Loading...
HomeMy WebLinkAbout1652.1� �C�����,_��Cti<� � _� �L ICE'' '<J � ����` JsL°���.�r'SIGNALIZATION, ILLUMINATION and CHANNELIZATIONnZ GENERAL NOTES 1. THE CITY SHALL PROVIDE THE FOLLOWING EQUIPMENT FOR THE INTER- SECTIONS OF S. 7TH ST., S. 3RD PL. AND S. 4TH PL. A) SIGNALIZATION: 1. ALI, SIGNAL POLES WITH ANCHOR BOLTS, BASE COVERS AND ASSOCIATED POLE HARDWARE INCLUDING THE`SIGN POLE. 2. ALL VEHICLE SIGNAL HEADS WITH MOUNTING BRACKETS AND BACKPLATES, EXCEPT THE FLASHING BEACONS. 3. ALI, PEDESTRIAN SIGNAL HEADS WITH MOUNTING HARDWARE. 2. THE CITY SHALL PROVIDE THE FOLLOWING EQUIPMENT FOR THE ENTIRE PROJECT: A) SIGNALIZATION: 1. ALL FULL ACTUATED CONTROLLERS WITH TYPE P-1 CABINETS. B) ILLUMINATION: 1. ALL STREET LIGHT POLES, ANCHOR BOLTS AND ASSOCIATED POLE HARDWARE. 2, ALL LUMINAIRES, LAMPS, AND PHOTO ELECTRIC CELLS, EXCEPT THOSE FOR THE SIGN INSTALLATION. 3. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING EQUIPMENT FOR S. 3RD ST. A) SIGNALIZATION 1. ALL SIGNAL POLES WITH ANCHOR BOLTS, BASE COVERS AND ASSOCIATED POLE HARDWARE. 2. ALL VEHICLE SIGNAL HEADS WITH MOUNTING BRACKETS AND BACKPLATES. 3. ALL PEDESTRIAN SIGNAL HEADS WITH MOUNTING BRACKETS. 4. ALL INTERNAI_,LY ILLUMINATED SIGNS WITH MOUNTING HARDWARE. t. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING EQUIPMENT FOR THE INTERSECTION OF S. 2ND ST. A) SIGNALIZATION 1. ALL SIGNAL POLES EXCEPT THE TWIN MAST ARM POLE, AND ALL ANCHOR BOLTS, BASE COVERS AND ASSOCIATED POLE HARDWARE FOR ALL POLES INCLUDING THE TWIN MAST ARM POLE. 2. ALL VEHICLE SIGNAL HEADS WITH MOUNTING BRACKETS AND BACKPLATES. 3. ALL PEDESTRIAN SIGNAL HEADS WITH MOUNTING BRACKETS. 4. ALL INTERNALLY ILLUMINATED SIGNS WITH MOUNTING HARDWARE. 5, ALL OTHER NE(-.i'SSARY EQUIPMENT NOT SPECIFIED ABOVE SHALL BE SUPPLIED BY THE CONTRACTOR FOR HE ENTIRE PROZECT. 6. THE CONTRACTOR SHALL INSTALL A PULL WIRE 412 THW) IN EVERY SIGNAL CONDUIT RUN, INCLUDING THE INTERCONNECT CIRCUIT. 7. ALL FOUNDATIONS SHALL BE AS INDICATED ON THE STANDARD PLANS AND CONFORM TO THE FOLLOWING: FOUNDATION FOR: STANDARD PLAN NO. DEPTH OF FOUNDATION SIGNAL POLE 15' TWIN MAST ARM J-21d 6' - 0'" 20' MAST ARM J-21d 6' - 0" 25' MAST ARM J-21d 6' - 0" 30' MAST ARM J-21d 6' - 0" 35' MAST ARM J-21d 7' - 0" 40, MAST ARM J-21d 7' - 0" STREET LIGHT POLE 40' MH DETAIL SHEET E-10 4' - 0" STREET LIGHT POLE 25' MH DETAIL SHEET E-10 3' - 01, CONTROLLER CABINET DETAIL SHEET E-6 AS SHOWN MASTER CONTACTOR J-21b AS SHOWN SIGN POLE G-12b 8' - 0" 8. ALL EXISTING SIGNAL INSTALLATIONS SHALL BE KEPT IN OPERATION UNTIL THE NEW INSTALLATION IS COMPLETE. AT THE DIRECTION AND APPROVAL OF THE ENGINEER, A TEMPORARY SIGNAL SYSTEM SHALL BE INSTALLED AT LOCATIONS REQUESTED BY THE CONTRACTOR WHERE THE EXISTING SYSTEM CANNOT REMAIN IN OPERATION FOR THE ADEQUATE COMPLETION OF THE PROJECT,, ALL EXISTING SIGNAL EQUIPMENT SHALL BE REMOVED AND DELIVERED TO THE CITY YARD. 9: ALL JUNCTION BOXES SHALL BE TYPE 1 UNLESS vTiiE,-XJT SHOWN ON THE PLANS. 10• THE CONTRACTOR SHALL INSTALL ALL STREET LIGHT POLES AND LUMINAIRES AT THE POSITIONS INDICATED ON THE PLANS AS FOLLOWS: A) 40' DAVIT POLE WITH 400 WATT SODIUM VAPOR LUMINAIRE STATION 1+00 TO STATION 65+00 B) 25' DAVIT POLE WITH 250 WATT SODIUM VAPOR LUMINAIRE STATION 65+00 TO E.O.P. UAB PROJECT NL' 8-1mm1O205) ® ��_-LE�0�F,PROJEC _ STA 97+ 36 *a z 6'� 1 s � V 41 It AI 5 .r r y � ' - '3 z j1_ td a .sF Q SAC_ e, �,.► t _ STA 42+35 r. xk 'x'�j..�r w. �`�•a a.l •. fit++-nT:.r; ` ,.,.o � S. - - R� a��, ,:sue• { _ _S MA 36+484 Z ?' U 314 �e 9 STA 24+20` ,� d000 .. _� .� ' 3. STA 12 0;7`\� gTA 1400 Of fie 4 sr1 LEGEND TRAFFIC SIGNAL POLE & `TEHICLF, SIGNAL HEADS PEDESTRIAN SIGNAL HEAD m PEDESTAL POLE OR PEDESTRIAN POST WITH 9 PUSHBUTTON & SIGN CONTROLLER CABINET JUNCTION BOX CONDUIT — -- -- STREET LIGHT POLE (400 W. S.V./40' POLE) STREET LIGHT POLE (250 W. S.V./25' POLE) STREET LIGHT ON SIGNAL POLE MASTER CONTACTOR E14 PUGET POWER VAULT El RIGHT-OF-WAY -- CURB LINE <<. `� • titi P 01 �tc i +:��• ,;STE?- 0 s N0, 10416 ytil Washington G ICI ('I AIF FPC APrW1TCf'TC PI AAIAlCPC CI I9VGVn1?C NO. 4,, SHEET NO. E-1 E-2,E-3 E-4 E-5 E-6 E-7 E-8 E-9,E-10 E--11 E-12 E-13 E-14 E-15 E-16 E-17 E-18 E-19 E-20,E-21 E-22,E-23, E-24 E-25 THRU E-33 E-34,E-35 E-36 E-37 E-38 E-39 E-40 E-41 E-42 ENGINEERING DEPARTMENT: INDEX DESCRIPTION FUNCTION COVER SHEET SUMMARY OF QUANTITIES RAINIER AVE & S. 7TH ST. SIGNALIZATION RAINIER AVE & S. 4TH PL. SIGNALIZATION RAINIER AVE & S. 3RD PL. SIGNALIZATION RAINIER AVE & S. 3RD ST. SIGNALIZATION RAINIER AVE & S. 2ND ST. SIGNALIZATION INTERSECTION WIRING SCHEDULES SIGNALIZATION STA 1+00 TO STA 8+97 ILLUMINATION STA 8+97 TO STA 21+21 ILLUMINATION STA 21+21 TO STA 32+35 ILLUMINATION STA 32+35 TO STA 43+46 ILLUMINATION STA 43+46 TO STA 53+82 ILLUMINATION STA 53+82 TO STA 65+00 ILLUMINATION STA 65+00 TO STA 77+00 ILLUMINATION STA 77+00 TO STA 88+00 ILLUMINATION STA 88+00 TO STA 97+36 ILLUMINATION ILLUMINATION SCHEDULE ILLUMINATION CONDUIT SCHEDULE UNDERGROUND TRENCH SCHEDULE UNDERGROUND TRENCH SCHEDULE TABULATION UNDERGROUND STA 00+00 TO STA 8+97 CHANNELIZATION STA 8+97 TO STA 21+21 CHANNELIZATION STA 21+21 TO STA 32+35 CHANNELIZATION STA 32+35 TO STA 43+46 CHANNELIZATION STA 43+46 TO STA 53+82 CHANNELIZATION STA 53+82 TO STA 65+00 CHANNELIZATION STA 6'5+00 TO STA 91+20 CHANNELIZATION /4 s2m CITY OF RENTON ENGINEERING DEPARTMENT RAINIER AVENUE IMPROVEMENTS DESIGNED ITPF ' DATE ZRMAV 72- I FILE NO. S�-Z CHECKED SCALE FI[LD 1100R PA01f `T ' APPROVED SHEET E-1 OFZ CITT towel "a" REVISION 0Y IAPPR.I DATE