Loading...
HomeMy WebLinkAboutTED4003776.4EROSION AND SEDIMENTATION CONTROL NOTES S.C.E. NOTES: ���.�....�� ...�...� 1. SEE ADJACENT DETAIL. 2. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS. GRAB TENSILE STRENGTH (ASTM D-4751).....................200 PSI GRAB TENSILE ELONGATION (ASTM D-4632)..................307 MAX. MULLEN BURST STRENGTH (ASTM D-3786-80A)........... 400 PSI MIN. AOS (ASTM D-4751)...................................... ..... ....... ...... 20-45 (U.S. STANDARD SIEVE SIZE) J. HOG FUEL MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. THE EFFECTIVENESS OF HOG FUEL IS HIGHLY VARIABLE, BUT IT HAS BEEN USED SUCCESSFULLY ON MANY SITES. IT GENERALLY REQUIRES MORE MAINTENANCE THAT QUARRY SPALLS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. HOG FUEL IS PROHIBITED FROM PERMANENT ROADBEDS BECAUSE ORGANICS IN THE SUB -GRADE SOILS CAUSE DIFFICULTIES WITH COMPACTION. 4. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 5. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. STABILIZED CONSTR UCTION ENTRANCE NOT TO SCALE ROCK MUST COMPLETELY COVER THE BOTTOM AND SIDES OF THE DITCH 6" MIN. L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION 4 ROCK CHECK DAM L� NOT TO SCALE Ail Know what's below. Call before you dig. UTILITY CONFLICT NOTE. CAUTION. - THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR CONSULT TO PROCEEDING WITH CONSTRUCTION. o 24" MIN. JOINTS IN FILTER FABRIC MATERIAL SHALL BE SPLICED AT POSTS. USE STAPLES OR WIRE RINGS OR EQUIVILENT TO ATTACH FABRIC TO POSTS PORTION OF THE NE 114 OF SECTION 6, TWP. 22 N., RGE. SE., W.M. KING COUNTY, WASHINGTON 2 x2" BY 14 GAUGE WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED z 1 � N � 1, 2"W WOOD POSTS STEEL FENCE POST, REBAR OR EQUIVALENT - BURY BOTTOM OF FILTER MATERIAL 7__ IN MINIMUM 4"x4" TRENCH 6' MAXIMUM MAY BE INCREASED TO 8' IF WIRE BACKING IS USED 2"x4" WOOD POSTS STEEL FENCE POST, REBAR OR EQUIVALENT FILTER FABRIC 2"x2" BY 14 GAUGE WIRE OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED z N � 2y'�V 4ESS AREA BACKFILL TRENCH WITH NATIVE SOIL OR 3/4"-1.5" WASHED GRAVEL �, z MINIMUM 4"x4" TRENCH - SILT FENCE NOTES : 1. SEE ADJACENT DETAIL 2. THE GEOTEXTILE USED MUST MEET THE FOLLOWING SPECIFICATIONS: AOS (ASTM D-4751) 30-100 SIEVE SIZE FOR SILT FILM 50-100 SIEVE SIZE FOR OTHER FABRICS WATER PERMITTIVITY (ASTM D-4491) 0.02 SEC -1 MINIMUM GRAB TENSILE STRENGTH (ASTM D-4632) 180 LBS MIN. FOR EXTRA STRENGTH FABRIC 100 LBS MIN. STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM D-4632) 30%% MAX. ULTRAVIOLET RESISTANCE (ASTM D-4355) 70% MIN. A COPY OF THE MANUFACTURERS' FABRIC SPECIFICATIONS MUST BE AVAILABLE ONSITE 3. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 4. WHERE THE FENCE 1S INSTALLED, THE SLOPE SHALL BE NO STEEPER THAN 2H:1 V. 2 SILT FENCE DETAIL l� NOT TO SCALE z 2:1 MAX SLOPE LEVEL BOTTOM k. 2 MIN. ' � =x�- SWALE SPACING DEPENDS ON SLOPE GRADIENT S INTERCEPTOR SWALE 4 NOT TO SCALE rRATF INSERT NOTES : 1. ANY ACCUMULATED SEDIMENT ON OR AROUND THE FILTER FABRIC PROTECTION SHALL BE REMOVED IMMEDIATELY. SEDIMENT SHALL NOT BE REMOVED WITH WATER, AND ALL SEDIMENT MUST BE DISPOSED OF AS FILL ON SITE OR HAULED OFF SITE. 2. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE STORAGE. 3. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. 3 CATCH BASIN INSERT CROSS-SECTION !.� NOT TO SCALE N-1 t.^ C-V-**, d 4&*A ffw 2 , *V(s fK-Nwm P%%4xmw m mesl! Rhwnnu s pueshmm waw"mm Robes m.om S)mphoncarp�s aas Dots fir C'esars ud, r roe-oowenng annnt r►trcrwbc>t N 16' OO.( 5 bra C O_C 2 melon i _ 5 8 PSM 12 RUP 24 M 12 K 24 S 6 MITIGATION AREA PLANTING PLAN LJ NOT TO SCALE 1. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.) 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING, IF REQUIRED, PRIOR TO CONSTRUCTION (SWDM APPENDIX D). DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. 5. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. 6. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G. ADDITIONAL COVER MEASURES, ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, PERIMETER PROTECTION ETC.). 7. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESC FACILITIES. 8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 10. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. 11. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 12, ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 13. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL. 14. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE DDES INSPECTOR FOR REVIEW. SEASONAL CLEARING AND GRADING NOTES: APPLICABLE FROM OCTOBER 1 THROUGH APRIL 30. 1. THE ALLOWED TIME THAT A DISTURBED AREA CAN REMAIN UNWORKED WITHOUT COVER MEASURES IS REDUCED TO TWO DAYS, RATHER THAN SEVEN. 2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS. J. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE. 4. ALL AREAS THAT ARE TO BE UNWORKED WITHIN THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON, OCTOBER 1 TO MARCH 31. 5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS. 6. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SITE. 7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE -GRAINED SOIL. 8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFF SITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFF SITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. R=377604 Z �_ CD C mo 30 01 ul z m z m m In D 1 D T O m 0 o O o 0 m cd m m � D � D = m z � c � m = rnLp m 01 N z m 0 D I T O ?o D < A z Sm G z/� G C 9 m m O m D z 0