Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTED4003775.19w
Q
z
U
w
O
SEE SHEET RD-01
MATCH LINE STA. 15+00.00
'A
CONNECT TO EX. C.B. #
CONTRACTOR TO VERIFY \
SIZE, DEPTH AND LOCATION' \ PRIOR TO CONSTRUCTION, ` 41 LF, 12., 1
NOTIFY ENGINEER OF ANY \ \
DISCREPANCIES.
O
F
D
0
,TRACT
U
E
JRD-02
CB 11,
SEE SHEET
CL INT'X
STA 15+51.29, ROAD D
= STA. 30+00,00, ROAD C
410
DA
gi
395
385
380
375
A PORTION OF THE NW 1/4 OF THE NW 1/4 OF SECTION 15, TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WA
= JIA. 53+4/.J1, KUAU U
N 3L
Q /
PAD=3�
Q f- 1 +69
Q LU �-
I
O = 33+47 PAD=
ROAD C w _ r--- TRACT I
cow
co (D
°0 00
to
00;r; aD^
(D Cfl
0000 0000
I� PO r7 n
�^
0000
n to
Dom
00
0000
n
O�
Do O
000)
to I")
O1
M
000)
n n
�-Lq
c CV
0)
"'r+,
-0
f rj
n 0)
r' K)
��
4
M 0)
CD3
00 tlj
M 0)
pry
U? ��
L(j tf)
� 0) 0)
n i.r) "' l,r.)
��
d
M
"' �,�
-�
rrj
� 0)
"' PO
�(OD
CV
n M
"� n
NN
O •-
rn
"� ►�
SSD:128'
STATION
EQUATION
PVI STA: 32+46.21
STA. 17+69.04, ROAD D
PVI ELEV: 397.78
= STA.
33+47.32,
ROAD C
HP STA: 32+40.32
CL INT'X
HP ELEV: 395.18
STA 15+51.29, ROAD D
K: 12.27
LVC: 160.00
= STA. 30+00.00, ROAD
C
ELEV: 386.93
SSD: 64'
t6 N
to
iD N
N
PVI STA: 30+50.05
+
+ 17
to
PVI ELEV: 385.93
'') i
�-
"' L -i
LP STA: 30+37.49
PROPOSED
GRADE
@
/
LP ELEV: 386.31
?n
/
K: 6.22
/
LVC: 50.00
/
--
o n
o
EXISTING
GRADE 0
/
---
N 00
f\ 0w0
nL�j
"'�
7009°
/
2.007.
0
"� Sp
12
a3%
41®ES
O
CB #1
CB 2 TYPE 1
SEE SHEET RD-02
W/ BIDIRECTIONAL
GRATE
TG=386.31
IE=382.98 6"0
IE=382.48 12"0
CaN 2 Working Days Before You Dig
811
UtN m Underground Location Center
(ID,MT,PD,OR,WA)
30+00
ENGINEERS LLC
®CONSULTING
33400 8thAvenue South
Suite 205
Federal Way: WA 98003
FEDERAL WAY (253) 636-6113
www.esmcivii.com
EVERETT (425) 297-99W
ELLENSBURG (509) 962-2W8
Civil Engineering
Land Surveying Land Planning
Public Works
I Project Management I Landscape Architecture
ESM
JOB #1799-001-013
31 +00
410
405
395
390
385
380
375
M
KEY MAP
SCALE: 1 "=20' HORIZ.
1 "=5' VERT.
20 10 0 20 40
NOTES:
1. SEE SHEET HOR-01 - HOR-03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE CONTRACTOR.
NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE ENGINEERING
PLANS. THESE RECORDS SHALL BE KEPT ON CONSTRUCTION DRAWINGS AND
TURNED OVER TO THE ENGINEER UPON COMPLETION OF THE PROJECT.
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF
RENTON STANDARDS G012 & G013. FINAL LOCATIONS TO BE DETERMINED
DURING CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO BE INSTALLED
PRIOR TO AS-BUILTS AND COMPLETION OF CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF RENTON
TRENCH RESTORATION AND STREET OVERLAY DETAIL.
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION. VIDEO
TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER
THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION
VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND
MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED AND
ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN
COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING
SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR
DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND
DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON
THE APPROVED PROJECT CONSTRUCTION PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE
BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV
INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQUIRED BY THE
CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE
CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO
KNOWN AS HDPE PIPE OR HDPP)
4. CORRUGATED POLYETHYLENE PIPE (CPEP)
R=3775 19
CHECKED FOR COMPLIANCE TO CITY STANDARDS
32+00 33+00 33+60
O RFW S �e�AL ram" 7 /11/1 SURVEYED: SCALE:
1 ��MM77�� aa/vw SECOND �� G.�w IO ESM 1 1 =� HORIZONTAL:
NAVD , 988 •� W H I T M A N COURT 12/01 /2014
• • HORIZONTAL NAD 1983/1991 �► C ' I y O F
DESIGNED
FIELDBOOK:
2 „IM su�TAL � 10/20/1RENTON
mu PAGE:
3 � AL iM 11/20/1 °`�""" E1R/= I ROAD AND STORM PLAN AND PROFILE DRAWING N0:
�I1A �1� �y 1puffT M,, ONE INCH DATUM d
4 Wftm SLMWffAL E5w1 12/01/1 CHECKED: AT FULL SCALE Planning/Building/Public Works Dept. PERMIT #U14003820 RD-04
IF NOT ONE INCH
'Ili 0. REVISION al' DATE AP P R APPROVED: SCALE ACCORDINGLY SHEET: 19
OF:40
C:
z
0
00 =
C
cm
xi
W
TUz
m,
m
M
0
A
T
0
-1D
mo
41
o°
MCn
� m
D•
ae -9 m
Z M
D_
y 33
m
CTI�
z
ccnn
0
D
M
A
z
0
C
9
co
m
M
_ i W
y I �
' z
>q >yy
�
O
u °O
C
T n
1
J
I
�l
I
n
0
VT
�
J4
°
A
C
y C..'
s
2
z
, z