Loading...
HomeMy WebLinkAbout1720.11REGION N STATE FEDERAL AID PROJ NO SHEET NO 10 WASH I EHS T-7102 (2) .S SCALE Im rr—ci STA.99+72 SIGNAL HEADS 12 �R C� 8 C c� 8 CG 213,14j517,8%%10 1,6 INITIAL INITIAL 0 3 �STA.20+91E I i S RETAINING li Sl 0+2 WALL A 61 rSTA.2u+46 1,6 FUTURE PHASING CTA lAt14.7Q 1 101-- STA. 19+ I PEDESTRIAN HEADS CI ITN IDC DU A CI Alr L L31� NE 10TH SIT l CONSTRUCTION NOTES OINSTALL GALVANIZED STEEL SIGNAL POLE TYPE D-1 WITH 35' MAST ARM; ONE VEHICLE SIGNAL HEAD MTG. TYPE M; TWO VEHICLE SIGNAL HEADS MTG. TYPE L; TWO PEDESTRIAN SIGNAL HEADS MTG. TYPE A, AND TWO PEDESTRIAN PUSH BUTTONS WITH SIGN MESSAGE AS PER DETAIL SHEET. INSTALL 400 WATT SODIUM VAPOR STREET LUMINAIRF. CONNECT FIELD WIRES TO THE APPROPRIATE TERMINALS. SEE SPECIAL PROVISIONS, DETAIL SHEET AND STANDARD PLAN J-21C. TWO LOCATIONS (STA. 101+42 AND STA. 102+21), ON SUNSET, 6'-6" FROM FACE OF CURB. OINSTALL GALVANIZED STEEL SIGNAL POLE TYPE B-1 WITH 25' MAST ARM; TWO VEHICLE SIGNAL HEADS MTG. TYPE L; TWO PEDESTRIAN SIGNAL HEADS MTG. TYPE A, AND TWO PEDESTRIAN PUSH BUTTONS WITH SIGN MESSAGE AS PER DETAIL SHEET. INSTALL 400 WATT SODIUM VAPOR STREET LUMINAIRE,, CONNECT FIELD WIRES TO THE APPROPRIATE TERMINALS. SEE SPECIAL PROVISIONS, DETAIL SHEET AND STANDARD PLAN J-21C. TWO LOCATIONS (STA. 19+49 AND STA. 20+50) ON N.E. 10TH, 6'-6" FROM FACE OF CURB. 3 PROVIDE AND INSTALL PEDESTRIAN PUSH BUTTON POST WITH TWO PEDESTRIAN PUSH BUTTONS AND SIGN MESSAGE AS PER DETAIL SHEET. SEE STANDARD PLAN J-21B, SPECIAL PROVISIONS AND DETAIL SHEET. OINSTALL 6' x 30' INDUCTION LOOP DETECTOR. SEE SPECIAL PROVISIONS, DETAIL SHEET AND STANDARD PLAN J-21B. OINSTALL 6' x 6' INDUCTION LOOP DETECTOR. SEE SPECIAL PROVISIONS, DETAIL SHEET, AND STANDARD PLAN J-21B. OINSTALL 6' x 10' INDUCTION LOOP DETECTOR. SEE SPECIAL PROVISIONS, DETAIL SHEET, AND STANDARD PLAT; J-21B. OINSTALL CONTROLLER CABINET TYPE P-1 ON RAISED CONCRETE BASE. SEE SPECIAL PROVISIONS AND DETAIL SHEET. n INSTALL FIRE PRE-EMPTION DETECTORS. SEE DETAIL SHEET. RUN NO. O- 103 _ �104 o STA. 102+7 STA.103+83 SEQUENCE DIAGRAM 1 2 3 4 5 6 7 8 s � W WN WM k. W 0A0)2&3G GARR R R R A G R I R R 0A (%';"7&8 G G A R R R R R A R I G R R OB. '*4&5 R R R GI G A R R R R R G R OB *9&10 R R R G G A R R R R I R R G OC *I (FUTURE) G G A R R R R G R A A R R R R oc #6 (FUTURE) G G A R R R R KDW a R R R R 10A PED SIG *21, W FDW DW DW DW DW DW — DW DW DW DW 22)25A 26 OBPED SIG *20, DW DW DW W I DW DW DW DW DW DW DW DW 23, 24 A 27 * 5 SECTION MEAD WIRING SCHEDULE CONDUIT SIZE WIRE SIZE �2„ 3-8/C, 1-2/C, 2-#1- 1" 1-2/C S.C. 2-#12 S.C. 4-#12 3" 1-8/17, 1-5/C 2" 2-2/C 1-�" 2-2/C 2" 2-#6 3" 1-11/C, 2-3/C, 2-8/C 2" 1-2/C 2" 1-8/C, 1-5/C, 1-2/C, 2-#10 2?" 2-8/C, 2-3/C, 1-2/C, 2410 2" 1-8/C, 1-5/C, 2-3/C, 2-#10 2-11/C, 5-8/C, 2-5/C, 4-3/C, 9-2/C, 2-#10 3" 2-8/C, 1-5/C 2" 3-2/C 11j 2-#6 11j 2-#10 2" 1-11/C, 2-#10 i" 2-#12 2" 1-11%C S N' v washingtor. ENGINEERS ARCHITECTS PLANNERS SURVEYORS A % %4