Loading...
HomeMy WebLinkAboutTED4703897.7Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) SE 1/4 SECTION 31, TOWNSHIP 23 N, RANGE 5 E, W.M. VUECREST ESTATES & WECREST mSHORT PLAT FOR FENCE DETAIL AND C73 PUH CHU,-L;IIUIV hUH UL IAIL� *50'1 W 606.90 D.R. STRONG CONSUL TING ENGINEERS ENGINEERS PLANNERS SURVEYORS 620 7TH AVENUE, KIRKLAND, WA 98033 0 425.827 3063 F 425.8272423 1 CITY COMMENTS, REVIEW 1 hW 03,22,1E SURVEYED::. si, s 2 CITY COMMENTS REVIEW 2 hW 06.06.16 MAJ DESIGNED: MAJ 3 MY COMMENTS. REVIEW 3 MAJ 08.12.16 MAJ DRAWN: YLP CHECKED: MAJ H0. REVISION BY DATE I APPR APPROVED: MAJ PA VEMEN T WIDTH TRANSITIONS EL. 37 37 EL. 376.0 376.13 Q 376.21 �J EL. 376.1 EL. 3 5.45 rd ADA RAMP DETAILS PER WSDOT STANDARD PLAN F-40.15-02, SEE SHEET C11 VUECRES T II SHOR T PL A T U150072,32 EL. 375.37 L. �a EL. 175.45 R=389707 VUECREST ES TA TES SITE VOLUME CALCULATIONS CUT VOLUME FILL VOLUME NET VOLUME (CU. YDS) (CU. YDS) (CU. YDS.) 16,105 5,719 10,386 EXPORT (INCLUDES VAULT) ALL VOLUMES ARE APPROXIMATE AND REPRESENT EXCAVATION FOR RESIDENCE AS PROPOSED. THE VOLUMES DO NOT INCLUDE EXPANSION FACTOR OR ANY SOIL TYPE RESTRICTIONS THE VOLUMES DO NOT INCLUDE STRUCTURAL EXCAVATION FOR BUILDINGS. GEO TECH RECOMMENDA TIONS.• THE FOLLOWING PERTAINS TO THE GENERAL SITE ONLY. CULVERT RECOMMENDATIONS CAN BE FOUND WITHIN THE CULVERT DESIGN DOCUMENTS. EARTH SOLUTIONS NW LLC STATES THAT BASED ON THE RESULTS OF THE STUDY PERFORMED, THE PROPOSED STRUCTURES CAN BE SUPPORTED ON CONVENTIONAL SPREAD AND CONTINUOUS FOUNDATIONS BEARING ON UNDISTURBED COMPETENT NATIVE SOIL OR STRUCTURAL FILL. WHERE LOOSE, ORGANIC, OR OTHER UNSUITABLE MATERIALS ARE ENCOUNTERED AT OR BELOW THE FOOTING SUBGRADE ELEVATION, THE MATERIAL SHOULD BE REMOVED AND REPLACED WITH STRUCTURAL FILL OR CRUSHED ROCK, AS NECESSARY. IN -SITU SOILS FROM A GEOTECHNICAL STANDPOINT, THE SOILS ENCOUNTERED AT THE TEST PIT LOCATIONS ARE GENERALLY SUITABLE FOR USE AS STRUCTURAL FILL. HOWEVER, SUCCESSFUL USE OF THE ON -SITE SOILS WILL LARGELY BE DICTATED BY THE MOISTURE CONTENT OF THE SOILS AT THE TIME OF PLACEMENT AND COMPACTION. THE SITE SOILS WERE GENERALLY IN A MOIST CONDITION AT THE TIME OF EXPLORATION (FEBRUARY 2013). SOILS ENCOUNTERED DURING SITE EXCA VA TIONS THA T ARE EXCESSI VEL Y OVER THE OPTIMUM MOISTURE CONTENT WILL REQUIRE MOISTURE CONDITIONING PRIOR TO 376.03 PLACEMENT AND COMPACTION. EL. 376.13 BASED ON THE CONDITIONS ENCOUNTERED DURING FIELDWORK, THE SITE SOILS HAVE A MODERATE TO HIGH SENSITIVITY TO MOISTURE. DURING PERIODS OF DRY WEATHER, THE ON -SITE SOILS SHOULD GENERALLY BE SUITABLE FOR USE N AS STRUCTURAL FILL, PROVIDED THE MOISTURE CONTENT IS AT OR NEAR THE OPTIMUM LEVEL AT PERIODS OF EXTENDED PRECIPITATION WILL BE DIFFICULT. IF THE ON -SITE SOILS CANNOT BE SUCCESSFULLY COMPACTED, THE USE OF AN IMPORTED SOIL MAY BE NECESSARY. IMPORTED