Loading...
HomeMy WebLinkAbout13-1-39.13i� ate. o: SOUTH ENTRANCE Q 'No. I BY I DATE I OE CRYSTALr NC(D TMCINY PAPCM1 (n J Q W J Im N Drainage „ Schedule A x [� o E ❑ a/. L 0 G A N AVE._ - - REVISIONS r " A" PERIMETER ROAD, ENTRANCE ROAD, DRAINAGE, a PERIMETER FENCE Is B" - LANDSCAPING a EROSION CONTROL peri titr ,&d. Schedule R A`N\ER � Sched13 ule _ - - _ X Fonce ter ,A FA B Sc ldule x -row�� BOEING APRON -ch i - T AX1 W AY `---_ - - TAXIWAY APRON BOEING BOEING p g11 Schedule APRON TAXIWAY Existing Fence 8 Gate R`\JfR -_e perimeter F,�nc �_- - Schedule A RL Tv MUNICIPAL AIRPORT s i 01 SITE PLAN C Relocated Oil House SCALE I" = 200' Schedule ��A11 / GENERAL NOTES "Cu I. The Contractor shall take all necessary precautions in the course of his work to avoid damage to existing improvements and facilities which are not to be removed. The location of existing gas, water, air, fuel and other services to Airport work areas has not been shown on the plans. The Contractor shall locate these facilities, as well as any other utility structures or facilities in the construction area, in advance of construction using pipe locators or any other means as required. Existing plans and details as well as the services of an Airport Representative, will be available on request to assist the Contractcr. However, any damage to existing facilities will be the sole responsibility of the Contractor. 2. All existing storm drain pipes draining from Rainier Ave. N. to the new storm drain system shall be relayed as required to maintain a minimum, of 12'� of cover below existing ground or the new f ill, whichever is higher. APPROVAL ay Date Des. D. R. 3-73 WA4 F Drwn. E.. �% 3 73 p Ck. D. R. 3-73 Proj. Eng. �.�1 3-73 Prog. Dir. J.P.D. -73 North Schedule ',Qod -- Landscaping Schedule B-_ eter Aa Schedule ED 0 y�P 0) %Op„`r` 50 __ -- + 40 --_ -- ff SHEET INDEX I Title Sheet Vicinity Map 2 Site Plan, S`�I e E;t Index, Scnedu,'eF, a General Notes 3 - 13 Perimeter Road, Drainage, Entrance Road 8� I"en.cIn9: Plans a, F}rof 1eS. 14 - IP South And East Perimeter Road Fencing 16- 24 Sections, Details, Structural Details, Boring Logs a Street Lighting 25-35 Landscaping Plans EI Details 36 Regrading Plan- North Entrance Road Area 37 Oil House Relocation Details . 38 Pole Installation Details 39 Bid "As - Built Quantities APPROVED A- 17-73 �4RPORT DIRECTOR DATE 2 W DWG. NO 3-10SI -0901 -4, SCALE: I of C. "), DATE: MARCH 1'.47