HomeMy WebLinkAboutTED4003776.3PORTION OF THE NE 1/4 OF SECTION 6, TWP. 22 N., RGE. SE., W.M.
KING COUNTY, WASHINGTON
-d C
z �
A 0
m m
N z
m
CD
Q
i\ V RIM= 126.9b
iW1 i INV=103.26 ("CTR. CHANNE
A\ INV=1 19.47 (ABANDONED
/W-
3
-n �F AVEMENT , SOUTH 55TH STREET
- - - #10 00 INV=139. 1� \ OF R.O.W.
-- o- _
_ - 11+
C L
o - - - - -! - - -- - - ! 00 12+00 4SIS OF BEARn
K-- - - - -
�� `�'� S - i - --- f
rY�
I '267.42' 12" COP.! E 131.86'
I �
SCALE: I " = 30'
30 15 0 30 60
Know whairs below.
Call before you dig.
UTILITYCONFLICT NOTE.
CAUTION. -
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE
PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL
AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE
CALLING UTILITY LOCATE @ 1-800-424-5555 POTHOLING ALL OF THE EXISTING
UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY
WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN
ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND
ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR
SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL
PROBLEMS PRIOR CONSULT TO PROCEEDING WITH CONSTRUCTION.
T� SF SF
30' � \
EX. R.O.W. \
z
t
0
0
�
t
o j.
N
Ln
0
o
0
0
z
0
0
0
30' 30'
EX. R.O. W. EX. R.O. W.
SSMH
RIM= 1 15.38
INV=105.61 l S'
r�
INV=105.'1
i
i
30�
/ to
i WHEEL WASH
OR TIRE BATH
_ SST LOCATION A
HOUSE
w
0
99-
z •
S89'54'28'E 135.23'
X_X_T_�
�1 I IT
y
TEMP
-K]
VEG ,
/ �28
_4S
�, MU
DT i
IT
ORANGE
BARRIER
FENCE
3S -is •
N 88 27 05 W 352.63'
00
1*1
TEMP.
CONSTRUCTION
ENTRANCE
13+00
A
SSMH
RIM=171.92
INV=162.86 (CTR.
CHANNEL E, W)
i
c - 14.+-00
--
1 i M
I
INV=17�.8? x
W
q� + 14+94.63
S 01 '3255" W > \r f PA,
10.00, T O
12 k'MP
S 88'27'05" E 86.47'
t?/W
` GRAVEL & 1
I �
CRAS$ a
C
PL '� ✓ D�Iwr/ , EROSION CONTROL NOTES
i 1. THESE NOTES SHALL APPEAR FOR ALL PROJECTTS- SITE IMPROVEMENTS, SURFACE
TEMP, / WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
STOCKPILE 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION
AREA I MEETING MUST BE HELD WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION
AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY FLAGGED BY SURBEY TAPE OR
MU 'vim` FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF
THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING
THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE
PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC
CL
SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4.
STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT ADDITIONAL
MEASURES, SUCH AS CONSTUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE
REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO
ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5.
ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACITLITIES MUST BE CONSTRUCTED
AND IN OPERAAION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT
CL
TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS
COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION,
MAINTENANCE, REPLACEMENTS AND ADDITIONS TO EROSION/SEDIMENT CONTROL SYSTEMS
SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6.
THE EROSION AND SEDIMENTATION CONTROL SYSTEM DEPICTED ON THIS DRAWING ARE
INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL
FACILTIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION
AND RESPONSIBILITY OF THE PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY
BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND
ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT
,6
PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7.
APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES
NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF
PIPE, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
nN 8_
ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAYS EMBANKMENTS, THAT WILL NOT
'n
BE DISTRUBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH
MARCH 30TH ) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH
o
SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER
V,
METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9.
WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO
ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE,
UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS.
10.
COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE
SURFACE WATER DESIGN MANUAL.
11,
ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE
ADDRESSED WITHIN SEVEN (7) DAYS.
