LEGEND
EXISTING
PROPOSED
SANITARY SEWER, FLOW DIRECTION
❑
POWER BOX
LIGHT POLE
04
SANITARY SEWER MANHOLE
E
UNDERGROUND POWER (PAINTED LOCATION)
FIRE HYDRANT
ASPHALT RESTORATION
WATER VALVE
W
WATER LINE (PAINTED LOCATION)
TELEPHONE RISER
- C -
UNDERGROUND COMMUNICATION (PAINTED LOCATION)
CB ❑
CATCH BASIN
D
STORM DRAIN LINE/ CULVERT
GAS VALVE
T.E.S.0
GAS METER
UNDERGROUND GAS LINE (PAINTED LOCATION)
SMH SEWER MANHOLE
SCO O
SEWER CLEANOUT
0
0 0
SILT FENCE
S
SEWER LINE
x
ORANGE CONSTRUCTION FENCE
0'-0"E
SET HUB W/PIPE DEPTH PER LOCATOR
O
CB PROTECTION
52.00
64"-76'*
GROUND ELEVATION/POT HOLED UTILITY DEPTH
Q
1�
INLET/OUTLET PROTECTION
EDGE OF PAVEMENT
SURVEY NOTES:
THE MAJORITY OF THE SURVEY INFORMATION SHOWN IN THE ATTACHED PLAN HAS
BEEN PROVIDED BY WSDOT.
PER THE 1-405 SR 167 IC/DC PROJECT REFERENCE DOCUMENTS SECTION 2.5.2.1:
WSDOT PREPARED AND UPDATED MAPPING FOR PROJECT USING 2013
AERIAL PHOTOGRAMMETRY AND TOPOGRAPHIC SURVEYS. PRIMARY AND
SECONDARY SURVEY HORIZONTAL AND VERTICAL CONTROLS WERE
ESTABLISHED BY WSDOT WITH GIPS EQUIPMENT IN WASHINGTON STATE
COORDINATE SYSTEM, NORTH ZONE. HORIZONTROL CONTROLS ARE BASED
ON THE NORTH AMERICAN DATUM OF 1983 (NAD 83/91)AND VERTICAL
CONTROLS ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD 88) AND AS SPECIFIED AS <0.005M (± LINEAR UNCERTAINTY).
WSDOT HAS SUPPLIED AN ELECTRONIC DIGITAL TERRAIN MODEL (INROADS
FORMAT) AND 2D MICROSTATION .DGN FILES COMPRISED OF
PHOTOGRAMMETRIC AND TOPOGRAPHIC SURVEY DATA IN PROJECT DATUM
COORDINATES CONVERTED FROM STATE PLANE COORDINATES USING A
COMBINED FACTOR OF 1.000006285.
Stantec
11130 NE 33rd Place, Bellevue WA 98004
phone: (425) 869-9448 www.stantec.com
B1?60 1� pwAS� j
Y m,
37847
GISTS
SjONAL
CONSTRUCTION SEQUENCE
1. ATTEND PRE -CONSTRUCTION MEETING AND PERMIT COMPLIANCE MEETING,
AS REQUIRED BY PERMIT.
2. OBTAIN NOTICE TO PROCEED FROM CITY AND ALL REQUIRED PERMITS
BEYOND THOSE PROVIDED BY CITY AND WSDOT (SEE SPECIFICATIONS)
PRIOR TO COMMENCING WORK.
3. COORDINATE WITH CITY / ENGINEER FOR CONSTRUCTION STAKING. STAKING
TO BE PROVIDED BY CONTRACTOR.
4. INSTALL PERIMETER PROTECTION, TEMPORARY EROSION AND SEDIMENT
CONTROLS, AND BMPS.
5. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY AND
WSDOT STANDARDS AND THESE PLANS AND SPECIFICATIONS THROUGHOUT
THE PROJECT.
6. CLEAR AND ROUGH GRADE SITE.
7. CONSTRUCT HORIZONTAL DIRECTIONAL DRILL SECTION OF SANITARY SEWER
MAIN.
8. CONSTRUCT OPEN CUT SECTION OF SANITARY SEWER MAIN SOUTH OF 1-405
PER PLANS. REFER TO SSMH 006A INSTALLATION NOTES AND SSMH 009
INSTALLATION NOTES.
