Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTED4003920.3114008
Q'
w
o�
W M I N.E. 1/4 SEC.22,T.23N.,R.5E.,W,M,
S.E. 1/4 SEC.223T.23N.3R.5E., , , NORTHir
EXIST. 20 FT.
SCALE Q� �, v W v
r SAN. SEW. EASE ENT P O
0 50 100 150 KCAS ti
1
~- - RENTON PARKS / i\\
_ �' �`"- •.. TEMPORARY LEVEE i
I
_ p 0 (SEE DETAIL THIS SHEETS r
ANGLE•P _ - --
99.05
O /
I �..... _ -•• MAIDS
CREEK
� ' p N 14- 1$-07E -� / q4)
Q !
RENTON P p
cc CO
0 ARKS � P
I ROPOSEQ
' DRAIN 50 FT
' L AGE EASEMENT op
_ PROP CONSTRUCTION Bq END PROJECT
O/ -
SAS r STA. --/ `�-
cc
SED CHANNEL ALIG� � +40 - 135' LT
O NMENT
r Q
• 11 O �. cc I 7 39
�
' 3 CONSTRUCTION BASELINE I
r
1 PROPOS
EQ 50 FT. I -
r ' E EASEMENT
DRAINgG
' 00
----------------
TEMP • _ - - TOP OF BANK - NEW CHANNEL
k -
(SEE RgRY FLOC DIV I NEW CHANNEL 3\
ETAIL THIS VERSION
1258 40 149 th.
TOP OF BANK - NEW CHANNEL
_ ES ROAD) 3 - Exis TING' -
ti �
BEGIN PROD ExIST� ERrs NE01
i g 0 w I ' STA. O .�, O - ECT, , T ROADS/D _ ``\� p,"IDO
'� O
J: j 40 L ®E ABgNDONEDrREAM fko lA6 1,
W W �� OLD COV l
,1
co
a
0 10 3 3 O�
cERT �'�
EXISTIN
G O I bCF - NEW BOX CULVERT
�- EXIST. 20 FT. SAN. SEW. EASEMENT
I � � N.W. 1/4 SEC.23,T.23N.,R.5E.�W.M. SANDBAG COFFERDAM B j,-- FILTER FABRIC FENCE
\ r--FILTER FABRIC'EENCE 1.-- GRAVELBAG CHECKDAM
S.W. 1/4 SEC.2.3,T.23N.,R5E.,W..M-
CLEARING LIMIT AND EROSION/SEDIMENTATION CONTROL NOTES
1. LIMIT OF CLEARING SHALL NOT EXCEED 5 FEET BEYOND THE
PROPOSED TOP OF BANK, EXCEPT WHERE NECESSARY FOR THE
CONSTRUCTION ACCESS. '
2. LIMIT OF CLEARING AND AREAS OF VEGETATION PRESERVATION
SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO
CONSTRUCTION.
3. ALL REQUIRED EROSION/SEDIMENTATION CONTROL, FACILITIES
MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND'
CLEARING AND/OR OTHER CONSTRUCTION•TO,ENSURE THAT
SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE
SYSTEM.
4. THE CONTRACTOR SHALL MAINTAIN ALL ERQSION-CONTROL
FACILITIES TO ENSURE SATISFACTORY WORKING CONDITION.
ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED
UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION
IS COMPLETED AND POTENTIAL FOR ON -SITE EROSION HAS
PASSED. ,
5. THE EROSION AND SEDIMENTATION CONTROL SYSTEM DEPICTED
ON THIS DRAWING ARE INTENDED TO BE MINIM04 REQUIREMENTS.
TO MEET ANTICIPATED SITE CQNDITIONS. AS CONSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE,
THE CONTRACTOR SHALL BE OBLIGATED AND RESPONSIBLE TO
PROVIDE ANY ADDITIONAL FACILITIES OVER AND ABOVE THE
MINIMUM REQUIREMENTS, AS MAY BE NEEDED .TO PROTECT
ADJACENT PROPERTIES AND WATER QUALITY -OF THE,RECEIVING
DRAINAGE SYSTEM.
� l 1
ff
--- TOP OF BANK
CALL 2 DAYS
BEFORE YOU DIG
CHANNEL
DATA
1-800-424-5555
STA.
