HomeMy WebLinkAboutTED4003904.9s --I<m
Y%/
c
C0
C
S
_O
y �
_ m
s
T Cy
cn �
Nz
m
m
O
D
m
v
Q—
C)
LL
E
c�
a�
a�
m
00
Ln
66
N
N
l0
rl
O
N
\
m
N
J
I
Lfi
00
00
O
E
w
a�
V)
I
c
0
Q
ry
V
u
c�
m
v
0
E
v
a%
I
l/)
Q
E
V
v
M
co
0
O
N
PLANT SCHEDULE
STRATUM
SCIENTIFIC NAME
COMMON NAME
WETLAND
INDICATOR
STATUS
CONTAINER
CLASS 'k
ON CENTER
(O.C.)
SPACING
TOTAL PLANT
QUANTITIES
PLANT ZONE QUANTITIES
ACCESS ROAD
AREA
SOUTH
STAGING
AREA
BYPASS PIPE
PLANTING
AREA
TREE
ACER MACROPHYLLUM
BIGLEAF MAPLE
FACU
Y2" CALIPER
10' O.C.
20
3
17
TREE
POPULUS BALSAMIFERA
BLACK COTTONWOOD
FAC
Y2" CALIPER
10' O.C.
20
3
17
SHRUB
AMELANCHIER ALNIFOLIA
SERVICEBERRY
FACU
CL 1
4' O.C.
82
82
SHRUB
CORNUS SERICEA
RED OSIER DOGWOOD
FACW
CL 1
4' O.C.
60
9
51
SHRUB
CORYLUS CORNUTA
BEAKED HAZELNUT
FACU
CL 1
4' O.C.
82
82
SHRUB
MAHONIA AQUIFOLIUXI
TALL OREGON GRAPE
FACU
CL 1
4' O.C.
82
82
SHRUB
PHYSOCARPUS CAPITATUS
PACIFIC NINEBARK
FACW
CL 1
4' O.C.
60
9
51
SHRUB
ROSA NUTKANA
NOOTKA ROSE
FAC
CL 1
4' O.C.
142
9
82
51
SHRUB
RUBUS PARVIFLORUS
THIMBLEBERRY
FACU
CL 1
4' O.C.
82
82
SHRUB
SALIX SITCHENSIS
SITKA WILLOW
FACW
CL 1
4' O.C.
60
9
51
SHRUB
SAMBUCUS RACEMOSA
RED ELDERBERRY
FACU
CL 1
4' O.C.
82
82
SHRUB
SYMPHORICARPOS ALBUS
SNOWBERRY
FACU
CL 1
4' O.C.
82
82
GROUNDCOVER
FRAGERIA VESCA
WOODLAND STRAWBERRY
FACU
SP 4
2' O.C.
363
55
308
GROUNDCOVER
POLYSTICHUM MUNITUM
SWORD FERN
FACU
SP 4
2' O.C.
2097
55
1734
308
GROUNDCOVER
TELLIMA GRANDIFLORA
FRINGECUP
FACU
SP 4
2' O.C.
363
55
308
GROUNDCOVER
TOLMIEA MENZIESII
PIGGYBACK PLANT
FAC
SP 4
2' O.C.
363
55
308
24" DIAMETER BARK OR
WOOD CHIP MULCH RING,
KEEP 2" AWAY FROM
TRUNK OF PLANT
FINISH GRAD
REMOVE CONTAINER PRIOR
TO PLANTING. DURING
PLANTING OPERATIONS
GENTLY LOOSEN AND
SPREAD ROOTS
EXCAVATE SOIL FOR PLANTING TO DIMENSIONS
SHOWN. FIRM SOIL AROUND ROOTBALL AND
WATER SETTLE. DO NOT LEAVE AIR POCKETS. DO
NOT DAMAGE ROOTS DURING PLANTING
OPERATIONS
COMPRESS SOIL INTO SMALL, FLAT
TOPPED MOUND BENEATH ROOTBALL
FOR SUPPORT
9
PLANT AT SAME
LEVEL AS GROWN
IN POT
6" GREATER
THAN
ROOTBALL OR
CONTAINER
_ DEPTH
X
IPLANTING HOLE/
EXCAVATION
' 2X GREATER '
THAN ROOTBALL
OR CONTAINER WIDTH
CONTAINER PLANTING DETAIL
24" DIAMETER BARK OR WOOD
CHIP MULCH RING, 4" THICK
LAYER, KEEP 2"
AWAY FROM?