12.
THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A
MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13.
AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO
ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL
BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM,
14.
DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECTS
DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE
THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING OR PLASTIC COVERING.
15,
ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORAY SETTLING BASIN
SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION
ULTIMATELY AS AN INFILTRATION ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE
OF THE PERMANENT FACILITY.
16.
PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTRUBED AREAS SHALL
BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE
WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ON WEEK OF THE
BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND
THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON
FOR REVIEW.
17.
THE SOIL MOISTURE HOLDING CAPACITY OF ALL NEW PERVIOUS SURFACE THAT A
PROJECT COMPLETION WILL NOT BE COVERED BY IMPERVIOUS SURFACE OR
INCORPORATED INTO A DRAINAGE FACILITY MUST BE PROTECTED. THE DUFF LAYER AND
NATIVE TOPSOIL SHALL BE RETAINED IN AN UNDISTURBED STATE TO THE MAXIMUM
EXTENT FEASIBLE.
18.
ANY DUFF LAYER OR TOPSOIL REMOVED DURING GRADING SHALL BE STOCK PILED
ONSITE IN A DESIGNATED, CONTROLLED AREA NOT ADJACENT TO PUBLIC RESOURCES
AND CRITICAL AREAS. THE MATERIAL SHALL BE REAPPLIED TO OTHER PORTIONS OF THE
SITE WHERE FEASIBLE
19.
THE SOIL IN ANY AREA THAT HAS BEEN COMPACTED OR THAT HAS HAD SOME OR ALL
OF THE DUFF LAYER OR UNDERLYING TOPSOIL REMOVED SHALL BE AMEDED TO
MITIGATE FOR LOST OF MOISTURE -HOLDING CAPACITY. THE AMENDMENT SHALL TAKE
PLACE BETWEEN MAY I AND OCTOBER 1. REPLACED TOPSOIL SHALL BE A MINIMUM 8
INCHES THICK. REPLACED TOPSOIL SHALL HAVE AN ORGANIC MATTER CONTNT BETWEEN
8 AND 13 PERCENT DRY WEIGHT AND A PH SUITABLE FOR THE PROPOSED LANDSCAPE
PLANTS.
20.
DUST CONTROL MEASURES SHALL BE APPLIED TO PROJECT SITE.
STRUCTURAL NOTES
1.
THESE PLANS ARE APPROVED FOR STANDARD ROAD AND DRAINAGE IMPROVEMENTS
ONLY. PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS
REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.
2.
ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION
CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS.
ALL ROCKERIES IN CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
R=377603
NOTE. -
REFER TO SWPPP INCLUDED IN TIR.
EROSIONAND SEDIMENT CONTROL
RECOMMENDED CONSTRUCTIONSEQUENCE
1. PRE -CONSTRUCTION MEETING.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR
(MAY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION
SIGN).
3. FLAG OR FENCE CLEARING LIMITS.
4. INSTALL CATCH BASIN PROTECTION IF REQUIRED,
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7. CONSTRUCT SEDIMENT PONDS AND TRAPS,
8. GRADE AND STABILIZE CONSTRUCTION ROADS.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE
SLOPE DRAINS, ETC.)
SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT
DEVELOPMENT.
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH
APPENDIX D OF THE SURFACE
WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES
SO THAT AS SITE CONDITIONS
CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN
ACCORDANCE WITH THE CITY'S
EROSION AND SEDIMENT CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN
DAYS DURING THE DRY
SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD
FIBER MULCH, COMPOST,
PLASTIC SHEETING OR EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30
DAYS,
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE
STABILIZED AND BMPS REMOVED IF APPROPRIATE.
D
n
0
m 0
0
c
U)
71
61
r
a n •
a p z
Z
c
N
z
z
m
0
D
m
z
0
C
ai
m
0
z
'
�
O
C
y
D
O
m
m 0
0
D
n c
c ccn
m
z
Gi
z