Loading...
HomeMy WebLinkAboutTED4003776.19e z 0 I 0 N R1 7/S1.4 v 3/S1.4 v 5'x10' METAL BAR GRATING BY OTHERS W/ INTEGRAL 30" SQ ACCESS HATCH 0 I LO 23'-6" 12"0 VENT THROUGH LID .a000aa ❑❑ oa o❑ ❑❑ o❑ ❑❑ a oaoal 418/S1.4 105'-4" 12 PLANKS @ 4'-0" = 104'-0" 64'-0" 8" CURB EXTENDING 12" ABOVE THE TOP OF VAULT 12-1/2" PRECAST HOLLOW CORE LID PLANK. 24" DIAMETER OPENING TO ACCEPT RISERS, LADDER RING AND LOCKING MANHOLE COVER PER CIVIL DRAWINGS PROVIDE REINF PER PLANK MANUFACTURER 11 /S1.3 , C�HDR ❑❑❑ ❑❑❑❑i 2/S1.4 ❑ ❑❑❑❑ ____ ____ ____ ____ ______ -_ _____---------------- ---------- ------------_____ _____ ___________ ___________ ________ __ ___________ __i --- ❑❑ ❑ ❑❑ ❑❑ p a--------------------------------- - ❑❑❑ ❑❑ ❑❑ ❑ ❑ ❑❑ ----------- ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑❑ ❑ ❑❑ ❑❑ I PROVIDE REINF PER OPENING IN WALL BELOW PLANK MANUFACTURER OPENING IN WALL BELOW C INTERIOR WALL BELOW P ITOV HELD BELOW INSIDE TO OF VAULT 126.52 2 i f 12/S1.3 BLOCKOUTS IN EDGE CELL OPENING IN WALL BELOW. SEE 11 /S1.3 FOR CONC. 9 1.4 typ. OF THE PLANK AS SHOWN HEADER REINF. C 1 Q/S1.4 , ❑ ❑ oj ❑ 11 11/S1.4 POUR SLOTS PER PLANK v ❑❑❑❑❑❑❑❑ MANUFACTURER ❑❑❑❑❑❑❑❑ ❑❑❑❑ ------------------------------------- -- - - ------------------ ------ ------------------------------------------------------------ ❑ ❑ ❑ �i - - - ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 00111 ❑ ❑ ! ❑ ❑ Door t 12/S1.4 4/S1.4 5'-0" 10'-0" 21,=�„ 3# 3/S1.4 200 I N I N Plan Notes � 2 0 LEGEND Stormwater Detention Vault Lid Plan 1. SEE CIVIL DRAWINGS FOR PIPE INLET DIAMETERS, LOCATIONS AND INVERTS. ITOV INSIDE TOP OF VAULT Scale: 3/16" = 1'-0" SEE 9/S1.2 FOR ADDITIONAL WALL REINFORCING AROUND PIPE PENETRATIONS. VAULT INLET OR OUTLET PER CIVIL DRAWINGS 2. SEE PLANK MANUFACTURER PLACEMENT PLAN FOR INSTALLATION. EXTENT OF 8" CONCRETE CURB EXTENDING ABOVE TOP OF VAULT POUR SLOT PER PLANK MANUFACTURER HOLLOW CORE PLANK PER MANUFACTURER � TN/s SHEET Bu/c � AFORRZ #4 (2)-#5 CONT IN CLOSURE #5 x 4'-0" EA. VOID W/ POUR SLOT (2 min. per plank) (2)#5 HORZ ® TOP OF WALL o #4 VERT C 6"oc W/ STD I HOOK IN CLOSURE AND rn 180-DEG STD HOOK AT BOT OF HEADER (3) #6 x 10'-0" CONT CENTERED OVER 5-0" WIDE OPENING HOLLOW CORE PLANK PER MANUFACTURER R=377619 poo��ooQ CONT. BACKER ROD IF REQD GROUT JOINT r4apo NOW ANEW rr I SWENSON SAS` FAT A STRUCTURAL ENGINEERING CORPORATION 2124 Third Avenue - Suite 100 - Seattle, WA 98121 ph: 206.443.6212 fax:206.443.4870 www.swensonsayfaget.com -15 C m K 100 z m M M 0 D DRAWN: RWG 0 a Q _ D C n DESIGN: RJA D D CHECKED: A z RJA M APPROVED: T Io ABB v z z m REVISIONS: Review Response Sept. 17, 2014 AReview Response Oct. 22, 2015 PROJECT TITLE Talbot & 55th Ave Plat Detention Vault S 192nd St. Renton, WA 98055 DATE: February 24, 2014 PROJECT N0: 10192-2014-01-00 SHEET NO: S 1,93 O SD /z/''� 4I z 3 C3 m M a o d v i a m 1 w b a 9 10 Header Reinforcing Plank -to -Plank Grout Joint 12 i NO: OF SHEETS: