Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTED4003775.47SEE SHEET RD-01
MATCH LINE STA.
15+00.00
nth.
Tr---C
\
CONNECT TO EX.
C.B. -
CONTRACTOR TO VERIFY
SIZE, DEPTH AND LOCATION
LF, 12"4
PRIOR TO CONSTRUCTION,
NOTIFY ENGINEER
OF ANY
41.5
DISCREPANCIES.
A.
DT
Tr
TRACT
E`
Ex. :9 :'PE 1
TT -
`E-352.5,93. 12
C81,
,
SEE SHEET RD-02
CL INT'X
STA 15+ 1,29, ROAD D
= STA. 30+00,00. ROAD C
410
t..
395
kPit]
"..i-A
t.
375
A PORTION OF THE NW 1 /4 OF THE NW 1 /4 OF SECTION 15, TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WA
i
TRACT K .-1.-
31+00 \
'r 6' ROOF DRAIN1 "'
���
A S=1.076 MIN. (TYP.) 39
~�� ------ ------ - - / �: PAD=393.70
---- -- -4---------------- _
S.D.C.O.
O 38
21 22 23 24 25 PAD=393.70 - t
PAD=386.20
PAD=W5.20 PAD=387.60 PAD=389.40 PAD=390.90 26
PAD=392.40 Z 37 -Vil
PAD=393.70
p Z CO f2, TYPE 1
QA W/ BIDIRECT04AL GRATE TRACT J
STA SEE SHEET RD-03
I'
30+37.44. 0.42' W. Y �'
W 36
o ! PAD=393.10
27
STATION EQUATION PAD=390.70 C8 %S + '•
STA. 17+69.04, ROAD D } SEE SHEET RD-03
I
STA. 33+47.32, ROAD C _ PAD=393.10 35
N 34
0 f PAD=393.10
ROAD C
Q W
W 33+47
Ca
Uj
TRI
co --�- --
10in
aDt7
a,^
��
colt
OtO
oM
,_�
�o
^�
�o
LO00 r Mo
d
�n tat�o NN
M CS
MM
�M
aMOM
OVUM
OMOM
��
M�
ihM
t0
00 ri
MM
to ai
MM MM
d
MM
Ch N
MM p)0 �M
MM
1
SSD:128'
STATION EQUATION
{
;
PVI STA: 32+46.21
STA. 17+69.04. ROAD D
PVI ELEV: 397.78
= STA. 33+47.32, ROAD C
HP- STA: 32+40.32
_
:CL
'
HP ELEV: 395.18
INT'X
Le- , 1)13
Cd 2 Workilp Days EWft a You Db
811 �S l�It�f�+01/1t�r caftn CM11K
pDMrMORWA)
LN
5SD
OS----- r--�-�"". --
i
ca 1 ICB 2 TYPE 1
SEE SHEET RD-02 W/ BIDIRECTIONAL GRATE
TG=386.31 j
IE=382.98► 6e0 383.07 SE 1
IE=382.48. 12*0 382.62 W j
f
}
30+00
C:O1[S-LILTING ENGINEERS LLC
3mwSuite � Avstttle South
Fadelat Way. WA 980M
fmw. r!w ni••4+u
www.esmcivil.com"
ChA Engtrmewing Usnd Sumv*y land Planning
Public Monty I Pnoieet managemnd ( t.andscgw ArchAectwe
ESM JOB # 1799-001-013
31 +00
0
FIRST SUBMITTAL
1
SECOND SUBMITTAL
2
THIRD SUBMITTAL
3
FINAL SUBMITTAL
4
MYW SUBMITTAL
Rol
REVISION
32+00
ESM
7/11/14
ESM
14
1DESM
ESM
N
ESM
12/01/1
I
t�uacfnt
BY
ATE
APPR
33+00
410
t..
tt
395
375
33+60
Ful
KEY MAP
SCALE: 1 =5' R Z. .
1 VERT.
OEM
20 10 0 20 40
NOTES:
1. SEE SHEET HOR-01 - HOR-03 FOR HORIZONTAL CURVE DATA.
2. EXISTING DRY UTILITIES SHALL BE REMOVED OR RELOCATED BY THE
APPROPRIATE UTILITY COMPANIES AND COORDINATED WITH THE CONTRACTOR.
NOTIFY THE ENGINEER OF ANY DISCREPANCIES.
