Loading...
HomeMy WebLinkAbout13-1-60.1- -- - 1 9. 82 O 19.84 I - 19.50 19.35 19.60 - - - CB TOP 18.01 DN 2.77 INV 15.24 • 19.41 19.51 19.80 19.83 19.83 19.79 19.85 19.90 19.94 19.94 19.96 19.91 19.89 19.76 19.74 19.79 19.85 O 20.00 19.89 20.03 20.08 20.06 19.90 O O A O O 19.70 --! -T 20.00 19.99 19.98 20.00 20.03 19.93 19.92 19.72 20.13 19.95 19.93 19.98 19.98', 19.98 19.98 19.95 19.68 - 19.78 19.81 19.82 19.81 9.75 19.69 19.82 19.79 19.71 19.79 CB TOP 19.44 CB TOP 19.31 CB TOP 19.35 A DN 1 67 -- t---------� DN 2. 1 2- DN 2. 40 19.82 19.74 19.63 19.75 19.541 19.55 19.65 19.60 19.75 INV ,7.77 19.81 19.90 9.87 INV 17.19 19.81 19.76 19.78 'INV 16.95 19.78 19.77 19.84 A19.54 19.88 19.96 20 . ob 19.98 19.98 19.0 19.21 - -- - - - -- - - A--! J C.T1. ---------- - ---- - -- - 19.69 19.67 19.67 19.59 19.59 1 19.00 i 1 18.58 i i 19.20 9.87 19.93 19.99 19.76 19.80 19.84 19.88 19.82 19.80 A19.55 A19.72 I A19.70 19.35 J 19.33 19 . 0�_ _------� INV 14.32 A19.67 19.10 19.94 1 19.65 19.84 19.90 9.82 19.80 19.85 C �--- _ 18.87 - 9 6 0 6" CORR PLASTIC INV 15 .20 19.35 9.44 20.01 19.52 19.87 19.90 1.9.98 19.95 1 19.99 1 9A. 96 20.02 A 20.04 19.98 9.93 19.96 CB T O P 18.07 DN 2.15 INV 15.92 12" CON. SD 19.46 19.35 k 119.46 19.35 19.89 19.82 9,76 19.99 19.97 ASSUMED 20.02 19.99 20 MSL I 19.97 19.91 19.80 19.67 A19.60 A19.54 A19.54 019.51 A19.16 A19.30 A19.44 A19.49 19.20 1 ®CB TOP 18.82 DN I.0 19.09 19.29 -- 18.9 -- ° 19.30 Q A �19.52 A19.58 19.35 19.99) A19.40 A19.47 19.40 19.33 I� +9.27 THIS IS A COPY OF FIELD NOTES DEVELOPED BY BUSH, ROED HITCHINGS INC. CIVIL ENGINEERS AND LAND SURVEYORS OF SEATTLE,WASHINGTON (JOB #84132) DATED 7/25/84 A SURVEY MAP HAS NOT BEEN DRAFTED OR FINALIZED AT THIS TIME 1- 1- 60 DRAINAGE PLANS #I ELEVATIONS 304L COPYRIGHT CEDAR RIVER HANGARS NOV 1984 RENTON WASHINGTON ALL RIGHTS RESERVED DRAWN L WEAVER ISCALE I"=20' APPROVE ��,,� CEDAR RIVER HANGARS