HomeMy WebLinkAbout13-1-39.7NEW LIGHTING VAUL7--
0
H =
57AIRWAY
•
FtLc
0 EQUIP
LOCATION P OF PIPE COLUMN 4 RAILINCa
FOR POWER CONDUCTORS TO ROOF.
RUN W ►' C., 3 # 12 0 I
ALONG FZA►LI'NC7 To
BEACON. ELEC. GUTTER UP
TO CAB. VERIFY
EX15T1NG COWTROL TOWER
APPROX, LOCATION OF PANEL L-821
IN TOWER CA15. X
I
8" CONC. BLOCK WALLS
FILL ALL CELLS WITH
GROUT. 4 4 @ 24" o.c. t
(VERTICAL)] 2# 4 3)4S'1
AS SHOWN. USE 1 #5 1)
CORNERS AND EACH SIDE
OF DOOR OPENING
0
PARTIAL SITE PLAN
5CALE 1/5"- 1'-0"
#4 I2."' EA. WAY
15" o-) LOW POINT
2-1'12"C,
L.
INSTALL MAIN CIRCUIT BREAKER
AND ?METER EQUIPMENT HERE
A5 APPROVED,
3-2''c.
BREAK INTO EXIST. ELEC. J B
PATCH. RUN CONTROL CONDUCTORS
�� UP OCOOW R P A8 CONDUCTORS
NEW IbEACON ON TOP OF ROOF, SEE ROOF PLAN FOR
LOCATION - THIS SHEET. FROM GUTTER AT CAB FLOOR
RUN BEAcoN cONDUCToRS UP 4" PIPE COLUMN s 2"
RAILING POST TO J B ABOVE ROOF 1~ EXTEND CONDUIT TO
BEACON. PROVIDE WEATHERPROOF FLEXIBLE COKIDUIT
COIJNECTION AT BEACON, INSTALL 51ZE 1 FLUSH TYPE
L-821 CONTROL PANEL IN WOODEN CABINET AT LOCATION
OF 1=X15TINQj CONTROL PANEL IN CAB.
STRUCTURAL SECT f O W
SCALE : 3 k" = I'- O"
0
#4 a'; 24" O.C.
�t-
_1
12"x 2
Du IN
CONC
Box OR,,
5EE iWOTE
4EOW
—
4-4
NOTE: INSTALL IG, GA. HOLLOW METAL
DOOR 4 FRAME W/ HEAVY DUTY 5CHLAGE
LocKSET 4 I'/2. PAIR (0?x4Y2') MUTTS
r A DOOR STOP.
EL.EVATIO W r3
5CALE; 3/811= P-oh
L
4" LOUVERS
SECT SCREE
]SIDE
SPLAS14
LOCATION
PHOTO CELL A50VE PARAPET
#G GROUND WIRE
3/4" x10' GROUND ROD
E)c F-W D 3"ABOVE FLOOR .
4.2"
q:2-
- I'12"
L�
GALV 5TL. SCUPPER DOWN SPOUT
NEW LIGHTING VAULT PLAN
SCALE 51z ' = I'-O"
I PAN EL50ARD
2 TRANSFORMER
3 CONTRACTOR
,4 MIRL REGULATOR
INTERIOR E LE VAT I ON
SCALE
CELL
l,C
O J.B. *I' 1
' GROUND {SOD,
CONNECT REGULATOR ENCLOSURES 4
4"x4" GUTTER TO GROUND ROD WITH #6
COPPER CONDUCTOR j APPROVED TYPE
G RODU D CLAM Ps
LOCATION OF ISOLATORS SEE DETAIL
TYR
SEE SHT,_ _.8_
�I
1 3118'1
A
<
V/A3'6 s +�hh
c�
EXIST PIPE �--'NEW 4 x
COLUMNS BELOW EX15T.Cf x4x 5/8 BELOW
TY P.
NORTHEAST CORNER OF CONTROL TOWER
ROOF PLAN
SCALE 1/4'' = I'- 0"
W&x 15.5
EXIST, 3" 9I6510 INSULATION
EXIST, &x4 ANGLE
SECTION 5
NO SCALE
CUT TOP s= LANCE
FOR CLEARANCE'
W cox 15.5
DETAIL i
NO SCALE 6
NEW 4 x (o - BOLT TO EX ISTING
al-OC,K, I NG W % I/2" + LAG 130LT5 -
(2" LONG @ 2'-0" MAX. CENTERS
EXI57ING BLOCKING
2 - W � LACC BOLT5 X
0'-GI LONIa IN PREDRILLED
HOLES
4 x (ox 8'- 0 LONG
15
q-� LEGS OF BEACON
(3 LEGGED bEACON)
BEACON VIBRATION
,r,; — ISOLATOR MOUNT
—1 SEE SH7.8
—_ &
L G x 4 x? F3 x O'- -5" LONG
EA. SIDE
SECTION A
NO 5CALE-
"ACING rAr SR dY _
R �