Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTED4003775.18w
Q
z
0
w
3
0
otf
�i
CeA 2 WoftV Days Before You Dig
811
Utillities Underground Location Center
(iD,k4T,MD,0RWA)
405
I
395
390
385
380
375
SEE SHEET RD-01
Cco
A PORTION OF THE NW 1/4 OF THE NW 1/4 OF SECTION 15, TWP. 23 N., RC- E., W.M., KING COUNTY, WA
PROPOSED WALL
TRACT L
SEE SHEET RD-04
ROAD C
N: 180455.86
E: 1312301.69
IE=392.03, 12"0
INLET PIPE FOR EX. DRAINAGE
SWALE FROM VAULT
�M
CV
O
l M
co�
�
I )M
I)�
CIO
N
(0
Cp
I a�
�
O4
�
�
�G)B
�
�0
Cr7EM
�,
�
0)
�
� r�-(�6
Nr7II �CD
0) r0
M rn
N
r�
ROCK WALL. BUILDING
r
PERMIT TO BE
z
OBTAINED BY OWNER
—'
w
DRAIN ROCK
a
a
PROPOSED GRADE
I
0
OF PIPE
—
15.5'
12" MIN.
EXISTING GROUND
/
\ —
0 OF PIPE
/
8"0 W. M.
I.E.=392.03
CONC. BASE/COLLAR TO
BE DETAILED/BUILDING
_
PERM PLANS
214 LF,
12"o SD 0 S=1.74%�
8"x12" PERF PIPE TEE
TO BE DETAILED W/
BUILDING PERMIT PLANS
6.7'
CB 5 TYPE 2-48.0
56 LF,
12"0
SD 0 S=12.27%
W / SOILD LOCKING LINDw
TG=396.35
8"0
S.S.
IE=385.16 120
(E)
IE=385.66 6.0
(SW)
IE=385.16 12"0
(W)
1CB
SEE
SHEET RD-02
1 +00
2+00
3+00
o; v
® •a SURVEYED: SCALS:
/ •'. 0 n W 1 �7Vo111� 1 IA. ESM 11 14 VERTICAL: NAVD 1988
CONSULTING ENGINEERS LLC
• • HORIZONTAL: NAD 1983/i991
• �'< Oy : 1 . .�i�AL MM 26 14 DESIGNED: � 20
33400 8th Avenue South % • _
Suite 205
Federal Way, WA 98003 2 TMOM SUBM17TAL ESM10/29/1
FE17Mk NAY (M) Ale-6113 • r
www.esmcivil.com E`ERE1T (425) 297-9900 �, DRAWN:
ELLENSBURG (509) 962-2608 3 rl/•R 5=911 lAL ESM 11 20 1 0M�
Civil Engineering Land Surveying Land Planning 401 1 �/ ONE INCH DATUM
C/
Public Works ( Project Management I Landscape Architecture S { i; �i • 4 R SUBMITTAL ESM 1 01 1 CHECKED: AT FULL
•••• .•� IF NOT ONE NCH
ESM JOB #1799-001-013 �QiYAI••� Z/1114 PJG. REVISION BY DATE APPR APPROVED: SCALE ACCORDINGLY
405
K11
395
390
385
:1
375
3+40
un
KEY MAP
SCALE: 1 "=20' HORIZ.
1 =5 VERT.
20 10 0 20 40
NOTES:
1. SEE SHEET HOR-01 — HOR-03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE
CONTRACTOR. NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE
ENGINEERING PLANS. THESE RECORDS SHALL BE KEPT ON
CONSTRUCTION DRAWINGS AND TURNED OVER TO THE ENGINEER UPON
COMPLETION OF THE PROJECT.
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF
RENTON STANDARDS G012 & G013. FINAL LOCATIONS TO BE
DETERMINED DURING CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO
BE INSTALLED PRIOR TO AS—BUILTS AND COMPLETION OF
CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF
RENTON TRENCH RESTORATION AND STREET OVERLAY DETAIL.
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1
FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION
PER THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV
INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION
SHALL INCLUDE ALL PROJECT STORM DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CITY
OWNED/MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER
DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE
STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND COMPATIBLE
WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY
WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS
VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE
UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN
(AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION
PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION
SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER
SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY
DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE
COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING
OR AIR TESTING THAT MAY BE REQUIRED BY THE CITY TO VERIFY
THE CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED
IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF
THE DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO
KNOWN AS HDPE PIPE OR HDPP)
4. CORRUGATED POLYETHYLENE PIPE (CPEP)
UTILITY CROSSING TABLE
O I.E. (S.D.)
381.64,
12"0
CR. (S.S.)
379.41,
8" 0
O I.E. (W.M.)
393.86,
8"0
CR. (S.D.)
385.90,
12" 0
CHECKED FOR COMPLIANCE TO CITY STANDARDS
ly
R=3775 18
DATE:
CITY OF WHITMAN COURT 12/01/201,
FIELDBOOK:
RENTON ROAD AND STORM PLAN AND PROFILE DRAWINGN0
Planning/Building/Public Works Dept. PERMIT #U14003820 RD-03
SHEET: 18 OF:40
C R
;=
C
�o
m
e
n
C0
'z
m
z!
m
[A
0
D
I
a
8
A
b
0
0
D C)
D �
o
0 U)
D
o Z
aM
n m
P�
u z
z
Cn
0
n
v
A
z
0
C
co
M
I
n
0
0
IlI
n
M
D O
H
a
z n
g <
z
w 10 i
n z
9 _ m