�. TRUNI�XISTING GROUND
\ \� l
FINISH GRADE—/
REMOVE CONTAINER PRIOR TO PLANTING.
DURING PLANTING OPERATIONS GENTLY G
LOOSEN AND SPREAD ROOTS AT BOTTOM 0E-------
ROOTBALL G
EXCAVATE SOIL FOR PLANTING TO DIMENSIONS
SHOWN. FIRM SOIL AROUND ROOTBALL AND F
* CL 1 =
0.65 —
1.08
Gal Per ANSI
260.1
CL 2 =
1.38 —
2.05
Gal Per ANSI
260.1
SP 4
= 51 —63
Cubic
Inches a (1
Qrt)
PLANT AT SAME
LEVEL AS GROWN
IN POT
—I MAX.
WATER SETTLE. DO NOT LEAVE AIR POCKETS.
DO NOT DAMAGE ROOTS DURING PLANTING
OPERATIONS
PLANTING HOLE/
COMPRESS SOIL INTO SMALL, FLAT EXCAVATION
3X GREATER
TOPPED MOUND BENEATH ROOTBALL
FOR SUPPORT THAN ROOTBALL
OR CONTAINER WIDTH
APPROVED: TOM BEAN 2 2016
FIELD BOOK:
PROJECT
SURVEYED: -- -- MANAGER: TOM BEAN 2 2016
SURVEY BASE MAP: DESIGNED: ERIK PETERS 2 2016
__ _ PROJECT No,
-- -- CONTRACT No.
CHECKED:
DESIGN ENTERED: KAY KITAMURA
2016
CONTAINER PLANTING ON SLOPE DETAIL
1120590
C01043C16
6" GREATER
THAN
ROOTBALL OR
CONTAINER
DEPTH
NOTES:
1. REMOVE ANY NOXIOUS AND/OR NONNATIVE WEEDS FROM
PLANTING ZONES PRIOR TO PLANTING.
2. THE PROJECT REPRESENTATIVE SHALL APPROVE GRADES PRIOR
TO MULCH APPLICATION AND PLANT INSTALLATION.
3. PLANT SUBSTITUTIONS ARE SUBJECT TO APPROVAL BY THE
PROJECT REPRESENTATIVE.
4. TAG PLANTS FOR IDENTIFICATION AND APPROVED BY THE
PROJECT REPRESENTATIVE PRIOR TO INSTALLATION.
5. KEEP PLANTS SHADED UNTIL TIME OF PLANTING. DO NOT LET
PLANT MATERIAL SIT IN SUN OR DRY OUT BEFORE PLANTING.
6. PLANT GROUNDCOVER AND SHRUBS IN CLUSTERS OF THREE,
FIVE, AND SEVEN. EACH CLUSTER SHALL BE ONE SPECIES.
EVENLY SPACE CLUSTERS THROUGHOUT PLANT ZONES, INTENT
OF PLANTING IS TO APPEAR NATURAL AND INFORMAL.
7. THE PROJECT REPRESENTATIVE SHALL APPROVE PLANT LAYOUT
BEFORE INSTALLATION.
8. INSTALL SHRUBS, AND GROUNDCOVER BETWEEN OCTOBER 1
AND MARCH 1 OF THE FIRST DORMANT SEASON FOLLOWING
CONSTRUCTION.
LQ King County
Department of Natural Resources and Parks
Water and Land Resources Division
Regional Services Section
Christie True, Director
Recommended for Approved
By C&'---- Deb-7 f ( 1 l6
R=3 90409
CALL 2 WORKING DAYS
BEFORE YOU DIG
1-800-424-55M
(UNDERGROUND UTILITY LOCATIONS ARE APPROX)
SHEEP
BLACK RIVER PUMP STATION L2
SEDIMENT REMOVAL of
9
PLAIVTNQ 9CHEDlLE AND DETALS SHEETS
2011-06
D
n
0
mp
loo
D
Dm
� C:
0
'gym
'U�
Nz
z
m
0
D
y
Cd
r'
u
lrT-JI
�d o tTlCD
1
CD b
ot C
I'D �db
Q
1
y
z
Q
NUM.
REVISION
BY I DATE
0e a 3g1a4,97