9. UPON COMPLETION OF SANITARY SEWER ALIGNMENT FROM SOUTH 14TH
STREET TO SMITHERS AVE SOUTH, INSTALL TEMPORARY GRAVEL ACCESS
ROAD TO APPROXIMATE FINISHED GRADE, AS SHOWN ON PLANS. ADJUST
RIM ELEVATIONS OF NEW SSMHS AS NECESSARY TO MEET ADJUSTED GRADE
ELEVATIONS.
10. CONSTRUCT GUIDED PIPE RAM SECTION OF SANITARY SEWER MAIN.
COMPLETELY REMOVE TEMPORARY SHORING SYSTEM OF BOTH SHAFTS TO
PREVENT CONFLICTS WITH FUTURE IMPROVEMENTS.
11. CONSTRUCT OPEN CUT SECTION OF SANITARY SEWER MAIN NORTH OF 1-405.
12. PERFORM LEAKAGE TESTING AND TELEVISION INSPECTION OF NEW
SANITARY SEWER MAIN.
13. OBTAIN CITY APPROVAL BEFORE TRANSFERRING SEWAGE TO NEW SANITARY
SEWER MAIN. CONNECT TO EXISTING SANITARY SEWER SYSTEM. REFER TO
SWITCHOVER SEQUENCE.
14. CCTV THE EXISTING SEWER MAIN BETWEEN SSMH 2267 AND SSMH 2257 TO
CONFIRM NO CONNECTIONS. NOTIFY CITY AT LEAST 24 HOURS PRIOR TO
CCTV OF MAIN. IF NO CONNECTIONS ARE FOUND DURING CCTV OF MAIN,
PLUG EXISTING PIPE AT SSMH 2257 TO THE SOUTH. IF CONNECTION(S) ARE
FOUND, PLUG EXISTING PIPE AT SSMH 2267 TO THE SOUTH.
15. ABANDON EXISTING SANITARY SEWER FACILITIES AS SHOWN ON PLANS AND
AS REQUIRED IN ABANDONMENT SEQUENCE.
16. PERFORM SURFACE RESTORATION. RESTORE SITE NORTH OF 1-405 TO ITS
ORIGINAL CONDITION, UNLESS OTHERWISE REQUIRED BY WSDOT.
17. AFTER ALL DANGER OF EROSION HAS PASSED AND AFTER APPROVAL BY
CITY AND WSDOT, COORDINATE REMOVAL OR TRANSFER OF TEMPORARY
BMPS WITH FOLLOW-UP CONSTRUCTION PROJECTS.
18. PROVIDE CONSTRUCTION RECORD DRAWINGS.
NOTE: THIS IS A POSSIBLE SEQUENCE. FINAL SEQUENCE SHALL BE DEVELOPED
BY CONTRACTOR AND SUBJECT TO REVIEW BY OWNER.
SSMH 006A INSTALLATION NOTES:
1. INSTALL A TEMPORARY BYPASS SYSTEM AND PUMP SEWAGE FROM EXISTING
SSMH 2292 TO EXISTING SSMH 0057. CONTRACTOR CAN EXPECT A PEAK
FLOW RATE OF UP TO 25 GPM.
2. EXPOSE AND REMOVE APPLICABLE SECTION OF EXISTING 8" CLAY SEWER
MAIN,
3. INSTALL NEW SSMH 006A PER PLANS AND IN DETAIL 7, SHEET 10.
4. PLUG DROP CONNECTION TO PREVENT SEWAGE FROM ENTERING NEW
SYSTEM UNTIL THE CITY HAS APPROVED SWITCHOVER.
5. ONCE THE CONTRACTOR HAS RECEIVED APPROVAL FOR DEACTIVATION OF
EXISTING SYSTEM AND SWITCHOVER TO NEW SYSTEM, REFER TO
SWITCHOVER SEQUENCE, BELOW.
SSMH 009 INSTALLATION NOTES:
1. INSTALL A TEMPORARY BYPASS SYSTEM AND PUMP SEWAGE FROM EXISTING
SSMH 2270 TO EXISTING SSMH 2269. CONTRACTOR CAN EXPECT A PEAK
FLOW RATE OF UP TO 400 GPM.
