Loading...
HomeMy WebLinkAbout1691.2d J C'C.L'C3I1AiIlii ruoFI— �/ BUTTOIN POST PEDESTRIAN PUSH-- BUTTON POST PEDESTI, r r'-NI S I GN('I_ POLE TYI'E I—B 1,5' 1,51X1.,51X 1,5' 9 PED!ESTI, AI'J PUSH- 1,5'XT,5'X — - — — — )?UT TON; POST 115 10 CONTROLLER, TYPE FI-1. CAB11 ET A'ID FOUf'UATIOIN AT STA 410+62 RT, I,ITH STREET S I LE: UI' L=c U DAT I ON 8' FROM TNIE FACE Of- CND RB , I FtiSTALL TO St;Nl GRADE AS BACK EDGE OF SIDEWALK, CONTROLLER AI'IIJ CABINIET L°dILL BE SUPPLIED BY CITY, (Di JUNCTION BOX, DES I GI1 B 12�JUNCTION'I BOX, DESIGN B. NOT PART' OF THIS PROJECT, 13 JUNCTION BOX, DESIGNN B, PROVIDE ELBOIIS AND EXTEilD EXISTING PVC CONIDUIT FOR PUGET DRIVE L I GHT I I`tiG SYSTE N`1 INTO J UNCT I ONI BOX, INSTALL 1 1" PVC CONDUIT AND 248 WIRES TO EXISTINIG JUNCTION BOX (ILL[,_MINATION RUN #25), SPLICE TO EXISTINIG #8 WIRES IN EXISTING JUNCTION11 BOX AI'}D TO PUGET DRIVE STREET LIGHT CIRCUIT IN NEW JUNCTION BOX, 14 JUNCTION BOX, DESIGNS B, INSTALL � 0' FROM TALBOT ROAD CENTERLINE AND WITHIN FUTURE ISLAN) AREA INIDICATED ON THE PLANS, SET TO SAIIE GRADE AS FOUNDATION TOP OF MAST ARI'1 SIGNAL POLE #2 , 15 JUNCTION BOX, DESIGN, B. INSTALL 37' FROVi TALBOT ROAD CENTERLI NIE AND WITHIN FUTURE ISLAND AREA INPJC'ATED ON THE PLANS, SET TO SAME GRADE AS FOUNDATION TOP OF PEDESTRIAN PUSHBUTTON, POST #6 16 JUNCTION BOX, DESIGN'I B. INSTALL AT STA 409-+76 LT, 35' FROM TALBOT ROAD CENTERLINE, SET TO SAME GRADE AS FOUNDtATION TOP OF MAST ARM SIGNAL POLE #3, 17 JUNCTION BOX, DESIGN B, INSTALL AT STA 9+50 RT, 27' FROM PUGET DRIVE CENTER-, LINE,- SET FLUSH WITH EXISTING GRADE, 18 6'X6' INDUCTION LOOP VEHICLE DETECTOR, 19 6'X10' INDUCTION LOOP VEHICLE DETECTOR, `f1/J ' V/ I % I 409+72 LT 410-+-74 LT ./V 1 1 \VI 1 TALBOT ROAD CENwTERLINIC 22' FR0M, TALBOT ROAD CENTFRN_INE 28, 5' FROM PUS f-T DRIVE CENI'TERL_ I f`'E. G r: ' F 11"O[I FACE OF' CURD FLUSH 'y'IT11 EXISTING GRI-11E FLUSH I!ITf? EXISTING GRADE FLUSH I�1ITfI ', S IT'c.I 'ALK 20 6'X6' INDUCTIONN LOOP VEHICLE DETECTOR CTIDUIT FROM JUNCT IOId BOX WILL BE STUBBED UNDER CUiN h AINID I,I I li A "Y" CUT II,TO I HE FACE Oi= CURB DIRECTLY ABOVE TI-fE COI`dDUIT, 21 REMOVE: EXISTING STI NIG COi;'TROLLER, Cf'jI; I N FT ANIi� PE DFST/' L. , sREMOV _ EXISTING FOOD POLE AND SPANI WIRE SIGNAL SYSTEM, 23 REMOVE EX I ST I NG FOOD POLE, LU1,1I NA I RE ARM, AND METER BASE, 24 POLE AND OVERHEAD LINE TO BE REMOVED BY TELEPHONE COMPANY, 25 6'X6' INDUCTION LOOP VEHICLE DETECTOR, NOT PART OF THIS PROJECT, 26 6'X40' INDUCTION LOOP VEHICLE DETECTOR WITH 6'X5' HEAD LOOP, NOT PART OF THIS PROJECT, 27 DESIGN B JUNCTION BOX AT BASE OF EXISTING POI,!,!FR POLE, COIL_ 50' #_4_-_ WIRE, PROVIDE 30' OF RIGID METAL CONDUIT, 1 I-fEATHERIIEAD AND SUFFICIENT STRAPS TO INSTALL CONDUIT AND I°lEATHERHEAD ONI PONE ALL ITEF11S TO BE INSTALLED ON POLE WILL BE INSTALLED BY PUGET Pffl E R CO. % �n AL yt% washington ENGINEERS ARCHITECTS PLANNERS SURVEYORS 13401 BELLEVUE - REDMOND ROAD, S. 101, BELLEVUE, WA. 98005 CONSTRUCT CONCRETE S I DEG,!ALK 6' WIDE FROI11 EX I ST I `1!G SIDEWALK AT APP ROX I F` ATE STA 410+86 (TALBOT ROAD) TO END OF CONCRETE CUf\'Ij' ANID GUTTER SECTION; AT APPROXIMATE STA 10+62 (PUGET DRIVE) , CURB AND GUTTER MILL BE INST[,,LI_N D BY OTHERS, 41 CONSTRUCT CONCRETE SIDEWALK 6' WIDE FROM EXISTING SIDEWALK AT APPROXIMATE STA 410+66 (TALBOT ROAD) TO END OF CONCRETE CURB AND GUTTER SECTION AT APPROXIMATE STA 9+33 (PUGET DRIVE), CURB AND GUTTER WILL BE INSTALLED BY OTHERS, 42 SPLICE WIRE_ FROM LEFT TURN INDUCTION LOOP TO 2/c SHIELDED CABLE PRESENTLY USED FOR THROUGH LADE INDUCTIO;'1 LOOP, MAKE APPROPRIATE WIRING CHANGE AT CONTROLLER, 43 CON�NECT WIRES FOR STREET LIGHTS tr43 AND FUTURE 7'`42 TO EXISTING STREET LIGHT CIRCUIT INBASE OF STREET LIGHT POLE, USE WYE TYPE QUICK DISCONTIECT KIT, 8SPLICE STREET LIGHT WIRES FOR STREET LIGHTS #`40,411 I0 EXISTING STREET 8 LIGHT CIRCUIT TERI`iINATED IN JUi'ICTION BOX BY OTHERS, INDICATES FUTURE CONSTRUCTION NOTES, NOT PART OF THIS PROJECT, CITY OF RENTON lx/ DEPARTMENT OF ENGINEERING TRAFFIC ENGINEERING DIVISION FsslQ v?SIGNAL INSTALLATION IVA No. 104T�- B 0T R D PU GET DRIVE DESIGNED.-9. PIE. DATE 9q,-t 1973 FILE NO. DRAWN • F CHECKED SCALE43-NOACCI FIELD BOOK_____PAGE I NO. REVISION BY APPR. DATE APPROVED Z SHEET 3 OF 9_ DIRECTOR OF ENGINEERING