SE
(CONSTRUCTION BALINEI
OFFSET
ELEV
COMMENTS
0+00
38'LT
93.0
EXISTING CHANNEL
0+03
40'LT
93.0
BEGIN CULVERT
0+63
24'LT
98.84
92.83
END CULVERT
BEGIN SEDIMENT TRAP
0+65
24'LT
26'LT
92.75
END SEDIMENT TRAP
0+94
1+00
27'LT
92.72
NEW CHANNEL
1+50
35'LT
92.58
NEW CHANNEL
2+00
26'LT
92.45
NEW CHANNEL
2+50
19'LT
92.31
NEW CHANNEL
3+00
25'LT
92.14
NEW CHANNEL
3+50
35'LT
92.03
NEW CHANNEL
4+00
10'LT
91.83
NEW CHANNEL
4+50
15'LT
91.69
NEW CHANNEL
5+00
10'LT
91.56
NEW CHANNEL
5+15
19'LT
91.52
BEGIN POOL
5+37
19'LT
91.46
END POOL
5+50
11'LT
91.42
NEW CHANNEL
6+00
20'LT
91.29
NEW CHANNEL
6+08
22'LT
91.26
BEGIN RIFFLE
6+50
24'LT
91.15
RIFFLE
6+95
24'LT
91.03
END RIFFLE
7+00
24'LT
91.02
BEGIN POOL
7+22
24'LT
90.96
END POOL
7+50
17'LT
90.88
NEW CHANNEL
8+00
5'LT
90.75
NEW CHANNEL
8+10
5'LT
90.72
BEGIN RIFFLE
8+50
6'LT
90.61
RIFFLE
8+75
101LT
90.53
END RIFFLE
9+00
15'LT
90.46
NEW CHANNEL
9+50
29'LT
90.31
90.20
NEW CHANNEL
CONNECT TO EXISTING CHANNEIS
9+75
9+76
35'LT
35'LT
89.7+
EXISTING CHANNEL
TEMPORARY EARTH LEVEE - TO BE MAINTAINED UNTIL
THE STREAM IS DIVERTED TO THE NEW CHANNEL
(TO BE REMOVED BY OTHERS)
TOP OF BANK
EXISTING CHANNEL
- �� GNPNNEL
TEMPORARY LEVEE
NO SCALE
TEMPORARY EARTH LEVEE
12'
FLOW I FLOW TOP F STREAM BANK TOP OF STREAM BANK
24" DIAM. DRAIN PIPE N, NEW CHANNEL ,� �. EXISTING CHANNEL
GENERAL NOTES -T' --Ir
1. ALL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND �• j
SPECIFICATIONS AS PREPARED BY KING COUNTY PUBLIC WORKS. -- --�
TOP OF BANK 50 FT. NEW STREAM FLOWLINE EXISTING STREAM FLOWLINE
2. CONSTRUCTION AND PLACEMENT OF FISH HABITAT COMPONENTS
SHALL BE COORDINATED WITH KING COUNTY STREAM BIOLOGIST.
PjL. PLAN
3. THE CONTRACTOR SHALL SUBMIT A DETOUR ROUTE TO KING COUNTY I B
FOR APPROVAL PRIOR TO CONSTRUCTION. PRIVATE
JONES ROAD SECTION AsA
4. RIPARIAN VEGETATION PLANTINGS ARE TO BE DONE BY OTHERS. PROPERTY I
5. ALL VEGETATIONS AND FISH HABITAT COMPONENTS SHALL
LFLOW / NO SCALE
FIRMLY ESTABLISHED PRIOR TO FLOW DIVERSION
DIVERSION IS TO BE DONE BY KING COUNTY. _
co
24" DRAIN PIPE EXISTING ROADSIDE CHANNEL
SECTION B - B
TEMPORARY FLOW DIVERSION R=392003
NO SCALE
DATE REYISION BY
AS -BUILT
LEGEND
EXISTING STREAM CHANNEL
e
PROPOSED STREAM CHANNEL
CEDAR LOGS
0o
ROCK ISLANDS
STREAMBED GRAVEL
ROOT WAD
TREE
-
SECTION LINE
- - ---
PROPERTY LINE
- -
RIGHT-OF-WAY LINE
RAILROAD TRACKS
EASEMENT LINE
97
CONTOUR LINE
0
TAX LOT NUMBER
1/4 SECTION LINE
FENCE
qgno °
Ulu �
KING COUNTY DEPARTMENT of PUBLIC WORKS
' Donald J. LaBelle, Director
SURFACE WATER MANAGEMENT DIVISION
MADSEN CREEK CHANNEL IMPROVEMENTS
(Near 149th Ave. S.E. and Maple Valley Highway)
EROSION CONTROL AND (SR 169)
PROJECT CONTROL PLAN
APPROYED L. GIBBONS DATE
RECOMMENDED IC. NILSEN DATE
DESIGNED K. NILSEN DRAWN K. NILSEN
PROJECT NO_947021 SURYEY NO. 22- 23- 5- 4 SHEET 3 OF 7
200060R
D
0
�Z
--- z
Z
�
C
m0
mm
01
can
N Z
R1
Z
m
um)
0
D
D
T
0
0
00
0
0
c
333
D
1z
Z:
c
Dm
U1
u�
Nz
z
m
O
D
m
G_
Z/�
0
C
Cu
m
a
m
M
C)
\+J
�a
0
CD �o
N
�z
C)
D
T
v
M
(0
00
DS
�m0
`
�W