Loading...
HomeMy WebLinkAbout13-1-4.519.5 i A 20. 6 20.7 i I «F • i r ��- I � 4 �•�7R. 11 `, ¢i �` 19.4 I � 1 �µ•� li � I a� 1�•�i lA ° 1 19 I7NT e • •1� i ' g• 1 . 4� I Id • 7.7 A 5 ,'i U � � � 19•� I 1 I•i451 a - / 18 •2 19.2 03 _ 30,, , a r.0.5 CC I0; cr pR IVATE a I H•,, AIRCRAFT UJ • 5 l 11 1 l HANGAR le n CL '19 y 0 _ I 1� PRIVATE�� 1 T a � I AIRCRAFT I 1, j• Q II �I = HANGAR j 1 ' I U- i I � I r- --x ' I l 1 t UJ i i Q 1 m -_ ,1 I CL I 1 i I I c 0 BUILDING ELECTRONICS i 1 i i A I 1 1 , �19•• 9.3 L 18.9 19.31 ,u• I>?•9 11 ,e.', 9.0 \ 0 LO .. 0 ' o II i 0 r 1 1 ' Z i' • , 11 p 00 Q 41 v 1 I L E G E N D RUNWAY LIGHT (FLUSH) ❑ MANHOLE (STORM) RUNWAY:_IGHT ■ MANHOLE (SEWER) FIRE HYDRANT (FLUSH) R SANITARY FIRE HYDRANT MANHOLE (WATER) VALVE 0 MANHOLE (ELECTRIC) P.I. VALVE V CONTOUR INDEX `"eo'-' CATCH BASIN 8 INLET 8 CONTOUR INTERMEDIATE FENCE ----x_-- SPOT ELEVATION \20.2 BLAST FENCE CORRUGATED FOG CURTAIN o . .. o o. METAL PIPE BULL RAIL __, TRANSFORMER TOWER 00 TT GUARD POST UTILITY STAND . . U.S POWER POLE -0- UNDERGROUND ❑UCM POLE 0 CABLE MARKER FLOOD LIGHT POLE ♦' HORIZONTAL CONTROL i�k 70/II CONCRETE OUTLINE VERTICAL CONTROL 0 13/01 BUILDING COMBINED HORIZONTAL 0 SHORELINE C:ZD AND VERTICAL. DITCH --- -- TREES 8, SHRUBS1 GUY ANCHOR T ROAD IMPROVED WATER METER T ROAD UNIMPROVED DATUM PLANES H_ORIZON_TAL: Grid coordinates, bearings and distances are based on the Washington State Coordinate System, North Zone. VERTICAL: Elevations shown are based on Geodetic Mean Sea Level (1929 General Adjustment) through the medium of the Pacific Northwest Supplemental Adjustment of 1947. DATE R E V 1 R 1 0 N Na- A TOPOGRAPHIC MAPPING R I N T 0 N BRANCH FACILITY THE B//'i✓ COMPANY RENTON WASHINGTON COMPILFM FIY: Ma'h;lhx►u,►aV `1 C A 1• IC I nWO. NU t lug ll NO tprt Surveyingak .p IL,tbiuc+esrii�� lt►c� ('�►t�l�ruY• 1 tlt. .lob No. loot Y a tr•rt �1rr• tlili't i 7 3A