Loading...
HomeMy WebLinkAbout1562.1°/ LE - 5CA > I'll A Al 4 NOTE : POND I!5 5im i�t: TA i N bE�/ELOPEl7 -PLOWS FOFZ TRACT "A" AL50. D-- D Ciry OF eEN7701V 5PR/N6,5ROOK WATERS/-/Ep — —------------------------------- 75 WIOE A CCEs5 f?\OAD 374 \ -AVE0 W/rN /%2 "ASPNAL; 7"KE A 7Z70 ,BASE 2 " ,BASE ft�=K , SLOPE = 20 % /►'!AX . NOTE: CONTRACTOR TO PROVIDE TEMPORARY PADLOCK DURING CONSTRUCTION. I" CHAMFER- 7,� 1_/ 4 SIDES -� (- PAINT WHITE -TOP, 4 SIDES ONLY {SEE SPECS) 8 X 8 D.F. ROUGH STD. OR BETTER PRESSURE TREATED f� 1/2" .0 HOLE THRU POST 1/2" MACHINE BOLT, COUNTERSINK HEAD, 7/NUT & WASHERS. PEEN BOLT END. 3/4" GALV. EYE BOLT WITH SHOULDER DRILL 3/8" HOLE FOR PADLOCK j-- 4 3/411 L.G� 2"min. BEST PADLOCK, 6B622 OWNER WILL FURNISH CORE (See Specs) NOTE: BOTTOM OF POST TO HAVE HOLE 3`1 DEEP X 4 3/4" DIA, MAKE HOLE FOR EYEBOLT I/16" LARGER THAN BOLT DIA . -CONCRETE ANCHOR 3.Oro 8" I.D. 3.50" 0. D. GALV. STEEL PIPE PIPE 2`-6" LONG 3.826"I.D 4.50"O.D. GALV. STEEL PIPE PIPE 2`-9" LONG Section 1"c I'-011 REMOVABLE BOLLARD ALL STEEL PARTS MUST BE GALVANIZED AND ASPHALT COATED (TREATMENT I OR BETTER). 0.5" GALV. OR NONI-CORROSIVE BOLTS S NUTS 4 EA. 0.25"X 2"X 5" STRIPS to „ „ WELD 'TO 0.75" DIA. FRAME, 0.25 X 2 X5 SPACE UNIFORMLY —a STRIPS 0.7 511 D I A , /"/PE MAX.3" ^Low 497 SPACING ENDS TO BE WELDED TO 0.75 DIA. FRAME END VIEW "A" TRASH RACK DETAIL NO XALM 3�3 � 15` EASEMENT L ' J L . REMOVABLE BOLLARDS 2 EA. IN CTR_ OF ACCESS RD. I EA. EIXU BOLLARD AT EDGE OF RD, ( BOTH SIDES) BOLLARD SPACING DETAIL I = 4'- o' 175" 0.5`min. J76.501 `1 1 J+2.4.8G S•t. 200A"3i 103rd CT. S. E. ; 74,ac r '- Covc, 5CC 5h. 3 ofG 30- fir-o70wc, EX/5T. CB /NL E T # / �1 3TA 7+Z7 GR. EL = 375 40 /NY. EL = 373. 70 • •• • -• POND SPILLWAY DETAIL 1d1_ ON 4" MIN. DEPTH ROCK (kin. 4" Face) ROAD CROSSING SWAL'tl DETAIL 1"- 4'-0' SECTION A -A SECTION C-C ,376--__ ----3 72- SECTION B-B SCALE - 1"- 20'H. /"=2.4 V. - 392 i' pf 37 37 372-- — SECT 10 N D-D A)2a THE POND/DAM MUST BE ADEQUATELY DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER QUALIFIED IN SOILS ANALYSIS, FOUNDATION ENGINEERING AND DAM DESIGN. THE DESIGN MUST BE DONE PRIOR TO COMMENCEMENT OF CONSTRUCTION OF THE POND/DAM. THE ABOVE PRO- FESSIONAL ENGINEER MUST SUBMIT DESIGN DATA WITH A LETTER STAT- ING T'-iAT THE DESIGN IS ADEQUATE. THE PLANS MUST BE STAMPED AND SIGNED BY SAID ENGINEER. UPON COMPLETION OF THE POND/DAM THE ABOVE ENGINEER MUST SUBMIT A LETTER THAT THE POND/DAM WAS CON- - STRUCTED ACCORDING TO S E N A N11S F.0 FICATI NS. 12 V IAIA es I � � Re toy /wa oca0 1 VOWNS Mo-CHWA M s AMC, INC. CL1 "SQUIRE CONSTRUCTION COMPANY DEVELOPMENT COWSUL TANTS M°"` T PA R K R I DG E EAST INTERCEPTOR SWALE DETAIL LAND SURVEYORS 01i DETENTION POND PLAN & SECTIONMin. Slope =0.5% 409 SOUTH3rd AVENUE KENT,DIASHINGTO WO31 DAWN �Y 1/005SCALE 45 517OWn sWElT t`%01854-2043 A►MOVED 11 6. DATE A rd /980 ..00« iON 77O 91_ON