SOIL INTENDED FOR USE - EL. 376.21 AS STRUCTURAL FILL SHOULD CONSIST OF A WELL GRADED GRANULAR SOIL 376.11 WITH A MOISTURE CONTENT THAT IS AT OR NEAR THE OPTIMUM LEVEL. DURING WET WEATHER CONDITIONS, IMPORTED SOIL INTENDED FOR USE AS STRUCTURAL FILL SHOULD CONSIST OF A WELL GRADED GRANULAR SOIL WITH A FINES CONTENT OF FIVE PERCENT OR LESS DEFINED AS THE PERCENT PASSING THE #200 SIEVE, BASED ON THE MINUS THREE-QUARTER INCH FRACTION. STRUCTURAL FILL STRUCTURAL FILL IS DEFINED AS COMPACTED SOIL PLACED IN FOUNDATION, SLAB -ON -GRADE, AND ROADWAY AREAS. FILLS PLACED TO CONSTRUCT PERMANENT SLOPES AND THROUGHOUT RETAINING WALL AND UTILITY TRENCH BACKFILL AREAS ARE ALSO CONSIDERED STRUCTURAL FILL. SOILS PLACED IN STRUCTURAL AREAS SHOULD BE PLACED IN LOOSE LIFTS OF 12 INCHES OR LESS AND COMPACTED TO A RELATIVE COMPACTION OF 95 PERCENT, BASED ON THE LABORATORY MAXIMUM DRY DENSITY DETERMINED IN ACCORDANCE WITH THE MODIFIED PROCTOR METHOD. DRAINAGE GROUNDWATER SEEPAGE WAS OBSERVED AT ONE TEST PIT LOCATION AT A DEPTH OF SIX TO NINE FEET BELOW GRADE DURING FIELDWORK (FEBRUARY 2013). PERCHED GROUNDWATER SEEPAGE SHOULD BE EXPECTED IN SITE OR UTILITY EXCAVATIONS. TEMPORARY MEASURES TO CONTROL GROUNDWATER SEEPAGE AND SURFACE WATER RUNOFF DURING CONSTRUCTION WILL LIKELY INVOLVE INTERCEPTOR TRENCHES AND SUMPS, AS NECESSARY. IN THE OPINION OF EARTH SOLUTIONS NW LLC, PERIMETER FOOTING DRAINS SHOULD BE INSTALLED AT OR BELOW THE INVERT OF THE BUILDING FOOTINGS. PA VEMEN T RES TORA TION NO TES WITHIN CITY LIMITS, PAVEMENT RESTORATION SHALL BE PER C.O.R. STREET RESTORATION AND STREET OVERLAY STANDARDS AND/OR AS FIELD SPECIFIED BY THE CITY INSPECTOR. HALF STREET GRIND AND OVERLAY WILL BE REQUIRED AS THE MINIMUM RESTORA TION. BACK OF SIDEWALK SLOPE NOTE GROUND SLOPE BEHIND SIDEWALK SHALL NOT EXCEED 4: 1 FOR A DISTANCE OF THREE (3) FEET. AFTER THREE (3) FEET, SLOPE MAY BE INCREASED TO A MAXIMUM OF 2: 1. GRADE CHANGE BETWEEN LOTS GRADE CHANGE BETWEEN LOTS TO OCCUR AT PROPERTY LINES WITH FENCE TO BE PROVIDED BY THE BUILDER AT HOME CONSTRUCTION. BUILDING PERMI TS VAULT, CONCRETE BARRIER AND RETAINING WALL TO BE APPROVED UNDER SEPARA TE PERMIT. NORTH GRAPHIC SCALE 0 20 40 80 1 INCH = 40 FT. RECOMMENDED FOR APPOVAL BY: Date: BY: AI&A Date: —tom- BY: Date: BY: Date: SCALE: VERTICAL: NAVD �-- CITY OF VUECREST ESTATES & VUECREST II 09.28.15 AS NOTED HORIZONTAL: NAD 1983/83/1991 — � FIELDBOOK: R E N TO N ROAD AND GRADING PLAN PAGE: DRAWING N0; ONE INCH DATUM AT FULL SCALE Planning/Building/Public Works Dept. C9 IF NOT ONE INCH — SCALE ACCORDINGLY i ii -sw791 7 / i ji snn79 .�9 _ SHEET: OF: 9 A m z �< m = C Nz W 0 D D n oCD Q m �o D Z 03c c-0 z rT D - ��Zm _Z: z s �o Mm CY T U Nz m z m m 0 D o tri w� �y C � CD jCD 1 cr4 � t17 C)o� Zc P.t 1 W a 00 CD CD U? � D n o C3 r m 00 D �a C ki qggl 6 0 " R [LN 'A IFFFA