3. CONTRACTOR SHALL RECORD ANY FIELD DEVIATION FROM THE ENGINEERING
PLANS. THESE RECORDS SHALL BE KEPT ON CONSTRUCTION DRAWINGS AND
TURNED OVER TO THE ENGINEER UPON COMPLETION OF THE PROJECT_
4. STREET NAME SIGNS AND STOP SIGNS TO BE INSTALLED PER CITY OF
RENTON STANDARDS G012 & GO13. FINAL LOCATIONS TO BE DETERMINED
DURING CONSTRUCTION BY THE CITY. SIGNS WILL NEED TO BE INSTALLED
PRIOR TO AS-BUILTS AND COMPLETION OF CONSTRUCTION.
5. ALL TRENCH RESTORATION SHALL BE PER THE CURRENT CITY OF RENTON
TRENCH RESTORATION AND STREET OVERLAY DETAIL.
6. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION. VIDEO
TO BE PROVIDED TO CITY INSPECTOR.
7. PROVIDE ETHAFOAM PAD WHEN VERTICAL SEPARATION IS LESS THAN 1 FOOT.
8. STORM DRAINAGE MAINS SHALL BE VIDEOED FOLLOWING INSTALLATION PER
THE FOLLOWING PROCEDURE:
A) THE PROJECT DEVELOPER SHALL SUBMIT TO THE CITY THE CCTV INSPECTION
VIDEOS AND WRITTEN REPORTS. THE CCTV INSPECTION SHALL INCLUDE
ALL PROJECT STORM DRAIN LINES AND CONNECTING CATCH BASIN AND
MANHOLE STRUCTURES THAT WILL BECOME CITY OWNED/MAINTAINED AND
ALL PRIVATE 8 INCH DIAMETER OR LARGER DRAIN LINES AND CONNECTING
CATCH BASIN AND MANHOLE STRUCTURES. SAID VIDEOS ARE TO BE IN
COLOR AND COMPATIBLE WITH THE CITY'S VIEWING AND RECORDING
SYSTEMS. THE CITY WILL ONLY ACCEPT VIDEO SUBMITTALS ON CD OR
DVD THAT IS VIEWABLE BY STANDARD VIDEO PLAYER (I.E. MPG VIDEO FILE
FORMAT) AND IS COMPATIBLE WITH GRANITE XP. THE VIDEO SHALL
REFERENCE EACH PROJECT DRAIN PIPE SEGMENT TO THE UPSTREAM AND
DOWNSTREAM CONNECTING STRUCTURES AS SOWN (AND IDENTIFIED) ON
THE APPROVED PROJECT CONSTRUCTION PLANS.
B) THE COSTS INCURRED IN MAKING THE INITIAL CCTV INSPECTION SHALL BE
BORNE BY THE PROJECT DEVELOPER. THE DEVELOPER SHALL BEAR ALL
COSTS INCURRED IN CORRECTING ANY DEFICIENCIES FOUND DURING CCTV
INSPECTION, INCLUDING THE COST OF ANY ADDITIONAL CCTV INSPECTION,
EXFILTRATION TESTING OR AIR TESTING THAT MAY BE REQURIED BY THE
CITY TO VERIFY THE CORRECTION OF SAID DEFICIENCY.
C) THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN THE
CCTV INSPECTION PERFORMED SOLELY FOR THE BENEFIT OF THE
DEVELOPER.
VIDEO TO BE PROVIDED TO CITY INSPECTOR.
ALLOWABLE PIPE MATERIALS
1. REINFORCED CONCRETE PIPE
2. DUCTILE IRON (WATER SUPPLY, CLASS 50 OR 52)
3. SOLID WALL POLYETHYLENE PIPE
(SWPE ALSO
KNOWN AS HDPE PIPE OR HDPP)
4. CORRUGATED POLYETHYLENE PIPE
(CPEP)
Ir-
AS-BUILT CERTIFICATION:
THE ASBUILT INFORMATION
SHOWN
HEREON IS BASED UPON A FIELD
SURVEY BY ME OR UNDER
MY DIRECT
SUPERVI IN OCT
2015
MAN E. LARSON, L.
O. 22338
DATE: & /¢'
n_.._.-.T
R=377547
scmf,
1•�,0' ! '�"t CITY OF
RENTON
AT � SME DATUM Planning/Building/Public Works Dept.
IF Nm of MOM
scat: ax:0ttonsir
io
L l A%
12-15-2017
CHECKED FOR COMPLIANCE TO CITY STANDARDS
WHITMAN COURT 01/13/2011
MUMMIC.
ROAD AND STORM PLAN AND PROFILE !�
PERMIT #U14003820 RD-04
10 "m
D o
7""1
C <
{ �=
C
MO
Am
5
p
Nz
m
z
m
3D
Cn
OO
D
D
M
O
M
o11
CD
Qo
c
o�
'D
z�
K
Nz
z
m
O
D
n
T
n CDO
mo
�o D