Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTED4003775.45SEE SHEET RD-01
MATCH
LINE STA.
15+00.00
4;L LF, 12"0 SD-----
EEC. CS, rrE 2- 8%
S eh+ ; 3.59, 8.,4i' ` ®I
I
27.4���..,.,:
-
~
C8 #1, TYPE 2
r
W/ BIDIRECTIO�
I
STA 43t33:�i!3;
378.29 E.SE IE=378-W 12"O
-
1-15+33.45. 0.'
CONNECT TO EX. C.B.
Q
CONTRACTOR TO VERIFY
i
--
LOCATION AND DEPTH
-
PRIOR TO CONSTRUCTION
p
AND NOTIFY ENGINEER OF i
r
I
2
ANY DISCREPANCIES
I1 `
I`
E'' C- Tr PE"
� . L
I
-
L;
1
EX- PIPE TO BE REMOVED'
%
.--
E=382.=5,
I
1
CL INT'X ( I
XA 1 + 1. 9,
`= STA. 30+00.00, ROAD C
r
410
0
395
#
375
370
A PORTION OF THE NW 1 /4 OF THE NW 1 /4 OF SECTION 15, TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WA
6"0 WALL DRAIN, DAYLIGHT
TO EXISTING GROUND (TYP.)
O CURB FTABLE
BCR
1/4 p
1 /2 p
3/4 p
ECR
STATION
OFFSET
ELEV.
15+17.61
10.03' LT
386.94
----
---
386.87
----
----
386.81
----
----
386.74
30+35.00
10.00' LT.
386.51
p = 90'00'00"
R= 25.00' L= 39.27'
5+87.40, 0.06- LT.
6"0 ROOF DRAIN
• S=1.0% MIN. (TYP)
CURB STABLE
BCR
1 /4 p
1/2 p
3/4 p
ECR
STATION
OFFSET
ELEV.
15+82.62
10-W LT
387.45
---
---
387.13
----
----
386.99
----
----
386.86
30+29.54
10.00' RT.
386.56
p=94'3N48"
R=19.00' L=31.36'
27
PAD=390.70
ii I I
11 .f f♦
• 9
.__ �, �,........�i+=iiii�ir•L�IrILti,:.:-ice �a..s��__- _ _ _
PROPOSED WALL
N
I� r
a0 ^
MOD
i 7
ch
Cq in
I`- t0
(o co
op O 0000
�00 M
M
CV
M
CO
(o
aD
�00
►�
N N
O
(0
ao ^
SOD
e�
�) N
N
in
co ^
�.�QO
M
N
st
M
a0 ^
BOO
M
N
t0
n
a0 ^
�00
►')
N (14
OD
a0 r
MOU
►�
C7) N
O
►�
n OD
MOD
M
,_ N
N
00 CO
M00
M
00 N
d'
d
't aD
BCD
M
OD N
cG
►f?
i>D 00
�r4)
M
N
•-
UD
a0 Q'
M00
M
t') O
r--
of
a0 O
Mof
M
PVI STA: 15+ 10.00
+
j
PVI ELEV: 386.52
PVI ELEV: 388.85
I
LP STA: 15+ 18.33
LP STA: 17+ 17.51
LP ELEV: 386.69
LP ELEV: 388.60
I
K: 16.67
K: 8.33
LVC: 50.00
LVC: 50.00
on
(D
n
000
arn
!
+ n
±
ar;
ci
+
+
�
I
�
;
nM
fAi
4i
Uw
Ua.-
CL INT'X
m
'
TA 1 +51.29,
RW D
PROPOSED
GRADE •
- STA. 30+00.00, ROAD C
!
ELEV: 386.93
Ca12 Wav Ick Dep 8d= 9 You 019
811
Utz th dwlpand Lo=&n C*lisr
=IIIIT,titQOR,WA)
` 4 EXISTING GRADE ® CL-4+- LF, 12"0 SD-\,
7 -
1.00%
53.9
-41 . -
53.9 - -�
27.4 ; .._ . LF, 12 4 SD S
-i--oL- LF, 12 "0 SD
1i
- - CB TYPE 1
z
TG=387.70 z cv
II!
