Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTED4003775.9w
Q
z
J
L�
SHEET SP-02 A PORTION OF THE NW 1 /4 OF THE NW 1 /4 OF SECTION 15, TWP. 23 N., RGE. 5 E., W.M., KING COUNTY, WA
�- SE 128TH ST (KING COUNTY)
NE 4TH ST (RENTON) - - - - -
(PRINCIPAL ARTERIAL)
a I I
I f
C
PROPOSED TEMPORARY SEDIMENT
TRAP #1, SEE TABLE THIS SHEET /
AND DETAIL ON SHEET GR-05
I
! \ + SEE SLEI N -02
r"T. " I
1 1
i INTERCEPTOR SWALE l
W/CHECK DAMS PER DETAIL
ON SHEET GR-05 I' I
Cal 2 Working Daye Before You Dig
811
Unties Underground Location Center
(ID,Wr ND,OR,WA)
L
-RO D
11
INSTALL N.G.P.E FENCE I I
ALONG WETLAND ' 1 I I
.1 1
PROPOSED TEMPORARY SEDIMENT
TRAP #2, SEE TABLE THIS SHEET
AND DETAIL ON SHEET GR-05
PLACE INLET PROTECTION ON
EX. CATCH BASINS BEFORE
CONSTRUCTION STARTS (TYP.)
CLEARING LIMITS (TYP.)
SILT FENCE TO BE PLACED AT
CLEARING LIMITS (LINES ARE OFFSET
1' FOR CLARITY). SEE STD PLAN
214.00 ON SHEET GR-05 (TYP.)
CONSTRUCTION ENTRANCE
PER STD DETAIL 215.10 ON
SHEET GR-05
I '
Wes=
zw
W
U
U
IV Q
zzi
Q o
I I~ w
0
_ L_
21
00
Ln
N
1 li
0
CONSTRUCTION ENTRANCE PER STD
--�.
�allow 1
I
SHEET GR-02 i
r3Ie
TO
T ISC psI
-D omw'q
EX. C C BASINS TO
BE REMOVED
ENGINEERS L L C
®CONSULTING
33400 Avenue South
I • I + I (may
Suite 205 05�'�
Federal Way, WA 98003
nXIDIIAL WAY (253) 0.7E-6113
www.esmcivii.com
EVT:REr (425) 29'-99M
ELLENSBURG (509) 962-2608
Civil Engineering
Land Surveying
Land Planning
Public Works
I Project Monogern t
I Landscape Architecture
ESM
JOB #1799-001-013
DETAIL 215.10 ON SHEET GR-05
OPR
AAW
��� �� t 0
ROCK WALL (TYP.)
,•�' � 0 FW SUBMITTAL
•���� goy : 1 SECOND SUBMITTAL
�• 2 THIRD SUBMITTAL
NOTE
POND SHOULD BE CLEANED OUT (VEGETATION AND
SEDIMENT) TO CITY OF RENTON STANDARDS PRIOR
TO FINAL PUD APPROVAL.
T.E.S.C. TRAP #1 TABLE
SUB BASIN AREA =
0.92 AC
INFLOW 2 YR/15 MINUTE =
0.251 CFS
INFLOW 100 YR/15 MINUTE =
0.987 CFS
SURFACE AREA (REQ'D) =
525 SF
SURFACE AREA PROVIDED =
800 SF
TOP BERM ELEV. =
383.0
EMERGENCY SPILLWAY ELEV. =
382.0
EMERGENCY SPILLWAY WIDTH =
6'
POND BOTTOM ELEV. =
378.5
POND TOP LENGTH =
48'
POND TOP WIDTH =
38'
T.E.S.C. TRAP #2 TABLE
SUB BASIN AREA =
1.20 AC
INFLOW 2 YR/15 MINUTE =
0.327 CFS
INFLOW 100 YR/15 MINUTE =
1.29 CFS
SURFACE AREA (REQ'D) =
685 SF
SURFACE AREA PROVIDED =
800 SF
TOP BERM ELEV. =
383.0
EMERGENCY SPILLWAY ELEV. =
382.0
EMERGENCY SPILLWAY WIDTH =
6'
POND BOTTOM ELEV. =
378.5
POND TOP LENGTH =
48'
POND TOP WIDTH =
38'
T.E.S.C. TRAP #3 TABLE
SUB BASIN AREA =
1.08 AC
INFLOW 2 YR/15 MINUTE =
0.294 CFS
INFLOW 100 YR/15 MINUTE =
1.16 CFS
SURFACE AREA (REQ'D) =
6155 SF
SURFACE AREA PROVIDED =
800 SF
TOP BERM ELEV. =
387.0
EMERGENCY SPILLWAY ELEV. =
386.0
EMERGENCY SPILLWAY WIDTH =
6'
POND BOTTOM ELEV. =
382.5
POND TOP LENGTH =
48'
POND TOP WIDTH =
38'
SHEET GR-03
PROPOSED TEMPORARY SEDIMENT
TRAP #3, SEE TABLE THIS SHEET
AND DETAIL ON SHEET GR-05
ROAD C
ULTRA BLOCK WALL
(SEE DETAIL ON
SHEET DT-02)
3 FINAL SUBMNTTAL
40111 4 M11"m SUBMITTAL
1sTE:°
iiVAI �' (�/j/([� N0, REVISION
CATCH BASIN FILTER (TYP.) PER
STD PLAN 216.30 ON SHEET
GR-05
GRADING QUANTITIES
STRIPPING (6" DEPTH)
= 4,750 C.Y.
