Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1544.2
v 4 tz Q .h x Q3 46'dge 01' 16r/'dge/ SM. 2242g.68 2=8'l �v1 40 35 ' 0'' 32'-4" bear/ng of crbufinen>` h/ng e StG, 22 f 63. G 8 20o' o" (v) /3o�- O" /20'-0" 4 e /9'-6"0•,�:• 1 see 3/S 36'0" (v ,32`-4/1 S/0, ? 3 t 93. 6 a 1 4 j @ /9=6"o•c, see 3/s- O� ,l / N I l 11 I / p / I l lI I l 0 20-0 20.0 -- ,20-0- 20-0 20-0 see //5-9 `` �✓' �'a//in Ede off' brit: e ,' �� 6ar-r-i'e r rail see //.5f r, 1 vo 0l, Edge o i' br/'dg c1 28. 68 -8 ('V) b earl*nq at abufinen f 021 10,/ see S,oec/'/ c0//on s / A The loroVecf hos/ca//e cons/sfs ©f'I'emov/� the ex/s/ira ra /?ew /oD 4't vv/c% br/'O'qe. o% 2. The defy/Is of the exe c/r �0 ,„!6 3. .3heef '•/ shoes/.s 1he ,0/0n c,rJc/ o deer Me com o7e1`rbn orMe e bi -(z rro ecl 4. The d/-c/w/ngs ore /aresentoc/ ors the <'< '� assu/nof/'on that the p//es urac%/- the ,offers o,/-e /r� goad n concIl'11o, 29=01, _ ��;See s/oec/cad/ons for ><eSt/o/"OCECiG// eS). ,c0//es are de efrn/r7ed tb o e C /n mho. uschle condi>`/on, then fo/%v�/,orocedurE C.J + ''Ua/,C, oc/r�//sec/ belaw'. 1i ,the 10,1i'e5 are ;''aunt/ ----- -- --- 1`o be in pan-usc/,b/e condi'f/ors Me/? the /C7n fCt de/0"*/S O e)0/ /,0/ 0CeO/Ur"eS 0Uf///i ec% 0n Top ot'ral/J // , // r r /r // // /` /r - / e.: \ sf7 eel S - /o are fo he fo //o vv ec% Qj Qj left 4) ° r / _ / _ /r _ 1, i / / // N v V) c ° r face;2 `b 1 ,a/ante/- \ c'ooc. s/o'ec olk Sim. 3/s 5-0"� Z,5 6 �5/vo ,T Ex/, >///?9 co")S.,,ruG'bb New ,poured c'oncr"e/e New /orecc/sf concrete (/1) Ne w (v) vei )y e f: Ex oans/an Jo/n/ er DATE R E V I S I O N S - -- South abutment' -/in e see S-8 i'/ Q i;/ /-//n e see S-8 r " /1lor-f/ c/butmen,- see S-3 °r�/// / .� 9 ' /!,/ see 5-4 // 0 O cv At'edge oideck2 of V * 3S7r e"short '/di"aphragms - _7' 9/s-8 .6arr/er rail, see3/S-co - �✓ �0/ G°J; > \,' i /A-Ta of f i�� 3 6 =-a Ste, ,• - �, v 77- _ I o �� 0 b/-icge e>tie,/k see/�s-9 /°resfressed g/�der-s 6 0" o.c,� see 5-7 � �� �\\\v�i� ��Sim. 3/S-9 �� 4 @ /9 / 6"o.c. see 3/S-9 4e / 9 `ro"o.c. see 3/S-9 o (D ---------- - ---- - --- I• - -- --- -- -------- -- - — ''Sz. ��/a// G/I- 0.0 Note: See .5-9 /®r• deck e1,evoA1;:) as. ///6//, //-0„ Fore of C'a,-b O To,p a�.3s.0 5 COnsfrucf/on se uence. Conbocfor mo s35.0' � 0 9 Foee o f' �o'or� Curb SUbm/f ollel-nof/ve segutence for rev/� w aooro va/ by Eby/necr,Or/ve sheef,o�linq, dewafei- Lzkv. ,p of rail c/nd expose ex/sf p//es�fo/- ir�s�ecl`ia,/1. = .34.75p, ke/nove /6� /"t w/d/`fa ,,--0001 oel, See //s-S-, ,00 not `-e/no ve t/�/ e r• etc�//a/i'2 t� l�vCi ils . b, .Or/ ve ,o/%s scar ne,w /o/ers c�r/a/ new West s/de abuf/nen/`s ant/ refa/n/n� wci//s, C. Remove 0/00 /t 4-'0" length o,{'rerna/ra/ns ex/s./rig br/c/ge, a/ each end ('ghoul to /r, 16 /4P, w/dfh o/ o Al ne). /Or/'ve ,o//es >for new ahufrnen/ ol;c/ relc/.9 walls anti' cover the aoen/nq vv/•r`h steel Alo> es f0 c //Ow 40 loess or/er. The ,4ofc,/ w1*d1/`2 to he