2. INSTALL NEW SSMH 009 PER PLANS AND CONNECT TO EXISTING SYSTEM TO
NORTH AND SOUTH AS WELL AS NEW SYSTEM TO THE EAST.
3. PLUG CONNECTION TO NEW SYSTEM TO THE EAST UNTIL THE CITY HAS
APPROVED SWITCHOVER.
4. ONCE THE CONTRACTOR HAS RECEIVED APPROVAL FOR DEACTIVATION OF
EXISTING SYSTEM AND SWITCHOVER TO NEW SYSTEM, REFER TO
SWITCHOVER SEQUENCE, BELOW.
SWITCHOVER SEQUENCE
1. AT SSMH 001, CUT OUT TOP OF EXISTING PIPE IN SADDLE MANHOLE.
2. AT SSMH 003, CUT OUT TOP OF EXISTING PIPE IN SADDLE MANHOLE, AND
PLUG THE EXISTING PIPE TO THE NORTH.
3. AT SSMH 004 AND SSMH 005B, CUT OUT TOP OF EXISTING PIPE IN SADDLE
MANHOLE, AND PLUG THE EXISTING PIPE TO THE NORTH. CONTRACTOR TO
START WITH THE MOST DOWNSTREAM MANHOLE (SSMH 004) AND WORK ITS
WAY UPSTREAM TO SSMH 007.
4. AT SSMH 006A, REMOVE THE TEMPORARY PLUG FROM THE BOTTOM OF THE
DROP CONNECTION AND CUT AND REMOVE THE TEMPORARY 8" PVC PIPE
WITHIN THE MANHOLE. REFERENCE SSMH 006A INSTALLATION DETAIL ON
THE DETAIL SHEET.
5. AT SSMH 007, CUT OUT TOP OF EXISTING PIPE, AND PLUG THE EXISTING PIPE
TO THE NORTH.
6. CONNECT EXISTING SIDE SEWER FOR PARCEL 3340401545 TO NEW SANITARY
SEWER SYSTEM. CUT AND CAP EXISTING SIDE SEWER CONNECTION TO
EXISTING SANITARY SEWER SYSTEM.
7. AT SSMH 009, REMOVE THE TEMPORARY PLUG AND PLUG THE EXISTING PIPE
TO THE NORTH.
�S. WALIGO
pF WASH
SURVEYED: SCALE:
HORIZONTAL NAD D1988
1983/1991
DESIGNED: AS NOTED
3 s7 SMA
GISTV"?, �� DRAWN:
�SSIONAL E�����(0 CTM ONE INCH I DATUM
CHEiKSED: AT FULL SCALE
�/ n IF NOT ONE INCH
N 0. REVISION P DAr E AP P R APPROVED: SCALE ACCORDINGLY
Sys WALK
WA��
4ry 7J®
38087
0�� GISTER��
�SSIONAL
FOR CONSTRUCTION
RECORDS ONLY
REVISED TO INDICATE
CONSTRUCTION RECORDS
FIELD REP: SCARSELLA BROS
REVISED BY: IZABELLA MIROCHNIK
DATE: 6-3-2017
CONTRACTOR: SCARSELLA BROS
'6R
C T Y OF
"L
It RENTON
Planning/Building/Public Works Dept.
S=381202
RECORD DRAWING
These drawings have been prepared based on
information provided by others. Stantec has not verified
the accuracy and/or completeness of this information
and shall not be responsible for any errors or omissions
which may be incorporated herein as a result.
CRD2of11
TALBOT HILL SEWER RELOCATION -
1-405, SR167 IC/DC PROJECT
WWP-27-3812
NOTE SHEET
DATE:
7/10/2017
FIELDBOOK:
PAGE:
DRAWING NO:
SHEET: OF:
2 11
�m
CD
c �
C7
=
C:
mC:)
m
Cy
m
I
u
7
z
m
�.
O
D
D
n
0
m00
O
roc
' m C-)
W M
D
' fzf1
M°
;mm
R) z
z
m
0
D
H
a
r
t�
0
x
r
Hr
oz
a w1l
UQ ~ P
o Cn
.p.
�tTl 1
r coo
C)
a
N
°z
D
n
o
M 0
00
D
�c
ED
co
2