCHARGE LINES USED TO DRAIN CRAWL SPACES, PROVIDED THE SUMP PUMP
SYSTEM INCLUDES BACKFIOW PREVENTION OR A CHECK VALVE.
24. ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT
SITE MUST DEMONSTRATE ONE OF THE FOLLOWING: THE EXISTING DUFF LAYER SHALL BE STAGED
AND REDISTRIBUTED TO MAINTAIN THE MOISTU RE CAPACITY OF THE SOIL, OR; AMENDED SOIL
SHALL BE ADDED TO MAINTAIN THE MOISTURE CAPACITY.
25. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO CONSTRUCTION
PERMIT ISSUANCE.
26. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT
RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH
STORM SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY
OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING
CONSTRUCTION
27. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES,
PROTECTIVE EQUIPMENT, FIAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE,
HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE
PERFORMANCE OF WORK. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT
NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE PUBLIC
WORKS DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOTSTANDARD
SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.
28. PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL
REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND AQUIFER PROTECTION
REGULATIONS (RMC 4-3-050).
Rm 3
CHECKED FOR COMPLIANCE TO CITY STANDARDS
l
0 FlRi T SUBW 1 AL GR7m �1 11 14 suRVEYED: sCALE: VERTICAL: NAVD 1988 DArE:
1 SECOND ESM 21i 14 DESIGNED: 1 :409 HORIZONTAL: NAD 1983/1991 a� T O W H I T M A N COURT E112/01 �2014
cos - RENTON
2 TFIIRD SUBMITTAL ESM 10 2� 1 �
PAGE:
DRAWN:
3 F*#L SUBMITTAL ESM .11/20/14 CA STORM DRAIN KEY MAP DRAWING NO:
ONE INCH DATUM c
4 M1MR SUBMIITAL 17BY:i
01 1 CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. PERMIT #U14003820 KC IN -JD
IF NOT ONE INCH
!""10. REVISION DATE APPR APPROVED' SCALE ACCORDINGLY
SHEEP: 15
0F.40
Ft z �
Ft z
0
�I
co
e
yEr
m
m
3
T
Ch K
m
RI
m
z
m
m
0
D
-n
T7
0
m o
o p
� o c
Cnn
D•
y Z
= z
_
n,
R7 Z
z
m
(n
CJ
D
A
0
CA
G
z
0
S
co
m
I