3 TYPE 2-48"0 tE 3�6Q-4+ 6" (NE) 383.04 Q !^
TG=387.29 IE=381.6 4 12 d (NW) 382,82 +
RIM NO? SET SEE SHEET RD-04 IE=3t31.44 12„0 (E) 381.61 } `��' + tn
IE=3f41-44 12 0 (SE) 381.58 [ z
O Q
IE=3r998.69; 12"0 378.29 E.SE IE=38a-.44 12"0 (NW)381.56 � i- W
CONNECT TO EX. C.B. B 1 TYPE 2-48 aI' a
__W/_ BIDIRECTIONAL GRATE
CONTRACTOR TO VERIFY TG=386.75 I
LOCATION AND DEPTH IE=3841~.68 12"0 380.65 SE
PRIOR TO CONSTRUCTION IE=380313 12"0 380.59 E
AND NOTIFY ENGINEER OF IE=380.5A 12"0 390.46 WNW
ANY DISCREPANCIES
15+00
® CONSULTING ENGINEERS LLC
=5'""""' 1. 1 ♦ 1 * 1
Federw Weir. WA 9WW
www.esmcivii.com "-" 11
nv-�
a,em w ..e-ses
Civil Engir»e►inq Lmd Swr"yirq Land Pimmi"
Pubic worm I F"4mA Ilm" meni I uxwwmw *cftwcu"
ESM JOB #1799-001-013
1 F+00
0
FlRST SUBMITTAL..
1
SECOND SUBMITrAL
2
THIRD SUBMITTAL
3
FINAL SUBMITTAL_
4
MYLM SUBMITTAL
1�
NO,
REVISION
17+00
ESM
7/11 14
&
ESM
26 14
negKolm
ESM
10/29/1
ESM
11 20 1
c�
ESM
12/01/1
BY
I DATE 1
APPR
APPao�o-
410
02
395
375
370
17+80
SOME
I"m2W
aii� fi[ai _
AT FMI SMV
SOKE If wr ow VCH
R=377545
AS --BUILT CERTIFICATION:
THE ASBUILT INFORMATION SHOWN
HEREON IS BASED UPON A FIELD
SURVEY BY E OR UNDER MY DIRECT
SUP IN OC R, 2015
MAN EOnRSON, L.S. NO. 22338
DATE:
1*0&7 wmpiss/isn
CITY OF
RENTON
DATUM
Planning/Building/Public Works Dept.
Fli
SCALE: 1 "=20' HORI2.
1 -5' VERT.
20 10 0 20 40
NOTES:
1. SEE SHEET HOR-01 - HOR-03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE CONTRACTOR.
NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE ENGINEERING
PLANS. THESE RECORDS SHALL BE KEPT ON CONSTRUCTION DRAWINGS AND
TURNED OVER TO THE ENGINEER UPON COMPLETION OF THE PROJECT.
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF RENTON
STANDARDS G012 do GO13. FINAL. LOCATIONS TO BE DETERMINED DURING
CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO BE INSTALLED PRIOR TO
AS-BUILTS AND COMPLETION OF CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF RENTON
TRENCH RESTORATION AND STREET OVERLAY DETAIL.
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION. VIDEO
TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER THE
FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION
VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND
MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED AND
ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN
COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING
SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR
DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND
DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON
THE APPROVED PROJECT CONSTRUCTION PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE
BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV
INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL. CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REOURIED BY THE
CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY_
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE
CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO
KNOWN AS HDPE PIPE OR HDPP)
4. CORRUGATED POLYETHYLENE PIPE (CPEP)
UTILITY CROSSING TABLE
O LE. (W.M.)
386,09,
8"0
CR. (S.D.)
380.50,
12"0
O I.E. (S.D.)
380.84,
12"0
CR. (S.S.)
379.21,
8"®
CHECKED FOR COMPLIANCE TO CITY STANDARDS
s/S1 x cx
LAB
12-15-2017
WHITMAN COURT 01/13/2011
F�dt:
ROAD AND STORM PLAN AND PROFILE:
PERMIT #U14003820 RD-02
17 "40
o W �
a Zz
UJ
g C G
�
C
=�o
n m
a m-
T
W
Nz
m
m
�]
co
a
D
D
T
p
00
goo
?14m
,z*
�� _
Vimrn °
n m-
N z
m
O
D
Ag: 3775 u