CUT
= 800 C.Y.
FILL
= 11,700 C.Y.
NET (FILL)
= 10,900 C.Y.
EARTHWORK QUANTITIES ARE
FOR PERMIT PURPOSES
ONLY.
QUANTITIES ARE "NEAT LINE"
ONLY. THE QUANTITIES
DO NOT ACCOUNT FOR ANY
SHRINK OR SWELL
FACTORS. IT IS THE CONTRACTORS RESPONSIBILITY
TO CALCULATE THE EARTHWORK VOLUMES FOR BID
PURPOSES.
LEGEND
-❑-- -p- -
NGPE FENCE
FILTER FABRIC FENCE
now
CONSTRUCTION ENTRANCE
�-
INTERCEPTOR DITCH W/ ROCK CHECK DAMS
CLEARING LIMITS
CUTOFF SWALE
0
PROPOSED SEDIMENT BARRIER TO BE USED
ONCE CATCH BASIN IS INSTALLED
EXISTING CONTOUR
PROPOSED CONTOUR
------_______-_----__---____--
DAYLIGHT LINE
R
RIDGE LINE
CONSTRUCTION SEQUENCE
SCALE: 1 " = 40'
40 20 _} 4Q
R=377509
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR (MAY BE CONSOLIDATED
WITH THE REQUIRED NOTICE OF CONSTRUCTION SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED.
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. CONSTRUCT SEDIMENT PONDS AND TRAPS.
8. GRADE AND STABILIZE CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.)
SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE
CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH
THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY
SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH,
COMPOST, PLASTIC SHEETING OR EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS
REMOVED IF APPROPRIATE.
GEOTECHNICAL NOTE
PROOF -ROLLING PER PAGE 12 SECTION 8.3 OF GEOTECHNICAL REPORT DATED DECEMBER 16, 2013 AS FOLLOWS:
FOLLOWING THE RECOMMENDED CLEARING, SITE STRIPPING, AND PLANNED EXCAVATION, THE STRIPPED SUBGRADE WITHIN THE
BUILDING AREAS SHALL BE PROOF -ROLLED WITH HEAVY, RUBBER -TIRED CONSTRUCTION EQUIPMENT, SUCH AS A FULLY
LOADED, TANDEM -AXLE DUMP TRUCK. PROOF -ROLLING SHOULD BE PERFORMED PRIOR TO STRUCTURAL FILL PLACEMENT OR
FOUNDATION EXCAVATION. THE PROOF -ROLL SHOULD BE MONITORED BY THE GEOTECHNICAL ENGINEER SO THAT ANY SOFT OR
YIELDING SUBGRADE SOILS CAN BE IDENTIFIED. ANY SOFT/LOOSE, YIELDING SOILS SHOULD BE REMOVED TO A STABLE
SUBGRADE. THE SUBGRADE SHOULD THEN BE SCARIFIED, ADJUSTED IN MOISTURE CONTENT, AND RECOMPACTED TO THE
REQUIRED DENSITY. PROOF -ROLLING SHOULD ONLY BE ATTEMPTED IF SOIL MOISTURE CONTENTS ARE AT OR NEAR OPTIMUM
MOISTURE CONTENT. PROOF -ROLLING OF WET SUBGRADES COULD RESULT IN FURTHER DEGRADATION. LOW AREAS AND
EXCAVATIONS MAY THEN BE RAISED TO THE PLANNED FINISHED GRADE WITH COMPACTED STRUCTURAL FILL. SUBGRADE
PREPARATION AND SELECTION, PLACEMENT, AND COMPACTION OF STRUCTURAL FILL SHOULD BE PERFORMED UNDER
ENGINEERING -CONTROLLED CONDITIONS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
NOTES:
PAD = STRUCTURAL GRADE
6" OF STRIPPING TO BE ADDED
TO STRUCTURAL PAD.
C
o
m
-
m
m
zz
Y �
C
co
m
m
II" a
J
i
J i
V1
CHECKED FOR COMPLIANCE TO CITY STANDARDS
C -
D
0
fly
0
0
l cr
m o
m
�ti �_ /2I2•/
� o o
D
€ DCn
R m
z
D •
s m
ESM 7 11 14 SURVEYED: SCALE:
VERTICAL: NAB , 3/1 W H I T M A N COURT 12/0 /20
HORIZONTAL: NAD 1983/1991
Esm mM 14 DESIGNED:
ESM 10/2S/1 lm PAGE: OOK:
PAGE:
esM 11 /20 1 °R"""" CJR GRADING & T.E.S.C. PLAN DRAWING NO:
ONE INCH DATUM 1 ESM 12/01/1 CHECKED: AT FULL SCALY PERMIT #U 14003820 G R - 01
IF NOT ONE INCH
BY DATE APPR APPROVED: SCALE ACCORDINGLY SHEET: OF:�
CITY 0 �
RENTON
Planning/Building/Public Works Dept.