removed., fh/s way /s 43`- //" ' of eoc6 end o/ the br/dge. crop ra a c,h ern,�on /� rr� en,�s o r� r�'i rs>` ,vhc�se of neW far/%cE, sce 4/S-5 e, Cons><ruc l wes/ s/'c% (lj� ,oh os e) o ;�' /7eW fJr/Q�C�e. f Re/nv ve /-errto//-icier c,1�' ex/shr�� br/'dg � su,aers r-ucfure. /Jo n0/ rernove retc//iw;v yvn/'/s, 9. Cor;s/rc/c/ remoll"70ler t1241110ho'se) of .yew far/"'cue, GENERAL NOTES 1) Bridge design is in accordance with the 1969 A,A,S.H2O. specifications and the 1970 and 1971 interim modifi- cations. 2) Construction specification: State of Washington Standard Specifications for Road and Bridge Construction dated 1969. 3) Foundation Design is based on soils report dated December 1971 by Geolabs Inc., Bellevue, Washington. 4) Design Live Load: HS20-44. 5) Resurfacing allowance: 20 nsf. 6) Concrete Strengths: a) Prestressed Concrete = 6,000 psi @ 28 days = 5,000 psi P release b) A11 other concrete = 3,600 psi (@ 28 days (Class "A" Concrete) fc = 1,440 psi; n=10 7) Reinforcing Steel = ASTM A615 Grade 40 fs = 20,000 psi All splices shall be 30 dia. for #3 thru #8 40 dia. for #9 thru #11 8) Piling: a) Design loading for piles is 25 tons each b) All piles shall be timber niles, pressure treated with pentachlorophenol by the empty cell process in accordance with the requirements of A•A,S.H2O. Designation M133. Such piles shall not be driven until they have dried sufficiently to prevent leaching of preservatives into the receiving waters. A / I nF WAsy, C� = �� ,� �.;..: �G ` D.A. D. 3/31 Tom; A.A.N13131 K L.u/ 3131 ®'SAL 0\� S-1 c) The contractor may submit to the engineer for approval on alternate type of pile. d) Pile tip elevations indicated on the plans are approximate and shall be used for bidding purposes. All piles are to be driven at least one foot (1 ft.) into the very dense "Salmon Springs Drift" strata to the elevation as directed by the engineer. All pile driving shall be done under the full time super- vision of the engineer. e) Piles shall be driven continuously to the final tip elevation once driving has commenced. The driven piles shall not vary from the required alignment by more than 1/4" per foot of pile length, nor shall thr final location be in excess of three inches (3") of the design location. All broken, shattered or splin- tered piles shall be removed at the contractor's expense. f) Piles shall be driven with a single acting pile driver having a driving capacity of 15,000 ft. - lbs. of energy per blow. Jetting or pre -drilling will not b: permitted without the engineer's approval. g) Piles shall be cut off at the elevation indicated on " the drawings. h) The engineer will provide all staking for the Proje.._ in accordance with Section 1-05.5 of the specifications JF RENTON ENGINEERING DEPARTMENT LOGAN AVENUE BRIDGE L; 0"g4'v/,TIQNS DESIGNED_ _ _._. p DA-1 MAR 31 1'972 _ i FILE NC DRAWN------ --� f�1_r AS SHOWtN FIELD er+Ox-_. CHECKED