HomeMy WebLinkAboutWWP2703812.3t BASELINE "S 14TH ST"
PT#
STATION
NORTHING
EASTING
DESCRIPTION
100
10+00.00
173397.50
12-98535.16
BEGIN BASELINE
101
10+18.28
173412.86
1298545.09
ANGLE POINT
102
11 +27.40
173457.98
1298644,43
ANGLE POINT
103
20+63.51
173634.57
1299563.74
ANGLE POINT
104
23+01.95
173687.56
, 1299796.22
I ANGLE POINT i
105
25+86.24
173712,43
1300079.40
END BASELINE
cm
PT#
i 106 I
107
NUMBER
5404
5405
28
z
0
V)
Of
n
E
0
N
N
C
L
V
0
L
LJ
V)
LINE
START PT
END PT
BEARING
LENGTH
L1
100
101
N32°52'02"E
18.28'
A 5405 A
404
Stantec
11130 NE 33rd Place, Bellevue WA 98004
phone: (425) 869-9448 www.stantec.com
SCALE
80 G 80 160
(FEET)
1 INCH = 80 FT
wALIpO
A 7
ISV�G.�IONAL �
REVISED TO INDICATE I
CONSTRUCTION RECORDS !
FIELD REP:_
REVISED BY:
DATE:
CONTRACTOR
SCARSELLA BROS
IZABELLA MIROCHNIK
6-13-2017
SCARSELLA BROS
V
FOR CONSTRUCTION
RECORDS ONLY
i REVISIONS PER WSDOT'S COMMENTS. SMA /22/16 SURVEYED: C L
VERTICAL- NAVD 1988
DESIGNED:
1 n=60' HORIZONTAL: NAD 1983/1991
SMA
DRAWN.
CTM ONE INCH DATUM
CHECKED: AT FULL SCALE
ELB IF NOT ONE INCH
N O. REVISION BY DATE A P P R APPROVED: SCALE ACCORDINGLY
RECORD DRAWING
These drawings have been prepared based on
information provided by others. Stantec has not verified
the accuracy and/or completeness of this information
and shall not be responsible for any errors or omissions
which may be incorporated herein as a result.
CRD 3 of 11
101161 CITY OF
RENTON
P!anning/Building/Public Works Dept.
Q
0
co
a
S=381203
..J...L L �hp�� 1.W ALIG0 1
tiG , of WAs� j ., s �1 OF WASIyJ ��, �� of WAs�I
rn
1
to': 'o
�.� . 36802 37847
ssf�`1'ALSLAN� IO STEg �± j��'�,SEGISTER
NAL E SIONAL E
TALBOT HILL SEWER RELOCATION -
1-405, SR167 IC/DC PROJECT
WWP-27-3812
CONSTRUCTION BASELINE
L11[
7/10/2017
FIELDBOOK:
PAGE.
DRAWING NO:
SHEET OF
3 11
D
f�1
a z
lJ J
rn
z
z
m C
C
M
rn-
Cn
z
m
3
0
UD
C
I
D
D
n
0
o0
�o
c
M�
-o
D
�z
Cm
C
W�
D m
m-
C�
N z
z
m
C
D
D
UJ
m
M
a
r
0
y
x
r
�a
oz
y
xy
i
r
coo
n
a
�
C
0
z
cn
D
T
C
M
MM
O
D
D
O