Loading...
HomeMy WebLinkAbout1639.3WIRING & CONDUIT SCHEDULE RUN NO. CONDUIT WIRE Ai 1 1/2" P.V.C. I- 2/C SHD. 1 1/2" P.V.C. 2- 2/C SHD. 0 S. C. 2 -*12 44 S. C. 4-* 12 0 S.C. / i 1/2111 P.V.C. 6 -# 12 r, Un 0 o o'� I '4o --o 0 0 0 0 o= o 0 0-1 50 o— SIGNAL HEADS R 12"(: ) R 12" (: ) R 12" A 1211 A 12" A 12" 1 G 1212812�� 4 3157618, 10 EXIST. TO 9, 1 I, 12 REMAIN OPT. PROG. PEDESTRIAN HEAD HAND MAN 20,21,22, 23, 24,25 > 7 1211 12" 12" 12" 20 0 20 40 60 LI N D AVE. S. W. 3' 0-- ° o 0-=0 0 0 0-0 0 0 0 2 6� o 0 0 0 0 0 0 0 0- =o'�, 17 - ------ ---- -- 8EE g 8 — 4 0 \ 2 25 7 9 �. 2 6 CONSTRUCTION NOTES OI EXISTING GALV. STEEL MAST ARM (401) SIGNAL POLE. REMOVE 3 VEH. HDS., I PED. HD. & INSTALL . I� 2 VEH. HDS, I PED. HD. AS INDICATED ON THE PLANS & DETAIL SHEETS. 7% — �t 02 EXISTING GALV. STEEL PED. POLE. REMOVE I PED. HD. & INSTALL I NEW PED. HD. AS INDICATED • ON THE PLANS & DETAIL SHEETS. i 03 EXISTING GALV. STEEL MAST ARM (301) SIGNAL POLE. REMOVE 2 VEH. HDS., I PED HD. & INSTALL 2 NEW VEH. HDS., I NEW PED. HD. AS INDICATED ON THE PLANS & DETAIL SHEETS. 1 1 04 1 INSTALL NEW CONTROLLER AND CONTROLLER CABINET (P-1) ON EXISTING P-1 CONC. FOUNDATION, 1 1 ( EXISTING GALV. STEEL MAST ARM (351) SIGNAL POLE. REMOVE 2 VEH. HDS., I PED. HD. & INSTALL 1 3 NEW VEH. HDS., I NEW PIED. HD. AS INDICATED ON THE PLANS & DETAIL SHEETS. @EXISTING GALV. STEEL MAST ARM (351) SIGNAL POLE, REMOVE 3 VEH. HDS., I PED. HD. & INSTALL 3 NEW VEH. HDS., I NEW PED. HD. AS INDICATED ON THE PLANS & DETAIL SHEETS. 1 �OINSTALL JUNCTION BOX (TYPE B). SEE DETAIL SHEETS. 08 INSTALL 61X61 VEHICLE DETECTION LOOP. SEE DETAIL SHEETS. 09 SPLICE NEW DETECTION LOOP WIRE TO EXISTING 2-2/C SHD. CABLE OPERATING EXISTING LOOPS. 2"ft 4 5 C. SIGNAL PHASE DIAGRAM 19 El 17 1 .1 mul mw 10 24 12 11 � 5 1 ,0 O 1 1 o �; 1 1 T%k I � O O� 1 11 O O � 11 � 0 O 1 1 % 0 1 O 1 0looilr_P�113C7_ CITY OF RE 0 NTON DEPARTMENT OF ENGINEERING LI ND AVE. S.W. & S.W. GRADY WAY SIGNAL PLAN DESIGNED P. L. DATE DEC.183 FILE NO. _ -_ DR."IV!rtRAH/P.L. II_ I CHECKEDP• L. SCALE 1 - 20 FIELD BOOK PAGE_ REVISION BY APPR. DATE APPROVED SHEET 3 OF_ 4 DIRECTOR OF ENGINEERING DIEYERICH POST 1000H . DPOO118D