Loading...
HomeMy WebLinkAboutTED4003775.46MT- 395 390 V�-A R 375 V - j1 o A PORTION OF THE NW 1 /4 OF THE NW 1 /4 OF SECTION 15, TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WA SEE SHEET RD-04 SEE SHEET RD-01 ROAD C SEE SHEET RD-02 PROPOSED WALL TRACT L �'M � OO �,�d c0r0 '') Ova N� M� r N NO p� tVtNO 't cVrp rs n w n 00 OD 0000 00 O co C) c0 c'i 00 M co 00 C) O d C" C) din Of of ►'�� In vi O� Qm -nwi m O) wi ma) �n "Ifs rh MO) Q) M� POI co rn Mn r,)M MM ►nM r`7M rnM r�r,) MM r`)M GI 2 WO kiip D"m Beft YouDig t,.fte 81 L«0on car �,�tf�0lilWA) 1 +00 ®334WM SZ ENGINEERS LLC s� 205 "".vWW "sown 1. 1 ♦ I Vr I way, WA 98003 www.esmcivii.com s 1 � 1 "m AnMectum ESM JOB # 1799-001-013 I P- E. ..390 "ONC. BASE/COLLAR TO 3E DETAILED W/ BUILDING "MIT PLANS 3"x 12" _ PERF PIPE TEE TO BE DETAILED W/ 3UILDING PERMIT PLANS I 0 S_.2m •n —�s 10.09% XC 395 D1 375 N: 480466.86 180154.21 E: 431193941.619 1312357.70 IE=392.06, 12",�► 390.86 INLET PIPE FOR EX. DRAINAGE SWALE FROM VAULT 00 z ALLOWABLE PIPE MATERIALS 1. REINFORCED CONCRETE PIPE 2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52) 3. SOLID WALL POLYETHYLENE PIPE (SWPE ALSO KNOWN AS HDPE PIPE OR HDPP) 4. CORRUGATED POLYETHYLENE PIPE (CPEP) R=377546 AS —BUILT CERTIFICATION: THE ASBUILT INFORMATION SHOWN HEREON IS BASED UPON A FIELD SURVEY BY ME OR UNDER MY DIRECT SUPERVISIO IN OCT BER, 2015 2+00 3+00 3+40 7 N MAN E. ON, L.S. NO. 22338 DATE: & 0 FIRST SUBMITTAL ESM 7 11/1 1 em2W voMw _ WD HORKIMAL fm "a'7199i DATUM ` CITY OF RENTON Planning/Building/Public Works Dept. 1 SECOND SUBMITTAL ESM /26/14 2 THIRD SUBMITTAL ESM 10/29/14 3 FINAL SUBMITTAL ESM 11/20/1 orw+r. O� 4 MY1AR SUBMITTAL ESM I AT F NOr ONE WM SCAU "CCO10"M" NO. REVISION BY DATE 1 APPR * KEY MAP SCALE: 1'=20' HORIZ, 1'=5' VERT. 20 10 0 20 40 NOTES: 1. SEE SHEET HOR-01 — HOR-03 FOR HORIZONTAL CURVE DATA. 2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE CONTRACTOR_ NOTIFY THE ENGINEER OF ANY DISCREPANCIES. 3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE ENGINEERING PLANS. THESE RECORDS SHALL BE KEPT ON CONSTRUCTION DRAWINGS AND TURNED OVER TO THE ENGINEER UPON COMPLETION OF THE PROJECT- 4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF RENTON STANDARDS G012 do G013. FINAL LOCATIONS TO BE DETERMINED DURING CONSTRUCTION BY THE CITY_ SIGNS WILL NEED TO BE INSTALLED PRIOR TO AS--BUILTS AND COMPLETION OF CONSTRUCTION. 5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF RENTON TRENCH RESTORATION AND STREET OVERLAY DETAIL. 6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION. VIDEO TO BE PROVIDED TO CITY INSPECTOR_ 7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT. 8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER THE FOLLOWING PROCEDURE: A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE AL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES THAT WILL BECOME CRY OWNED/MAINTAINED AND ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN COLOR AND -COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON THE APPROVED PROJECT CONSTRUCTION PLANS. B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION, EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REOURIED BY THE CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY. C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE DEVELOPER. VIDEO TO BE PROVIDED TO CITY INSPECTOR. UTILITY CROSSING TABLE O I.E. (S.D.) 381.64, 12"0 CR. (S.S.) 379.41, 8"0 O I.E. (W.M-) 393.86, 8"0 CR. (S.D.) 385.90, 12"0 CHECKED FOR COMPLIANCE TO CITY STANDARDS w s 12 nuE: WHITMAN COURT CH/13/2011 ma m=. ROAD AND STORM PLAN AND PROFILE Mew W_ PERMIT #U14003820 RD-03 18 "40 LU c =i m ° �m m- UK co N 2 m z m 30 m ° D nm ° ! o° o °c m� IE' ccn $' D �m C* i m- U� N2 z m co o D liJ w� 1 �y cra�� 0 z� r� W y ar,; IR•377591a